_ COOPER NUCLE AH ST ATioN Nebraska Public Power District
"" "
- R ""O"J'n; nN."R" "'" -
"~
w-_
-CNSS918711:
July 3,-1991-Document Control Desk U. S. Nuclear _ Regulatory Commission Washington, D.C.
20555
' Subj ect :
Monthly Operating Status Report. for June 1991, Docket No. 50 298._
Gentlemen:
Enclosed for your information-and use is the Cooper Nuclear Station Monthly Operating Status Raport for June 1991. -The report includes operating Status,
- Average Daily Unit. Power Level, Unit Shutdown Data and a Narrative' Summary of Operating' Experience.
-Should-you have'anyfcomments, or' require additional information regarding this-report, please_ contact me.
Sincerelyi fcA.
J. M.- MeacLam Division hanager of Nucleat Operations
- JM":EAl' kup Er&c.ps cc:
C. D."W3tson w/ enclosures-
- 1. D 1;1crtin w/ enclosures 4
Ebet L. W. Jatkins w/ enclosures
,c C. R. Horn w/ enclosures R..E..Wilbur.v/ enclosures D. A.-Whitman w/ enclosures K. C. Walden v/ enclosures
- ?
2D. E. Foland_w/ enclosures s'
R = J. Singer _ w/ enclosures T. L n"ady w/ enclosures T. ' J. Oakes w/ enclosures o"
A. J. Hubl-w/ enclosures b
- D. J. - Schaecher w/ enclosures.
J;.L. Citta w/ enclosures P.~L. Ballinger'w/ enclosures-D. L, Danielson w/ enclosures T. H. Black.w/ enclosures
.L. E.' Bray w/ enclosures INPO Racords Center w/ enclosures R. W. Beck and-Associates w/ enclosures g
L ANI Library w/ enclosures.
NRC Senior Resident-Inspector w/ enclosures J.'N Grace w/ enclosures H, J. Green w/ enclosures F. E. Yost w/ enclosures Y % 1'o7100275 910703 hp-PDR ADOCK 05000298
)
{
.R PDR
. ~. -., _.
~.
4
\\
,r OPERATING DATA REPORT DOCKET NO.
050-0298 UNIT _CNS DATE July 3. 1991-OPERATING STATyj TELEPil0NE (402) 825-5766 3
. Unit Name:
Cocoer Nuclear Station Notes
- 2.
Reporting Period:
June 1931 3
. Ucensed Thermal Power (MWt):
2381 4.
Nameplate Rating (Gross MWo);
836 5.
Design Electrical Rating (Not MWe): 778 6
Maximum Dependable Capacity (Gross MWe): 787 7.
Maximum Dependable Capacity (Not MWe):
764 Sc-
' If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Oive Reasons:
g.
Power Level To which Restricted, if Any (Not L1Wo):
10.
Reasons For Restriction,if Any:
This Month Yr.-to-Date Cumulative 11..
Hours in Reporting Period 720.0 4.343.0 149.016.0 12.
Number of Hours Reactor Was Critical 720.0 4.212,J._
113.814.1 13 Reactor Reserve Shutdown Hours C A.,
0.0 0.0
- 14.
Hours Generator On-Une -
720 0 4.182.7 112.123.7 15.
Unit Reserve Shutdown Hours.
0.0 0.0 00
' 18.
Gross Thermal Energy Generated (MWH) 1.670.400.0 9.701.376.0 228.293.500.0 17.
Gross Electric Energy Generated (MWH; 550.645.0 3.239.333 0 73.848.743.0 18.
Net Electdc Energy Generated (MWH) 534.738 0 3.141.058 0 71.267.638.0
- 19. -
~ Unit Service Factor -
100.0 96.3 75.2 20.
Unit Availabliity Factor 100.0 96.3 75.2
- 21.
- Unit Capacity Factor (Using MDC Net) 97.2 94.7 62.6 22.
Unit Capacity Factor (Using DER Net) -
95 5 93.0 61.5 23.
Unit Forced Outage Rate
- 0.Q_
0.0 4.6 24.
Snutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling.and Maintenance Outcae 14. scheduled October 1991. 8 week duration.
25, if Shut Down At End of Report Period, Estimated Date of Startup:
N/A 26.
- Units in Test Status (Prior to Comrnercial Ops ation):
Fcrecast Achieved INITIAL CRITICAUTY INITIAL ELECTRICITY COMMERCIAL OPERATION w
,..... - - -,. -...~.-....
y-;_
3 3.z i ATTERAGE DAILY-UNIT POWER LEVEL DOCKET NO.
050-0298 UNIT CNS DATE.
July 3, 1991 1
TELEPHONE
.f402) 825-5766 z: MONTH---
June 1991
~
DAYI AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
-(MWe-Net) l' 741.
17-714-606 la 712
'3 -
71Q.
19 714
-4 762 20 730
.5' 755 21-748 6
761'
.22
-755
' 7 761-23 754 8
768 24 767
. 9-751 25-767 s
10 --
767 26 763 p
. lli
~766 27 757 l-
- la.
763 28 7h.13-760 29 744
- 14 758 30 737-
. 15_
761 31 16...
671 p
' INSTRUCTIONS.
l-Onjthis format, list the average daily unit power level in MWe-Net for each
-day in..the reporting month. -Compute to the nearest whole megawatt.
H s
i UNITSHUTDOWNS AhD POWER REDUCTIONS DOCKET NO.
0504J298 UNIT NAME Cooper Nuclear Station'
{
.l DATE July 3.1991 COMPLETED BY '
E. A. Kernes ' '
.]
TELEPHONE (4021825-5766 REPORT MONTH June 1991 Method Of Licensee ~
Cause & Ceective 5
Dumtion Shutting Et r.t System
- Component Actuto i
2 3
No.
Date Type (Hours)
Reason Down Reactor Report O*
Code Pr rent Recumoce NONE l
f b
t 1
F: Forced 2
Reason:
3 Method-4 Exhibe G - Instructor sf x S: Scheduied A - Equipment Fa3ure (Explam) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licenzee Event C-Refue6ng 3-AutomaticScram Report (LER) File (NUREG4161)
D - Regu! story Res+nction 4-Contnued E - Operator Training & License Examinaten 5-Reduced Load 5 Exhibit I-Same Source F - Admmistrathe 6 - Other G - Operatiasl Error (Explain)
H - Other (Explain)
h OPERATIONS NARRATIVE COOPER NUCLEAR STATION JUNE 1991 NORMAL POWER OPERATION WAS EXPERIENCED DURING THE MONTH OF JUNE.
A CAPACITY FACTOR OF 97.2% WAS ACHIEVED FOR THE MONTH.
l
_ _ _ _ _ _ _ _ _ _ _,