ML20080Q342
| ML20080Q342 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/07/1983 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| 5211-83-289, NUDOCS 8310120360 | |
| Download: ML20080Q342 (2) | |
Text
_ _______ -____ _
GPU Nuclear Corporation Nuclear
- eme
- r8o o
s Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
October 7, 1983 5211-83-289 Office of Nuclear Reactor Regulation Attn: J. F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear S*.ation, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 TMI-1 Steam Generator Long-Term Corrosion Test Program Status Update This letter provides the quarterly update on the status of the TMI-1 Steam Generator long-term corrosion test program. As described in GPUN Topical Report 008, Rev. 3 p. 26-27, the program consists of four test loops con-taining TMI-l tube samples experiencing simulated plant operating life.
Key parameters are varied from loop to loop.
As of September 27, 1983, all four test loops are at normal operating tempera-tures in the listed operating cycles:
LOOP CYCLE TOTAL TEST HOURS 1
Operating #4 5162 2
Operating #4 5114 3
Operating #2 2120 4
Operating #2 2120 Aftor completion of the present cycles, two additional cycles will be run on each loop. The anticipated date for completion of the testing is May 15, 1984.
r(0g)/
8310120360 031007 PDR ADOCK 05000289 R
PDR O
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
1 k
Mr. J. F. Stolz 5211-83-289 4
Y Results of visual examination, eddy current testing and metallography of 4
C-rings continue to indicate that no corrosive attack is occurring.
Sincerely, 0
H. D.
kill Director, M -1 HDH:MJG:vjf cc:
R. Conte C. McCracken H.' S il ve r L
~~r-,-
- - - -,.,. _. - -., _ _ _ _ _,, _ _ _. _ __ _ _ _ _