Consumers Power Jenm W Cook C0mpany vic, e,,,is. - er.i.
e.,i.,8.s o.1 Co.structio.
Gerera,8 Offices: 1945 West Parnett Road. Jackson, MI 49201 * (517) 78 & O453 November 10, 1983 liarold R Denton, Director Office of Nuclear Reactor Regulation Division of Licensing US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND ENERGY CENTER MIDLAND DOCKET NOS 50-329, 50-330 SUPPLEMENTAL RESPONSE TO GENERIC LETTER 82-33 FILE: B13.3 SERIAL: 26468
REFERENCE:
(1) CPC0 LETTER, SERIAL 21649, DATED APRIL 13, 1983, RESPONSE TO GENERIC LETTER 82-33 (2) CPC0 LETTER, SERIAL 26237, DATED OCTOBER 28, 1983, CONSTRUCTION COMPLETION SCHEDULE This letter provides Revision I to the Midland Emergency Response Capabilities (ERC) Schedule (see attached).
In accordance with our previous commiteent, provisions for this schedule revision were documented per Reference 1.
As you may be aware, the impact of the Dow termination and the delays in the approval of the CCP has changed many of the major schedule assumpticas in the Midland Plant Schedule. As a result, we are pretently re-evaluating that schedule for the completion of Unit 2.
Where possible, we have given dates in the ERC Schedule for information submittal, completion of construction, As the schedule for implementations of procedures and personnel training.
plant completion is established, it may become necessary to adjust these Wherever completion dates are not given, " prior to fuel load" has been dates.
Within six esnths following our new schedule announcement, we will provided.
submit a subseqwnt revision to this table modifying any dates as necessary.
Lg2#df JWC/CLH/mdb CC RJCook, Midland Resident Inspector 36D JGKeppler, Administrator, NRC Region III f
I I 0311180121 031110 PDR ADOCK 05000329 F
Pop oc1183-0658a100
CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329, 50-330 Letter Serial 26468 Dated November 10, 1983 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits Revision 1 to.the Midland Emergency Response Capabilities (ERC) Schedule.
CONSUMERS POWR COMPANY By W Cook, Vice President Pr cts, Engineering and Construction Sworn and subscribed before me this 14 day of November,1983 h
im12n i
Notfry~ Public _/
Jackson County, Michigan My Commission Expires September 8, 1984 L
.l '
' t~;
oc1183-0658a100
e TABLE 1: REVISION 1 MIDLAND ERC SCHEDULE w
FORECAST DATE 1
SPDS-A.
Safety Analysis Subnittal March 1984 B.
System Operational March 1984 C.
Operators Trained Prior to fuel load DCRDR A.
Submittal of Program Plan Completed January 15, 1983 B.
Final Report' Describing Completed March 31, 1983 Control Room Improvements C.
Implementation of Prior to fuel load Recommendations R.G. 1.97 A.. Implementation Report February 1984 B.
Implementation of Prior to fuel load Recommendations E0Ps A.
Submittal of Technical June 1984 Guidelines B.
Submittal of Procedures June 1984 Generation Package C.
E0P Implementation Prior to fuel load Integrated Training Plan A.- Training Completion Prior to fuel load
- ERFs c
A.
Submittal of Plan 1.
)RHEG - 0814 Response Completed Feb 19, 1982 2.
Staffing Information Completed Feb 15, 1983
& GOCC Description B.
Completion date for fully functional
'1.
TSC Prior to NRC Emergency Planning Appraisal 2.
OSC Prior to NRC Emergency Planning Appraisal 3.
EOF Prior to NRC Emergency Planning Appraisal 4.
GOCC _
Prior to NRC Emergency Planning Appraisal
- Training completion dependent upon fina1' resolution of the SPDS/DCRDR/
cEOF's/ Accident Monitoring Instrumentation /ERF submittals mil 183-0658b100
-