OPERATING DATA REPORT
+
DOCKET NO.
50 317 DATE 11/9/83 COMPLETED BY Elaine Latito TELEPHONE (301) 7&Z.-5363 OPERATING STATUS Calvert Cliffs #1 Notes
- 1. Uni: Name:
- 2. Reporting Period; October 1983 2,700
- 3. Licensed Thermal Pov.ee('lWI):
9I8
- 4. Nameplate Rating (Gross MWep:
845
- 5. Design Electrical Rating INet MWe):
860
- 6. Maximum Dependable Capacity (Gross MWe1:
825
- 7. Masiruum Dependable Capacity (Net MWe):
- 8. If Charges Oect;r in Capacity Ratinp life.ns Nunter 3 inrough 7) Since Last Report.Gise Renons.
- 9. Power Lese! To hhich Hestrieved. lf Any (Net MWel:
- 10. Reasons For Resenctions.lf Any-
- lhas Month Yr.-to Date Cs.mubtive 745.0 7,296.0 74,365.0
- 11. Hours In Reporting Period
- 12. Number O( Hones Reactor Was Critical 0.5 6,286.5 59,382.4
- 13. Reactor Rese ve Shutdown Hours 0.0 58.7 1',867.2
' 14. Hours Generatee On-Line 0.5 6,248.7 58,272.6,
- 15. Unit Resene Shutdown Hours 0.0 0.0
~.0 0
0 15,837,842 142,507,888
- 16. Gross Thennel Energy Generated IMWH)
O 5,471,169
__47,072,112
- 17. Cross Electrical Energy Generated IMWHI 0
5,137,708
- 18. Net Electrical Energy Generated (MWHI
_ 44,901.916
- 19. Unit Sersice Factee
-0.1 85.7 78.4
- 20. Unit Asailability Factor 0.1 85.7 78.4
- 21. Unit Capacity Factor IUsing MDC Net, 0.0 87.0 74.2
- 22. Unit Capacity Factor (Uning !)ER Net) 0.0 85.0 71.5 0.0 2.7 7.5
- 23. Ucit Forced Outage Mate
- 24. Shutdowns Scheduled 0.cr Nest 6 Months (Type.Date.snd Duration of Eacht:
No. I began a 14 week olanned outage on 10/1/83 for refueling and unit general inspection.
- 29. N Shut Down At End Of Report Perwid, Estimated Date of Startup:
1/9/84
- 24. Uniss in Tess Statos lPri,er se Commercial operativet:
Foreces Achiesed INITIA L CRITICA LITY.
INITIAL ELECTRICITY COWetERCIAL OPER ATION 8311100054 831109 PDR ADOCK 05000317 6 g4 (4/77)
R PDR
/i
OPER ATING DATA REPORT DOCKET NO.
50-318 DATE - 11/9/83 COMPLETED BY Elaine Lotato TELEPHONE (301) 78h5363 OPERATING STATUS Calvert Cliffs #2 Notes X. Unit Name:
October 1983
- 2. Reporting Period:
- 3. Licensed Thermal Pow er (MWI):
2,700 913
- 4. Nanieplate RatingiGross MWel:
845
- 5. Design Electrical Rating INet MWe):
a60
- 6. Maximum Dependable Capacity IGross MWe):
825
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Charges Oect:r in Lap.5 city Rating:5 tite.ns Nunter 3 Throgh 7) Since Last Report.Gise Tleawns.
- 9. Fouer Leici To hhich Restricted.If Any (Net MWe):
- 10. Reasons For Restrutions. If Any:
This Month Yr..to.Date Ct.mulative 745.0
- 11. Hours In Reportmg Period
_ 7,296.0 57,720.0
- 12. Number Of Houca Reactor Was Critical 540.5 6,481.2 48,582.1
- 13. Reector Rescrve Shutdown Hours 14.0 157.0
_ _ _ 952.2
- 14. Hours Generator On-Line 536.2 6,268.6 47,811.5,
- 15. Unit Resene Shutdown linur, 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated lMWH1 1,269,014 16,252,676 118,473,433
- 17. Cross Electrical Energy Generated IMWH) 423,125 5,301,453
_ 38,957,657
- 18. Ne Electrical Energy Generated (MWH) 399.873 5.053.073
__ 37,143,835
- 19. Unit Service factor 72.0 85.9 82.8
- 20. Unit Availability Factor 72.0 85.9 82.8 65.1 84.0 79.0
- 21. Unit Capacity Factor IUsing MDC Neti 63.5 82.0 76.2
- 22. Unit Capacity factor iUsing DER Net) 28.0 7.4 5.7 l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled O.,c. Nest 6 Months (Type. Date,and Duration of EachI:
1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY.
INiilAL ELECTRICITY COMMERCIAL OPER ATION L
(9/77) l
- - ~.-. -
AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50_317 Calvert Cliffs #1 UNIT DATE 11/9/83 Elaine Lotito COMPLETED BY (301) 787-5363 TELEPHONE MONTH October 1983 DAY AVER AGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net)
(MWe NetI
'l 17 2
18 3
39 4
20 S
5 21
~
6 22 7
23 e
9 25 10
~
~
26 II 27 12
~
~
28
'13
~
29 14
~
~
30 15 31 t'
16 INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in the r: porting month. Compete to the nearest whole megawatt.
(9/77) l l
4
- - ~.
--e
,,w en<
,,mm-w n
L
- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-318 UNIT calvert Cliffs #2 11/9/83 DATE Elaine Lotito COMPLETED BY
. TELEFPIONE
~
October 1983 MONTil DAY AVER ACE DAILY POWER LEVEL DAY AYERAGE DAILY F0WER LEVEL (Mhe Net)
(MWe Net) 03d 3
g 840 2
gg 839 3
g 347
'4 823 20 581 5
684 23 588 838 6
22 591 7
829 23 640 606 8
24 842 616 845 9
25 10-777 26 431 33 391 27 591 12 33 850 13 29 853 14
.30 890 15 33 850 16 INSTRUCTIONS On this format, list the average daily unit power levelin Mwe. Net for each day in the reporti9g month. Compete to the ricarest whole mepwati.
19/77) 4 4
50-317 DOCKETNO.
Lainrt clans 11 '
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME DATE 11/9/83 COMPLETED BY Elaine Latito-REPORT MONT11 October 1983 TELEPHONE (301) 187-5363 e
?
~.
5:
'E N...
Daic E-3) k 3 (E3 Licensee Ev Eq Cause & Cosacctive 5j
$?
Actium to 5
Esent yE 5
3 g, =!
Repost a eO E'
Pievent Recurrer:ce r
e O
be x
83-13 831001 S
74425 C
4 XX-FuelXX Refueling and unit general inspection.
i 1
)
i
't 4
i I
3 4
I F: Fosced Reason.
Method:
Ethibit G Instructiuns 5: Scheduled A Equiprnent Failure (Esplain) 1 Manual for Preparation of Data B-Mainienance ci Te::
2-Manual Sir am.
Entry Sheets fur Licensee C. Refuel.cg
.l-Autonat. Sciain.
Esent Repose ILERI File INUREG-D.Regr at.or) Rest ictiun 4ucon t inu.s t ion OlblI e
- l. Opesatos Tsainmg A Laccus: Esamination b-1.oM F.dm-ti n F Admir istraine 5
9-otha G-Oper.stion 1 Ensue IEsplain)
Esnibis 1 Sanne Source i
19/77) llother IE splain) i 5
,J
4 DOCrET No. 50-3Ia UNIT SHUTDOWNS AND POWER REDUCT10Ns -
L*NITNAME calvert Cliffs #2 DLTE 11/9/83 Elaine Lotito COMPLETEDRY REPORT MONTil ' October 1983 TELEPHO :g (301) 787-5363 e.
3 E
E j Ei Lwcasce jg h
Cause & Curs stive N..
Date k
3y
(
25d Event g
9T Actium t.s yE 3 ;j; =s Repost a m6 5L Pievent Recuteer.ce o
d 63-12 831004 S
19.0 B
5 XX ZZZZZZ To facilitate trouble shootirg #22 S/G Feed Pump Control Oil System.
]
83-13 831007 S
61.0 8
5 XX ZZZZZZ To freilitate trouble shooting #22 S/G Feed Pusp Onntrol Oil System.
83-14 831011 F
173.3 A
3 C8 PumpXX Replace #21 Reactor Coolant Pump Vapor Seal.
83-15 831019 F
99.0 B
5
~ Xx ZZZZZZ To complete repairs to #22 S/G Feed Pump.
83-16 831026 F
35.5 A
3 XX ZZZZZZ Electro-Hydraulic Cor. trol Pump tripped.
I i
j 4
I I
3 4
F: Fusced Re. son.
Mett.od:
E aibit G. Instructions S. Scheduled A Equgrnent Failure (Espl2in)
I.Wanual fur Preparation of Data 1
B Maintenance of Te t 2%nual Siram.
Entrv Sheets for Licensee C. Refueling 3 Autunat.e ksam.
Esent Repuel ILE RI File (NUREG.
D Regulat.or) Rettsi.; tion 4u00ntinuation PIhIi 1.-Operatos Tsaining A Lwcnse I:sannnation 5-1. carl P dm t M.
F Admin:straine 5
9-other G-0;xeatmnal Ensus t Esplain s Edibit 1 Seine Source (9/77)
Il4'ther ( E ss len) a
November 2,1983 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.
Scheduled date for next Refueling Shutdown: September 30,1983 3.
Scheduled date for restart following ' efueling: December 1,1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
September 1,1983 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that r.eload fuelinsertei into the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 732 Spent Fuel Pools are common to Units 1 and 2 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
1830 Licensed 1830 Currently Installed 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
.,.., - -,, - ~ ~. - -,
+.
November 2,1983 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2.
Scheduled date for next refueling shutdown: April 14,1984.
3.
Scheduled date for restart following refueling: June 3,1984.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
March 3,1984 6.
Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuelinserted in the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
- (a) 217 (b) 732 Spent Fuel Pool is common to Units 1 and 2.
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed 1830 Currently Installed 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 i
+
_,__.m.
....,,.,--._,.~,,7 y
_,,,._ _._..,.,,..,,,.,_..~ -
4
SUMMARY
OF UNIT 1 OPERATING EXPERENCE OCTOBER 1983 10/1 At the beginning of the reporting period, Unit I was reducing load in preparation for its 6th Refueling Outage. At 0032 the Unit was taken off the line and the reactor was shutdown at 0120. At 2020 the reactor was placed in cold shutdown.
10/3 Commenced draining the reactor coolant system at 0240.
10/19 Commenced refueling at 1958.
10/31 At the end of this reporting period, Unit I was shutdown for its 6th scheduled refueling outage.
e
- F-e
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE OCTOBER 1983 10/1 At the beginning of this reporting period, Unit 2 was operating at 836 MWe with the reactor at 100% power.
10/4 At 2135 commenced reducing power to 600 MWe to facilitate trouble shooting 22 S/G Feed Pump Control Oil System.
10/5 Load was increased to capacity (841 MWe) at 20001 10/7 At 2140 commenced reducing power to 600 MWe to facilitate trouble shooting 22 S/G Feed Pump Control Oil System.
10/10 Load was increased to capacity (832 MWe) at 1400.
10/11 The reactor tripped at 1138 on low S/G water level following the trip of 22 S/G Feed Pump. Failure of 21A Reactor Coolant Pump Vapor Seal necessitated a reactor cooldown to replace the seal.
10/19 At 1315 the unit was paralleled to the grid and reactor power increased to 70%.
Load was held at 70% awaiting the completion of repairs to 22 S/G Feedwater Pump.
10/24 Resumed full load operation (843 MWe) at 0200.
10/26 At 1242 the reactor tripped following closure of the main turbine valves when the operating EHC Pump tripped.
. 10/27 At 0353 the unit was paralleled and returned to full load operation (845 MWe) at 1300.
10/31 At the end of this reporting period, Unit 2 was operating at 847 MWe with the reactor at 100% power.
r-
- m BALTIMORE.
-GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 POSSIL POWER DEPARTMENT -
9 November 11, 1983 i.
Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Comunission Washington, D.C.
20055 ATTENTION:- Document Control Desk Centlemen:
i l-Enclosed herewith is the.0ctober 1983 - Operation Status Report for Calvert Cliffs No. 1 Unit, (Docket 50-317) and Calverc Cliffs No. 2 Unit, (Docket 50-318).
Sincerely, YA W.
E. H. Lotito-l-
Performance Data Analyser Production Economy and Results Unit Fossil Power Department'-
l Enclosure-l t
cct Messrs W. Lavallee J. Tiernan C. McCabe, Jr.
R. Architzel P. Krause L. Russell P. Ross P. Sierer, Jr.
M. Beebe C. Shoemaker D. Reilly R. Ash T. Magette V. Stricklin A. Lundvall l
l EML/bew f
wp/2/(NRC) f l
.-