Forwards Forms NIS-1, Owners Data Rept for Inservice Insps & NIS-2, Owners Rept for Repair or Replacements. NIS-1 Forms Covers ISI Exams Conducted Between 900305 & 911115. NIS-2 Rept Cover Repairs Completed Between 900404 & 920110
ML20092G253
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/13/1992
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092G257 List:
References
C311-92-2014, NUDOCS 9202200044
Download: ML20092G253 (2)


Text

_...

OPU Nuclost Corpotetton t1 Nuclear

-o"~

Route 441 Seuth i

I

%ddletown, Pennsylvania 17057 0191 117 944 7621 TELEX 64 2386 Wnter s Onect Dial Numt>er:

(71)j 948-8005 Tchnnty 13, 1992 C311-92-2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (1H1-1)

Operating License No. DPR-50 Docket No. 50-289 Inservice Inspection (ISI) Data Reports in.ccordance with 10CfR 50.55a(g) and 1H!-l Technical Specifications, enclosed are Gpu Nucicar's forms HIS-1, '0wner's Data Report for Inservice Inspection" and NIS-2 " Owner's Data Report for Repairs or Replacements."

Two NIS-1 forms are enclosed. One NIS-1 form covers 151 first interval exaninations conducted between March 5, 1990 and November 15, 1991 which were conducted in accordance with the ASME Code, Section '1, 1974 Edition through Summer 1975 Addenda.

The second NIS-1 form covers 131 second interval examinations conducted between April 19, 1991 through November 15, 1991 in accordance with the ASME Code,Section XI, 1986 Edition with no Addenda.

Table 1 of the NIS-13rovides an abstract of the examinations performed.

-Table 2 provides an aastract of the corrective measures recommended and taken.

All conditions listed on Table 2, where Code acceptance criteria were exceeded, were determined to be operable upon inspection and evaluation.

Repairs were performed as indicated in the table to meet Code requirements.

These reports are being submitted in compliance with Subarticle IWA-6220 of the Codo.

The enclosed NIS-2 reports cover those repairs or replacements where ne documentation was completed between April 4, 1990 and January 10, 1992.

In accordance with Subarticle IWA-6220, only the NIS-2 reports describtng Class 1 or 2 component repairs or replacements need be submitted.

\\

92o2:00044 920213

/

i PDR ADOCK 05000209 1

l

'F o

PDR GPU Nuclea' Corpo<abon 6 a tut >ntai c: General Putac Unes Cowation

l Document Control Desk C311-92-2014 Page 2 Re> orts completed after January 10, 1992 will be included with our next su'mittal after the Cycle 10 refueling outage.

a Sincerely,

)QL llsw

1. G. Bt hton Vice President and Director, 1MI-l Enclostres MRK cc:

Region 1 Administrator 1MI-l Senior Project Manager 1MI Senior Resident inspector PA 00L1 fiartford Steam Boiler 1&l Co.