ML20086E532
| ML20086E532 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/06/1995 |
| From: | Sager D FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-95-199, NUDOCS 9507120073 | |
| Download: ML20086E532 (1) | |
Text
.-
4 6
Florida Power & Light Company. P.O. Box 128. Fort Pierce. FL 34954-0128 July 6, 1995 I: P L L-95-199 10 CFR 50.54 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Re:
St. Lucie Units 1 and.2 Docket Nos. 50-335 and 50-389 Guard Training and Qualification Plan - Revision 17 Florida Power and Light Company has revised the St. Lucie Plant Guard Training and Qualification Plan and has determined that the revision does not decrease the effectiveness of the plan.
Pursuant to 10 CFR 50.54(p), a report describing the revision and copies PSLTQP-R17-03 through PSLTQP-R17-06 are enclosed. :
Summary of the changes and a marked up copy of the revised pages. :
Directions for incorporating this revision into the plan, and copies of the replacement pages.
The enclosed material does not contain safeguards information as defined by 10 CFR 73.21.
By copy of this letter, we are forwarding copies PSLTQP-R17-01 and PSLTQP-R17-02 to the Nuclear Regulatory Commission, Region II.
Very truly yours, 4))'
l D. A.
ger Vice r sident St. Lu e Plant DAS/EJB Enclosure cc: Stewart D.
Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St. Lucie Plant n
- b000t h/
l 9507120073 950706 q\\ v/
ADOCK05000g5 PDR F
an FPL Group c pany