Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000334/LER-1983-025-03, /03L-0:on 831009 & 10,nuclear Instrumentation Power Range Channel N41 Failed Downscale.Caused by Failed Connector in High Voltage Power Supply Cable.Cable Replaced + (12:32:40, 14 December 2024)
- RBG-16-294, Interim Deficiency Rept DR-138 Re ITE-Gould Motor Overload Relays & Trip Ranges.Investigation Incomplete.Next Rept Will Be Submitted by 831230 + (12:32:41, 14 December 2024)
- ML20082A412 + (12:32:42, 14 December 2024)
- ML20082A408 + (12:32:44, 14 December 2024)
- 05000318/LER-1983-059-03, /03L-0:on 831011,following Trip,Dose Equivalent I-131 Determined to Be 1.03 Mci/G.Caused by Leaking Fuel Pins & Power Level Change.Sampling Frequency Increased + (12:32:45, 14 December 2024)
- ML20082A398 + (12:32:46, 14 December 2024)
- 05000247/LER-1983-039-99, /99X-0:on 831017,while in Cold Shutdown,Pin Hole Leak Identified in Supply Line to Water Box 21-2.Caused by Internal Corrosion.Pipe Weld Repaired & Fan Cooler Satisfactorily Retested + (12:32:48, 14 December 2024)
- 05000282/LER-1995-002, :on 950205,noticed That SFP CAM Not Operating. Caused by Broken Drive Belt.Cr Operator Notified & SFP Normal Ventilation Secured + (12:32:50, 14 December 2024)
- ML20082A388 + (12:32:51, 14 December 2024)
- ML20082A391 + (12:32:51, 14 December 2024)
- ML20082A385 + (12:32:52, 14 December 2024)
- 05000247/LER-1983-035-03, /03L-0:on 831004,brief Interruption in 6.9 Kv Power Experienced.Caused by Malfunctioning Westinghouse PMG-13 Pilot Wire Monitor & Transfer Tripping Relay & Transfer Trip Section.Breakers Reclosed + (12:32:53, 14 December 2024)
- ML20082A376 + (12:32:54, 14 December 2024)
- ML20082A375 + (12:32:55, 14 December 2024)
- ML20082A372 + (12:32:56, 14 December 2024)
- ML20082A373 + (12:32:56, 14 December 2024)
- ML20082A356 + (12:32:57, 14 December 2024)
- ML20082A355 + (12:32:57, 14 December 2024)
- ML20082A350 + (12:32:58, 14 December 2024)
- ML20082A348 + (12:32:59, 14 December 2024)
- ML20082A344 + (12:32:59, 14 December 2024)
- ML20082A339 + (12:33:00, 14 December 2024)
- 05000318/LER-1983-056-03, /03L-0:on 831011,during Shutdown Operations, auto-start Failure Alarm Received for LPSI Pump 22.Pump Did Not Restart & Charging Spring Deenergized.Caused by Interlock Switch Out of Adjustment + (12:33:01, 14 December 2024)
- 05000334/LER-1983-031-03, /03L-0:on 831006,low Alarm Received on Acoustic Monitor FZ-RC-100B for Pressurizer Relief Valve.Channel Reset But Alarm Continued.Caused by pre-amp Bias Adjust Potentiometer Adjustment Drift.Unit Adjusted + (12:33:03, 14 December 2024)
- 05000293/LER-1983-053-03, /03L-0:on 831007,during Planned Shutdown,Reactor Scram Occurred,Causing Group 1 Containment Isolation.After Signal cleared,MO-220-2 Could Not Be Opened.Caused by Grounded Armature on Motor Operator + (12:33:05, 14 December 2024)
- ML20082A312 + (12:33:06, 14 December 2024)
- L-83-485, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-18 & 50-251/83-18.Corrective Actions:Gas Calibr Results Will Be Compared More Closely W/Previous Results + (12:33:07, 14 December 2024)
- ML20082A284 + (12:33:07, 14 December 2024)
- L-83-493, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-18 & 50-251/83-18.Corrective Actions:New Gas Calibrs Begun in Aug.Draft Responding to Violations Mistakenly Transmitted & Should Be Disregarded + (12:33:09, 14 December 2024)
- ML20082A259 + (12:33:09, 14 December 2024)
- 05000333/LER-1983-040-03, During Testing of post-accident Sampling Sys,Deuterium & Oxygen Sampling Sys Inoperable.Caused by New Mod.Change to Tech Specs Allowing short-term Isolation Initiated + (12:33:11, 14 December 2024)
- ML20082A227 + (12:33:12, 14 December 2024)
- ML20082A236 + (12:33:12, 14 December 2024)
- ML20082A223 + (12:33:13, 14 December 2024)
- ML20082A216 + (12:33:14, 14 December 2024)
- ML20082A210 + (12:33:14, 14 December 2024)
- 0CAN079105, Forwards Corrected, Semiannual Radiological Effluent Release Rept for Third & Fourth Quarters,1990. Submittal Includes Discussion of Two Unplanned Releases Into Discharge Canal + (12:33:15, 14 December 2024)
- ML20082A209 + (12:33:15, 14 December 2024)
- ML20082A198 + (12:33:16, 14 December 2024)
- ML20082A174 + (12:33:17, 14 December 2024)
- ML20082A181 + (12:33:17, 14 December 2024)
- JSP-442-91, Application for Amend to License NPF-62,changing Tech Spec 3/4.3.2 Re Containment & Reactor Vessel Isolation Control Sys + (12:33:18, 14 December 2024)
- ML20082A160 + (12:33:19, 14 December 2024)
- ML20082A130 + (12:33:20, 14 December 2024)
- RBG-41252, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-458/94-22.Corrective Actions:Aprm G Bypassed & LPRM Placed in Required Positions + (12:33:20, 14 December 2024)
- ML20082A112 + (12:33:24, 14 December 2024)
- 05000271/LER-1983-026-03, /03L-0:on 830928,during Insp of Standby Liquid Control sys,3/4-inch Leak Test Valve SLC-36 Found Open. Caused by Inadequate Controls in Recirculation Loop Decontamination Procedure + (12:33:25, 14 December 2024)
- ML20082A109 + (12:33:26, 14 December 2024)
- RBG-16-354, Forwards Responses to Draft SER Open Items Re Mechanical Fracturing Analysis & Fuel Assembly Damage by External Forces.Response to Item 10 Re TMI Item II.F.2, Inadequate Core Cooling, Will Be Provided by Dec 1983 + (12:33:27, 14 December 2024)
- ML20082A106 + (12:33:28, 14 December 2024)
- 05000289/LER-1983-040-01, /01T-0:on 831017,19 & 20,releases Made from Industrial Waste Treatment & Filter Sys w/RM-L12 Inoperable. Caused by Issuance of Immediately Effective Amend on 831014 W/O Util Knowledge Until 831021 + (12:33:32, 14 December 2024)
- ML20082A095 + (12:33:33, 14 December 2024)