July 1, 1991 U.
S.
Nuclear Regulatory Cormission Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. I and No. 2 IW-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License I;o. NPF-73 Generic Letter 90-06 The purpose of this letter is to modify the scheduled submittal date for a
proposed technical specification change to address those recommendations provided in Generic letter 90-06.
Our response to the Generic
- Letter, dated December 26,
- 1990, provided a plan to implement the improvements identified by the NRC to er. hance safety and improve the reliability of the Power operated Relief Valves (PORV's) and block valves.
We committed to submit proposed technical specification changes by the end of the Unit 1 eighth refueling outage in accordance with the schedule requested in the Generic Letter.
However, as a result of the ongoing NRC review of that submittal, we have discussed a revised submittal schedule with our NRC Project
- Manager, Mr.
A.
- DeAgazio, and have agreed that a revised schedule date would be established after the NRC has issued the reJults of their review.
If you have any questions regarding this submittal, please contact Steve Sovick at (412) 393-5211.
Sincerely,
,/
[.
D.
Sieber VVice President Nuclear Group cc:
Mr.
J.
Beall, Sr. Resident Inspector Mr. T.
T.
Martin, NRC Region 1 Administrator Mr.
A.
W.
DeAgazio, Project Manager Mr.
R.
Saunders (VEPCO) h 9107100302 9jo79g OR ADOCK OSU0ir334 i; i,'[