Responds to NRC Re Violations Noted in Insp Repts 50-266/91-08 & 50-301/91-08.Corrective Actions:Violations Discussed & Reviewed at 910618 Supervisory Staff Meeting & Ad Hoc Committee Established to Investigate Violation
ML20082A198
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/03/1991
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-91-062, CON-NRC-91-62 VPNPD-91-212, NUDOCS 9107100223
Download: ML20082A198 (2)


Text

. - _.

r

~

Wisconsin Electnc POWER COMPANY

- 231 W Mcton PO Box 202. Nuee.WI 53201 Mu) N123e VPNPD 212 NRC 0 6 2 July 3, 1991 Document Control Desk 10 CFR 2.201 U.S.

NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, D.C.

20555 Gentlemen:

DOCKET NOS. 50-266 & 50-301 REPLY TO NOTICE OF VIOLATION INSPECTION REPORT NOS. 50-266/91008 AND 50-301/91008 POINT BEACH NUCLEAR-PLANT, UNITS 1 AND 2 By letter dated June 6, 1991, the subject inspection report and Notice.of-Violation were transmitted to us.

The violation cited three procedures as examples of documents for which the existing review measures were inadequate to prevent incorrect procedures fromDbeing issued.

We acknowledge the violation as stated.

Corrective actions taken to dateLinclude:-

1.-

Review and discussion of this violation by the Manager's Supervisory Staff-on June 18, 1991.

This discussion is documented in the meeting' minutes.

2.

Establishment of an.ad hoc committee-to investigate the details of each example of this violation to determino the root cause for the events.

The committee met on June 26, l'

1991.

The root cause of the events was determined to be L

~

essentially as stated in the inspection report.

The committee determined that PBNP 2.1.1,

" Classification, Review, and Approval of Procedures," and the forms associated with the review process are inadequate in that the term

" review" is not defined.

In addition, the committee recognized that accountability for

. achieving and maintaining high standards of quality needs to be emphasized to all persons involved in the life cycle of a procedure, from the original author.to the end user.

1

,hp hb

. b, )

f O

u I

6GUU2G ssuuu enunauteanim o

l f.*

Document Control Desk July 3, 1991 Page 2 3.

The results of the committee's review and its recommendations were presented to a quorum of the Manager's Supervisory Staff during a meeting held on June 27, 1991.

The recommendations were:

a.

Perform a detan ed evaluation of PBNP 2.1.1 and its associated forms, with special emphasis being placed upon defining the level and detail of reviews which are conducted for a procedure.

This activity will be completed by October 4, 1991.

b.

Develop and implement measures which emphasizes "self checking" during the life cycle of a procedure.

It is anticipated that these actions will be completed by January 31, 1992.

Please contact us if you have any questions concerning our actions in this matter.

Very truly yours, j

l/

g e :A htN h C/ '

C.. t Fay Vi c President Nuclear Power Copies to:

NRC Resident Inspector NRC Regional Administrator, Region III 1