- ML20092M908 + (15:56:32, 13 December 2024)
- 05000397/LER-1984-054, :on 840529,turbine Governor & Intercept Valves Tripped Closed.Caused by Incorrect Overspeed Protection Control Test Techniques.Procedure Deviation Issued to Secure Testing Function + (15:56:34, 13 December 2024)
- ML20092M906 + (15:56:39, 13 December 2024)
- ML20092M904 + (15:56:40, 13 December 2024)
- LIC-95-0181, Forwards Fort Calhoun Station Seismic Evaluation Rept, Summarizing Results of USI A-46 Review,In Response to GL 87-02 + (15:56:41, 13 December 2024)
- ML20092M894 + (15:56:42, 13 December 2024)
- ML20092M896 + (15:56:42, 13 December 2024)
- ML20092M892 + (15:56:43, 13 December 2024)
- ML20092M887 + (15:56:44, 13 December 2024)
- AECM-84-0316, Special Rept 84-025/0:on 840509,smoke Detector N534C Alarmed & Would Not Reset.Caused by Accumulation of Dust Particles on Ionization Detector.Detector Replaced & Functional Check Performed.Zone Reset + (15:56:45, 13 December 2024)
- ML20092M880 + (15:56:45, 13 December 2024)
- ML20092M867 + (15:56:46, 13 December 2024)
- BECO-92-016, Submits Report of Insurance to Cover Property Damage to Pilgrim Nuclear Power Station Per 10CFR50.54(w) + (15:56:47, 13 December 2024)
- ML20092M845 + (15:56:48, 13 December 2024)
- ML20092M854 + (15:56:48, 13 December 2024)
- ML20092M836 + (15:56:49, 13 December 2024)
- GO2-95-194, Forwards Response to NRC Re Violations Noted in Insp Repts 50-397/95-07 & 50-397/95-13.Corrective Actions: on-coming Operator Questioned CRS & Obtained Permission to Close Valve + (15:56:50, 13 December 2024)
- ML20092M824 + (15:56:51, 13 December 2024)
- ML20092M830 + (15:56:51, 13 December 2024)
- ML20092M821 + (15:56:52, 13 December 2024)
- DCL-20-021, Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant and Humboldt Bay Power Plant + (15:56:53, 13 December 2024)
- ML20092M817 + (15:56:56, 13 December 2024)
- 05000483/LER-1992-003, :on 920123,during Startup,Closure of Feedwater Bypass Control Valves to Control SG Level Led to Turbine Trip.Caused by Attempt to Maintain Reactor/Turbine Power at Low Loads.Ts 3.2.2 to Be Revised + (15:56:58, 13 December 2024)
- 05000220/LER-1981-055-03, /03L-0:on 810605,visual Insp of Doors & Access Openings for Adequacy of Sealing Documented,But No Record Made of Test Using DOP & Freon.Caused by Vagueness in Procedure NI-RTP-38.Procedure Revised + (15:57:00, 13 December 2024)
- ML20092M802 + (15:57:01, 13 December 2024)
- ML20092M801 + (15:57:02, 13 December 2024)
- ML20092M787 + (15:57:03, 13 December 2024)
- ML20092M799 + (15:57:03, 13 December 2024)
- ML20092M785 + (15:57:04, 13 December 2024)
- ML20092M781 + (15:57:05, 13 December 2024)
- ML20092M769 + (15:57:05, 13 December 2024)
- ML20092M768 + (15:57:06, 13 December 2024)
- ML20092M767 + (15:57:07, 13 December 2024)
- ML20092M764 + (15:57:07, 13 December 2024)
- ML20092M757 + (15:57:08, 13 December 2024)
- BSEP-84-1482, Special Rept 2-SR-84-8:on 840519,fire Barrier Limiting Condition for Operation Issued to Permit Removal of Fire Barrier Located at Seal SW-3-022.Specified Time Frame Exceeded.Fire Watches Established Until Work Completed + (15:57:10, 13 December 2024)
- ML20092M752 + (15:57:10, 13 December 2024)
- ULNRC-03270, Submits Westinghouse Alloy 600 Re Steam Generator Mechanical Plugs.Util Currently Plans to Replace or Repair Plugs During Refuel 8 or Refuel 9 + (15:57:11, 13 December 2024)
- ML20092M747 + (15:57:12, 13 December 2024)
- ML20092M744 + (15:57:13, 13 December 2024)
- ML20092M736 + (15:57:13, 13 December 2024)
- ML20092M733 + (15:57:14, 13 December 2024)
- ML20092M730 + (15:57:18, 13 December 2024)
- 1CAN068406, Monthly Operating Rept for May 1984 + (15:57:19, 13 December 2024)
- U-602496, Forwards Proposed Change to QA Program Description Re Method Proposes to Use to Meet Procedure Adherence Guidelines Contained in ANSI N18.7-1976, Administrative Controls & QA for Operational Phase of Nuclear Power Plants + (15:57:22, 13 December 2024)
- BSEP-95-0501, Forwards Revs to Plant Emergency Procedures & Rev 42 to Radiological Emergency Response Plan + (15:57:23, 13 December 2024)
- 05000397/LER-1984-048, :on 840530,fuses Used in Class IE 250-volt Dc Sys Discovered Inappropriately Applied.Portions of Fuses Required to Return 250-volt Sys to within Design Basis Immediately Replaced.Balance Fuses Rescheduled + (15:57:24, 13 December 2024)
- ML20092M711 + (15:57:25, 13 December 2024)
- ML20092M710 + (15:57:26, 13 December 2024)
- ML20092M707 + (15:57:27, 13 December 2024)
- 05000220/LER-1982-024-03, /03L-0:on 840521,discovered That Documentation of Reactor Bldg Emergency Ventilation Sys Surveillance Test on 821019 Indicated Visual Insp Only of Doors & Access Openings for Sealing Adequacy + (15:57:28, 13 December 2024)