Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20086E576 + (07:21:19, 14 December 2024)
- ML20086E572 + (07:21:19, 14 December 2024)
- ELV-03223, Responds to Violations Noted in Insp Repts 50-424/90-19 & 50-425/90-19 on 900806-17.Corrective Actions:Procedure 00150-C Revised & Record Correction Notice Initiated to Correct Temporary Change Procedure 18028-C-7-90-1 + (07:21:20, 14 December 2024)
- ML20086E548 + (07:21:21, 14 December 2024)
- DCL-95-134, Forwards Rev 4 of Diablo Canyon Security Force Training & Qualification Plan.Encl Withheld Per 10CFR2.790(d) + (07:21:22, 14 December 2024)
- ML20086E532 + (07:21:22, 14 December 2024)
- ML20086E529 + (07:21:23, 14 December 2024)
- ML20086E528 + (07:21:24, 14 December 2024)
- ML20086E524 + (07:21:25, 14 December 2024)
- ML20086E517 + (07:21:26, 14 December 2024)
- 05000324/LER-1991-005-01, :on 910630,ESF Actuations Occurred When Floor Drain Isolation Valve Failed to Close on Group Ii/Div II Signal.Caused by Voltage Regulator Transient & Failure of solenoid-operated Valves.Solenoids Replaced + (07:21:27, 14 December 2024)
- ML20086E500 + (07:21:29, 14 December 2024)
- ML20086E498 + (07:21:30, 14 December 2024)
- L-95-016, Monthly Operating Repts for June 1995 for Point Beach Units 1 & 2 + (07:21:31, 14 December 2024)
- ML20086E483 + (07:21:33, 14 December 2024)
- ML20086E473 + (07:21:33, 14 December 2024)
- ML20086E460 + (07:21:34, 14 December 2024)
- ML20086E458 + (07:21:36, 14 December 2024)
- ML20086E447 + (07:21:37, 14 December 2024)
- ML20086E445 + (07:21:38, 14 December 2024)
- ML20086E439 + (07:21:40, 14 December 2024)
- ML20086E437 + (07:21:41, 14 December 2024)
- ML20086E432 + (07:21:42, 14 December 2024)
- ML20086E428 + (07:21:43, 14 December 2024)
- ML20086E418 + (07:21:44, 14 December 2024)
- ST-HL-AE-3932, Provides Response to Emergency Preparedness Exercise Weaknesses.Responses Include Description of Licensee Corrective Measures & Schedule for Completing Actions + (07:21:46, 14 December 2024)
- ML20086E411 + (07:21:47, 14 December 2024)
- ML20086E410 + (07:21:48, 14 December 2024)
- ML20086E408 + (07:21:50, 14 December 2024)
- ML20086E407 + (07:21:51, 14 December 2024)
- ML20086E405 + (07:21:53, 14 December 2024)
- ML20086E400 + (07:21:54, 14 December 2024)
- ML20086E393 + (07:21:55, 14 December 2024)
- ML20086E395 + (07:21:55, 14 December 2024)
- ML20086E388 + (07:21:57, 14 December 2024)
- ML20086E386 + (07:21:58, 14 December 2024)
- ML20086E385 + (07:21:59, 14 December 2024)
- ML20086E373 + (07:21:59, 14 December 2024)
- ML20086E359 + (07:22:00, 14 December 2024)
- ML20086E355 + (07:22:01, 14 December 2024)
- HL-1943, Forwards Rev 0 to Ei Hatch Nuclear Plant Unit 1,Core Operating Limits Rept for Operating Cycle 14 + (07:22:02, 14 December 2024)
- ML20086E346 + (07:22:03, 14 December 2024)
- HL-1941, Special Rept 1-91-009:from 910929-1029,all Fuel Removed from Reactor Vessel & Fire Barriers Inoperable for More than 14 Days.Caused by Need to Install Support Plates,Platforms & Conduits.Structural Beams Restored to Operable Status + (07:22:04, 14 December 2024)
- ML20086E336 + (07:22:05, 14 December 2024)
- ML20086E341 + (07:22:05, 14 December 2024)
- ML20086E330 + (07:22:06, 14 December 2024)
- ML20086E324 + (07:22:07, 14 December 2024)
- ML20086E322 + (07:22:09, 14 December 2024)
- ML20086E318 + (07:22:11, 14 December 2024)
- ML20086E308 + (07:22:12, 14 December 2024)
- B13960, Withdraws 900328 Proposed Changes Related to Surveillance Requirements 4.8.1.1.2.a.6 & 4.8.1.1.2.g.7,in Ref to TS Section 3/4.8 for Emergency Diesel Generator Reliability & Availability,Per 911028 Conference Call.Revised TS Encl + (07:22:13, 14 December 2024)