Informs That Code Repair on Main Steam Drain Line Was Completed on 950827.Repair Replaced Piping from Main Steam Header Sockolet Connection Up to & Including Degraded Elbow
ML20092G066
Person / Time
Site: Beaver Valley
Issue date: 09/08/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9509190098
Download: ML20092G066 (1)


Text

'

f Beaver VMiey Power Station Shippingport, PA 1$077-0004 l

4 2) 64 -806 FAX GFORGE S. THOMAS oms on vice Presioent September 8, 1995 Nuclear Services Nuclear Power Dmsion U. S. Nuclear Regulatory Commission Attention: Document Control Desk 5

Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Completion of a Code Repair on Main Steam Drain Line li"SIIPD-1-601-Q2 By letter dated May 4,1995, Duquesne Light Company (DLC) requested relief for a temporary non-code repair on main steam drain line li"SHPD-1-601-Q2.

This temporary repair was to be used until the next Unit 1 entry into Mode 5, when a code repair could be performed. The NRC provided written approval of this request by letter dated June 29,1995 (TAC No. M92165).

A code repair was completed on main steam drain line li"SHPD-1-601-Q2 on August 27,1995. The repair replaced the piping from the main steam header sockolet cormection up to and iricluding the degraded elbow. The integrity of the repair was verified during the system leakage examination, which was performed in accordance with the requirements of ASME Code Case N-416-1.

4 i

Sincerely, V

-c7 eorge S. Thomas c:

Mr. L. W. Rossbach, Sr. Resident Inspector

{

Mr. T. T. Martin, NRC Region I Administrator i

Mr. D. S. Brinkman, Sr. Project Manager 1

1

.<0007,3 9509190098 950908 PDR ADOCK 0500 4

j(

0 1

,