ML20080Q380

From kanterella
Jump to navigation Jump to search
Ro:On 831004,steam Jet Air Ejector Monitor (SRA-2905) Determined Inoperable & 8 H Grab Sample Not Completed within Required Time Frame.Followup Rept Expected within 14 Days
ML20080Q380
Person / Time
Site: Cook 
Issue date: 10/04/1983
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8310120379
Download: ML20080Q380 (1)


Text

_

5 9

n y

,,,,,, INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 468, Bridgman, Michigan 49106 (616) 465 5901 October 4, 1983 Mr. J.G. Keppler, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket Nos. 50-316

Dear Mr. Kcppler:

This is to confirm a notification made by our Mr.

B.A.

Svensson, Assistant Plant Manager, to Mr. James Belanger, NRC Operations Center, at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br /> on October 4, 1983.

At that time we reported that the Steam Jet Air Ejector Monitor (SRA-2905) was determined to be inoperable and the eight-hour grab sample was not completed within the required time frame.

As required by Technical Specification 6.9.1.12, a followup report will be submitted within 14 days.

Sincerely, (0)

W.G.

Sm1..

r.

Plant Manager

/bab cc:

John E.

Dolan M.P. Alexich R.F. Kroeger H..Brugger E.

Swanson/N. DuBry, RO:III R.C. Callen, MPSC G. Charnoff, Esq.

J.M. Hennigan R.O. Bruggee INPO PNSRC J.F. Stietzel E.L. Townley Dir., IE (40 copies) g Cir., MIPC (4 copies) 6 8310120379 831004 h

PDR ADOCK 05000316 S

PDR

--