Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092G331 + (16:17:48, 13 December 2024)
- RA-20-0058, McGuire Nuclear Station, Oconee Nuclear Station, Sheraron Harris Nuclear Station and H. B. Robinson Steam Electric Station - 10 CFR 140.21 Guarantees of Payment of Deferred Premiums + (16:17:49, 13 December 2024)
- BECO-LTR-95-097, Monthly Operating Rept for Aug 1995 for Pilgrim Nuclear Power Station + (16:17:50, 13 December 2024)
- ML20092G323 + (16:17:50, 13 December 2024)
- 1CAN099501, Monthly Operating Rept for Aug 1995 for ANO Unit 1 + (16:17:51, 13 December 2024)
- 2CAN099501, Monthly Operating Rept for Aug 1995 for ANO Unit 2 + (16:17:52, 13 December 2024)
- ML20092G313 + (16:17:52, 13 December 2024)
- ML20092G307 + (16:17:53, 13 December 2024)
- RA-20-0057, Oconee Station, Shearon Harris Station, H. B. Robinson Station and Crystal River Station - Onsite Property Insurance Coverage + (16:17:54, 13 December 2024)
- ML20092G298 + (16:17:55, 13 December 2024)
- ML20092G305 + (16:17:55, 13 December 2024)
- ML20092G296 + (16:17:56, 13 December 2024)
- ML20092G290 + (16:17:57, 13 December 2024)
- ML20092G282 + (16:17:57, 13 December 2024)
- 05000254/LER-1984-009-04, :on 840519,while Performing Instrument Scram Response Test,Unplanned Reactor Scram Occurred.Caused by Workers Bumping IRM Signal Cable Under Reactor Vessel. Mechanical Maint Will Exercise Caution + (16:17:59, 13 December 2024)
- ML20092G278 + (16:18:00, 13 December 2024)
- BVY-95-101, Forwards Vermont Yankee Nuclear Power Station Cycle 18 COLR, Rev 2 + (16:18:01, 13 December 2024)
- 3F0995-04, Monthly Operating Rept for Aug 1995 for Crystal River Unit 3 + (16:18:02, 13 December 2024)
- ELV-03439, Forwards 10CFR50.46 Annual ECCS Model Changes Rept,Info Re Effect of ECCS Evaluation Model Errors/Changes on Current Unit 2 Analysis of Peak Cladding Temp Results & Plant Change Safety Evaluations + (16:18:03, 13 December 2024)
- ML20092G260 + (16:18:03, 13 December 2024)
- JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant + (16:18:04, 13 December 2024)
- HL-5028, Monthly Operating Repts for Aug 1995 for Ei Hatch Nuclear Plant + (16:18:05, 13 December 2024)
- ML20092G253 + (16:18:05, 13 December 2024)
- ML20092G246 + (16:18:07, 13 December 2024)
- ML20092G244 + (16:18:08, 13 December 2024)
- ST-HL-AE-5165, Forwards Request for Deviation from Commitment to 10CFR50, App R,Section III.G.2.c for Lack of Suppression in Fire Area 7 & Rev 0 of Thermo-Lag Assessment Rept for Hl&P STP Electric Generating Station + (16:18:09, 13 December 2024)
- 05000265/LER-1995-001, Informs of Commitments Being Made by Ltr Re Suppl Info Concerning LER 95-001 + (16:18:10, 13 December 2024)
- ML20092G213 + (16:18:10, 13 December 2024)
- ML20092G197 + (16:18:13, 13 December 2024)
- ML20092G179 + (16:18:14, 13 December 2024)
- ML20092G121 + (16:18:14, 13 December 2024)
- 0CAN029202, Forwards Inservice Testing Program Relief Requests 33 & PR-6 to Enable Use of Multiple Sets of Ref Values in Form of Curve for Monitoring Pump Hydraulic Performance,Per Insp Repts 50-313/91-30 & 50-368/91-30 + (16:18:15, 13 December 2024)
- ML20092G115 + (16:18:16, 13 December 2024)
- 05000395/LER-1995-004, :on 950813,surveillance Was Missed Due to Personnel Error.Completed Permanent Change to STP + (16:18:18, 13 December 2024)
- ML20092G113 + (16:18:22, 13 December 2024)
- ML20092G107 + (16:18:23, 13 December 2024)
- RBG-36487, Responds to Deviations Noted in Insp Rept 50-458/91-28 on 911118-22.Corrective Actions:Rev 5 to EDP-EQ-01, Training, Quality & Documentation Requirements for Procurement Documents Drafted to Provide More Specific Directions + (16:18:23, 13 December 2024)
- 05000271/LER-1992-002, :on 920115,discovered That Boron Concentration Check of Standby Liquid Control Tank Not Performed within TS Time Limits.Caused by Error in Surveillance Schedule. Surveillance Schedule Reviewed + (16:18:25, 13 December 2024)
- 05000254/LER-1995-005-08, :on 950812,B CR HVAC Sys Was Inoperable Due to Refrigerant Leak That Prevented Operation of Compressor. Fixed Damaged Joint & Inspected Remaining Joints + (16:18:28, 13 December 2024)
- ML20092G099 + (16:18:30, 13 December 2024)
- ML20092G093 + (16:18:31, 13 December 2024)
- ULNRC-03266, Monthly Operating Rept for Aug 1995 for Callaway Plant Unit 1 + (16:18:33, 13 December 2024)
- ML20092G088 + (16:18:33, 13 December 2024)
- RBG-41936, Interim Special Rept:On 950816,EDG Failed to Start During Monthly Operability Surveillance Due to Failure of Div II Starting Air Block & Vent Valve.Forward Block & Vent Valve Replaced & Surveillance Test Successfully Completed + (16:18:34, 13 December 2024)
- ML20092G081 + (16:18:37, 13 December 2024)
- ML20092G079 + (16:18:38, 13 December 2024)
- ML20092G078 + (16:18:40, 13 December 2024)
- ML20092G077 + (16:18:41, 13 December 2024)
- ML20092G072 + (16:18:42, 13 December 2024)
- ML20092G066 + (16:18:44, 13 December 2024)
- ML20092G067 + (16:18:44, 13 December 2024)