ML20092M711
ML20092M711 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 06/26/1984 |
From: | Krimm R Federal Emergency Management Agency |
To: | Jordan E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
Shared Package | |
ML20092M713 | List: |
References | |
NUDOCS 8407020366 | |
Download: ML20092M711 (2) | |
Similar Documents at Callaway | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K1051999-10-19019 October 1999
[Table view]Ack Receipt of Ltr Dtd 990707,which Transmitted Rev 29 to Callaway Plant Physical Security Plan,Under Provisions of 10CFR50.54(p).Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20217G2071999-10-14014 October 1999 Forwards Insp Rept 50-483/99-10 on 990913-16.No Violations Noted.Insp Was to Review Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise ML20217B5901999-10-0505 October 1999 Informs That Staff Concludes That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Callaway Plant,Unit 1 ML20217B5711999-10-0505 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & Uec Responses for Callaway NPP Unit 1 ,990224 & 990628.Informs That Staff Reviewed Responses & Concluded That All Requested Info for GL 98-01 Provided ML20212G0221999-09-22022 September 1999 Forwards Insp Rept 50-483/99-11 on 990812-20.No Violations Noted.Team Found,Weakness in flow-accelerated Corrosion Monitoring Program Resulted in No Previous Insp of Pipe Segment Which Failed ML20212D9341999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Callaway Plant.In Area of Ep,C/As Taken in Response to Problems Identified During Previous Exercises Warrant More in-dept Review.Details of Insp Plan Through March 2000 Encl ML20217D5791999-09-15015 September 1999 Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4921999-09-13013 September 1999 Forwards Insp Rept 50-483/99-08 on 990725-0904.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20212B1521999-09-10010 September 1999 Forwards Insp Rept 50-483/99-07 on 990809-13.No Violations Noted.Inspectors Used Annual Licensed Operator Requalification Exams to Assess Licensed Operator Performance ML20211N0321999-09-0202 September 1999 Forwards SE Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20211B0241999-08-18018 August 1999 Ack Receipt of Ltr Dtd 990714,transmitting Scenario for Licensee Upcoming Biennial Exercise.Based on Review,Nrc Determined That Exercise Scenario Sufficient to Meet Emergency Plan Requirements & Exercise Objectives ML20210T9121999-08-13013 August 1999 Forwards Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ML20210P0371999-08-10010 August 1999 Forwards SE Granting Licensee 980710 Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code for Second 10-year Interval ISI at Plant,Unit 1 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210H6381999-07-30030 July 1999 Forwards SE Accepting Relief Request for Approval for Use of Alternate Exam Requirement for Plant Inservice Insp Program A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20210B5611999-07-20020 July 1999 Forwards Review of Ltr & Encl Objectives for Plant,Unit 1,1999 Emergency Plan Exercise Scheduled for 990914 ML20210B4021999-07-19019 July 1999 Ack Receipt of Facility Emergency Plan Implementing Procedure EIP-ZZ-00101, Classification of Emergencies, Rev 23,issued on 990513,under Provisions of 10CFR50,App E, Section V ML20210B4401999-07-19019 July 1999 Ack Receipt of Revs to Facility Radiological Emergency Response Plan,Chapters 8.0 & 4.0,issued Respectively on 990512-14,under Provisions of 10CFR50,App E,Section V ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209E5591999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.TAC MA0531 Closed ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20196J9501999-07-0202 July 1999 Ack Receipt of Plant Ep,Rev 22,received on 981207 & Submitted Under Provision of 10CFR50,App E,Section V.Changes Does Not Decrease Effectiveness of EP & Continues to Meet Stds of 10CFR50.47(b).NRC Approval Not Required ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20196F8101999-06-25025 June 1999 Informs That J Donohew Will Assume Project Manager Responsibilities,Effective 990621 ML20196H2521999-06-25025 June 1999 Forwards Insp Rept 50-483/99-05 on 990502-0612.Two Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20196F8181999-06-24024 June 1999 Forwards RAI Re 990111 Request for Relief from Certain ASME Code ISI Requirements for Containment Liners.Response Requested within 30 Days from Date of Agreement ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve IR 05000483/19990041999-06-18018 June 1999 Refers to GL 96-05 Issued by NRC on 960918,UE Responses & 970313 & NRC Insp Rept 50-483/99-04,dtd 990427. Forwards Request for Addl Info Re GL 96-05 Program at Callaway Plant,Unit 1 ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H0971999-06-14014 June 1999 Discusses Une 990407 Request That Proprietary Document Entitled, Thermal Stability Assessment - Electrosleeved Tubes, Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20207H3751999-06-14014 June 1999 Discusses 990407 Une Request That Proprietary Version of Document Entitled, Evaluation of Severe Accident Simulation, Dtd April 1999,be Withheld from Public Disclosure.Determined Info Proprietary & Will Be Withheld ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20207G3201999-06-0707 June 1999 Ack Receipt of Change Notice 98-008 Dtd 980918,which Transmitted Changes to Callaway Plant Ep,Rev 21,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required.No Violations Identified ML20207G3151999-06-0707 June 1999 Ack Receipt of Callaway Plant EP Implementing Procedure EIP-ZZ-001001M,Classification of Emergencies,Rev 22,issued on 981222 Under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS 1999-09-22 Category:INCOMING CORRESPONDENCE MONTHYEARML20217D5791999-09-15015 September 1999
[Table view]Provides Formal Documentation of Reviews & Discussions Re Technical Ltr Rept for Proprietary Info.Review of Ltr Was Discussed in Telcon & Via e-mail Messages. Summary of Telcons as Documented on 990708,included ML20212A4701999-09-10010 September 1999 Rssponds to NRC 990709 RAI Re Util Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection Iwe. Acceptance Criteria for Liner Plate Pressure Boundary Thickness Will Be Limited to 10% Nominal Thinning ML20210R7241999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for 990101-990630,IAW 10CFR26.71(d) ULNRC-04085, Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power1999-08-11011 August 1999 Forwards Rev 4 to Callaway Plant Cycle 10 COLR, Per TS 6.9.1.9.COLR Has Been Revised to Update Rod Bank Insertion (Ril) Limits,As Function of Rated Thermal Power ULNRC-04079, Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Forwards 180-day Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ULNRC-04075, Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves1999-07-28028 July 1999 Forwards Response to NRC 990618 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of SR Motor-Operated Valves A93443, Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves1999-07-28028 July 1999 Forwards Addl Info as Committed to in Telcon Between Amerenue & NRC Personnel on 990616,re GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves ULNRC-04076, Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs1999-07-28028 July 1999 Informs of Implementation of Amend 131 to License NPF-30, Revising OL to Reflect Requirement in TS 3/4.7.1.7 for Four Operable ASD Lines & Associated Revs,Rather than Three Operable ASDs 05000483/LER-1998-008, Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved1999-07-27027 July 1999 Forwards Amended Response to GL 81-07, Control of Heavy Loads, to Address Corrective Action Described in LER 98-008-00.Discrepancy Between Earlier Submittals of Snupps Rept on Control of Heavy Loads & TS Re RHR Sys,Resolved ULNRC-04070, Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power1999-07-27027 July 1999 Forwards Rev 3 to Callaway Plant Cycle 10 COLR, IAW TS 6.9.1.9.COLR Has Been Revised to Update RAOC Axial Flux Difference (Afd) Limits,As Function of Rated Thermal Power ULNRC-04071, Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-021999-07-27027 July 1999 Informs That Util Anticipates Approx Ten Licensing Actions That Could Occur During Fys 2000 & 2001,in Response to Administrative Ltr 99-02 ML20212A3291999-07-15015 July 1999 Forwards Scenario Manual Containing Description of Callaway Plant 1999 Biennial Emergency Response Plan Exercise to Be Conducted 990914.Correspondence to Satisfy 60-day Submittal Requirement ML20209F3471999-07-0909 July 1999 Forwards Response to NRC 990624 RAI to Complete NRC Review of Relief Request to Allow Use of 1998 Edition of ASME Section Xi,Subsection IWE ML20209H2471999-07-0707 July 1999 Forwards Rev 29 to Physical Security Plan,Per 10CFR50.54(p). Rev Withheld,Per 10CFR73.21 ML20209C0171999-06-28028 June 1999 Forwards Special Rept 99-01 Re Fifteenth Year Inservice Containment Bldg Tendon Surveillance Failure.Observed Voids in Sheathing Filler Grease Do Not Indicate Degradation of post-tensioning Sys,Based on Encl Evaluation ML20209B6851999-06-28028 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Nuclear Power Plants. Disclosure Rept Encl ML20196G5621999-06-21021 June 1999 Informs NRC of Implementation of Amend 132 to Callaway License NPF-30 to Allows Installation of Electrosleeves for Steam Generator Tube Repair for Two Cycles Following Installation of First Electrosleeve ML20212J2441999-06-18018 June 1999 Submits Request for Alternate Exam Requirements for Plant Re ISI Program Plan.Plant Does Not Torque Bolted Connections to Stress Values Greater than 100 Ksi ML20195H9731999-06-11011 June 1999 Forwards Requested Addl Info Related to Relief Request ISI-16,encountered During Refuel 9 ML20195J9301999-06-0808 June 1999 Informs That Refuel 9 OAR-1 Owners Data Rept for ISI & Summary Rept for Interval 2 Was Submitted with Typographical Error,In That Commercial Service Date Should Be 841219,vice 941219.Please Substitute Encl Corrected Document ML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 A98803, Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS1999-05-27027 May 1999 Forwards Certified ITS & ITS Bases for Callaway Plant,In Response to NRC 990402 Draft SE for License Amend to Convert TSs to Format & Expanded Bases of ITS ML20196L2911999-05-19019 May 1999 Forwards Responses to NRC 990315 RAI Concerning GL 95-07, Pressure Locking & Thermal Binding of MOV Gate Valves A36791, Forwards Response to NRC 990510 RAI Re GL 96-06 with Respect to Analysis of Water Hammer & two-phase Flow Issues. Supporting Calculation Also Encl1999-05-17017 May 1999 Forwards Response to NRC 990510 RAI Re GL 96-06 with Respect to Analysis of Water Hammer & two-phase Flow Issues. Supporting Calculation Also Encl ULNRC-04034, Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions1999-05-17017 May 1999 Forwards Amerenues Risk Evaluation Summary & Provides Listing of Other Documents Which Have Been Previously Provided to Support Evaluation of Electrosleeves at High Temp Severe Accident Conditions 05000483/LER-1998-003, Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to 'A' SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept1999-05-12012 May 1999 Forwards LER 98-003-01 Re Inadvertent Actuation of ESFAS Due to 'A' SG High Level During Refuel 9.Rept Is Submitted to Report Change in C/A from That Reported in Original Rept ML20206Q9551999-05-12012 May 1999 Responds to NRC Re Violations Noted in Insp Rept 50-483/99-04.Corrective Actions:Une Commits to Make Available for NRC Review,Action Plan Outlining Scope & Completion Dates of Project ULNRC-04027, Forwards Comments on Draft SE Re Proposed Conversion to Improved Tss.Copy of ITS & ITS Bases Will Be Provided by 990524,to Support Issuance of License Amend on or About 9905281999-05-0404 May 1999 Forwards Comments on Draft SE Re Proposed Conversion to Improved Tss.Copy of ITS & ITS Bases Will Be Provided by 990524,to Support Issuance of License Amend on or About 990528 ML20206E3211999-04-28028 April 1999 Forwards Special Rept 98-03 Re Inservice Insp of CP Sgs,Per Plant TS 4.4.5.5.b.Insp Was Performed in Apr 1998 During Plant Ninth Refueling Outage.Rept Is Being Resubmitted Due to Typos in Original Rept ML20206E5781999-04-23023 April 1999 Informs That R Schukai Is No Longer Employed with Amerenue & Info Sent Is No Longer Required.Name Should Be Removed from Mailing Lists.Mailing Label Used by Company Which May Assist in Matter,Submitted ULNRC-04018, Submits follow-up Items Re Proposed Conversion to ITS Sections 1.0,3.3,3.4,3.6,3.7 & 3.9.Suppl to Ltr Will Be Submitted at Later Date1999-04-21021 April 1999 Submits follow-up Items Re Proposed Conversion to ITS Sections 1.0,3.3,3.4,3.6,3.7 & 3.9.Suppl to Ltr Will Be Submitted at Later Date ML20205Q7751999-04-16016 April 1999 Forwards Special Rept 98-03 Concerning ISI of Callaway SGs Performed in Apr 1998 During Callaway Plants Ninth Ro. Rept Documents Final SG Insp Results ULNRC-04015, Forwards Cash Flow Projection & Certification to Satisfy Guarantee of Payment of Retrospective Premiums,Per 10CFR140.211999-04-15015 April 1999 Forwards Cash Flow Projection & Certification to Satisfy Guarantee of Payment of Retrospective Premiums,Per 10CFR140.21 ULNRC-04005, Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.7901999-04-0707 April 1999 Forwards Proprietary & non-proprietary White Paper Entitled, Evaluation of Severe Accident Simulation, as Addl Info to Facilitate Approval of Requested Amend to Revise TS to Use Repair SG Tubes.Proprietary Info Withheld,Per 10CFR2.790 ULNRC-04004, Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld1999-04-0707 April 1999 Forwards Proprietary Thermal Stability Background Data Along with Time/Temp Graph Requested in 990402 Telcon with NRC & Contractor,Argonne Natl Lab.Proprietary Info Withheld ULNRC-04007, Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6 & 3.7.Encl Includes mark-ups of ITS Sections 3.5,3.6 & 3.8.Suppl to Ltr Will Be Provided at Later Date1999-04-0707 April 1999 Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6 & 3.7.Encl Includes mark-ups of ITS Sections 3.5,3.6 & 3.8.Suppl to Ltr Will Be Provided at Later Date ULNRC-04000, Forwards Rept Re Present Level of Insurance & Sources of Insurance Applicable to Callaway Plant,Per 10CFR50.54(w)1999-04-0101 April 1999 Forwards Rept Re Present Level of Insurance & Sources of Insurance Applicable to Callaway Plant,Per 10CFR50.54(w) ULNRC-03998, Forwards Required Financial Info Re Decommissioning Callaway Nuclear Plant,Per 10CFR50.751999-03-30030 March 1999 Forwards Required Financial Info Re Decommissioning Callaway Nuclear Plant,Per 10CFR50.75 ML20205G2211999-03-25025 March 1999 Submits Rev 28A to Callaway Plant Physical Security Plan, Incorporating Addendum Re Security Sys Replacement Transition Plan,Per 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20205R5251999-03-25025 March 1999 Forwards Special Rept 98-03 Re Results of Tenth SG Tube Inservice Insp,Per Requirements of Plant TS 4.4.5.5.b.Insp Was Performed in Apr 1998 During Plant Ninth Refueling Outage ULNRC-03988, Requests Approval of Alternative Exam ISI-12A Per 10CFR50.55a(a)(3)(i) & (II) for 1989 Edition of ASME Section IX,IWA-5242(a) for Class I Bolted Connections Inside Bioshield for RFO 101999-03-19019 March 1999 Requests Approval of Alternative Exam ISI-12A Per 10CFR50.55a(a)(3)(i) & (II) for 1989 Edition of ASME Section IX,IWA-5242(a) for Class I Bolted Connections Inside Bioshield for RFO 10 ULNRC-03991, Forwards 1998 Annual Rept of Individual Monitoring Results, Per 10CFR20.2206.Rept Provided in Electronic Format on Diskette IAW Gudiance of Reg Guide 8.7.Without Diskette1999-03-19019 March 1999 Forwards 1998 Annual Rept of Individual Monitoring Results, Per 10CFR20.2206.Rept Provided in Electronic Format on Diskette IAW Gudiance of Reg Guide 8.7.Without Diskette ML20204F7211999-03-17017 March 1999 Forwards Amended Fitness for Duty Program Performance Data for Six Month Period Beginning Jul-Dec 1998 ML20204E1331999-03-17017 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-483/99-02 on 990208-12.Corrective Actions:Will Revise Security Plan to Increase Min Staffing by Three Armed Security Force Response Personnel Per Shift ML20207C3631999-03-12012 March 1999 Forwards Exam Matl & Associated QA Checklist for Written Exam to Support Plant RO Retake Exam Scheduled for 990423. Exam Matls Requested to Be Withheld from Public Disclosure Until After Exam Completion 05000483/LER-1998-001, Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability1999-03-10010 March 1999 Forwards LER 98-001-01,being Submitted to Clarify Scope of Original Reviews Performed for Corrective Action Number 3 in LER 98-001-00.Reviews Have Identified Case of Failure to Properly Establish Equipment Operability ULNRC-03979, Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6,3.7,3.8,3.9 & 5.0.Suppl to Ltr Dtd 970515,will Be Provided at Later Date1999-03-0909 March 1999 Submits follow-up Items Related to Proposed Conversion to ITSs Sections 3.3,3.4,3.6,3.7,3.8,3.9 & 5.0.Suppl to Ltr Dtd 970515,will Be Provided at Later Date ULNRC-03975, Informs of No Reportable ECCS Evaluation Model Revs for Callaway During Time Period from Mar 1998 to Mar 1999,IAW 10CFR50.46.ECCS Evaluation Model Margin Assessment Encl1999-03-0505 March 1999 Informs of No Reportable ECCS Evaluation Model Revs for Callaway During Time Period from Mar 1998 to Mar 1999,IAW 10CFR50.46.ECCS Evaluation Model Margin Assessment Encl ULNRC-03971, Forwards Annual Personnel Exposure & Monitoring Rept for 1998, Per TS Sections 6.9.1.4 & 6.9.1.5.Rept Includes One Incident of Specific Activity Analysis of RCS in Which Limits of TS 3.4.8 Were Exceeded1999-02-26026 February 1999 Forwards Annual Personnel Exposure & Monitoring Rept for 1998, Per TS Sections 6.9.1.4 & 6.9.1.5.Rept Includes One Incident of Specific Activity Analysis of RCS in Which Limits of TS 3.4.8 Were Exceeded ML20207A4311999-02-17017 February 1999 Forwards semi-annual Fitness for Duty Program Performance Data Rept for Callaway Nuclear Plant for Period of 980701-981231 1999-09-15 Category:OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC MONTHYEARML19354E6981990-01-22022 January 1990
[Table view]Forwards Exercise Evaluation of Implementation of State & Local Radiological Emergency Response Plans Conducted 891011 for Callaway Nuclear Power Plant. Four Cited Deficiencies Remedied ML20244B1491989-04-0707 April 1989 Forwards Rept on 890222 Unannounced Drill for Offsite Radiological Emergency Response Plans for Plant.No Deficiencies Observed During Drill.Two Areas Requiring Corrective Action Identified at Listed Location ML20236E2861989-03-13013 March 1989 Ack Receipt of Package of Matl Re Plant,Providing Better Understanding of Coordination Between State of Mo,Util & NRC for NRC Responsibilities Under Section 106 of Natl Historic Preservation Act ML20154C3111988-06-0909 June 1988 Responds to NRC Request for Determination of Eligibility for Inclusion in Natl Register of Historic Places.Recommends Procedures Followed Under 36CFR63.3 & 800.4(c) & Seek Eligibility W/Missouri State Historic Preservation Officer ML20215L4271987-05-18018 May 1987 Forwards Callaway Nuclear Power Plant Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification. Facility Alert & Notification Sys Meets Requirements of NUREG-0654/FEMA-REP-1,Rev 1.W/o Encl ML20215G6641986-10-0707 October 1986 Forwards Exercise Evaluation of Implementation of State & Local Radiological Emergency Response Plans Conducted 860730. Two Noted Deficiencies Will Be Rectified at Rescheduled 861022 Remedial Exercise ML20134N4921985-09-0303 September 1985 Forwards Exercise Evaluation of Implementation of State & Local Radiological Emergency Response Plans Conducted 850605 .... Category B Deficiencies Failed to Detract from Demonstrated Capability to Protect Public Health & Safety ML20151R9631985-08-15015 August 1985 Responds to 850619 Request to Review Phase I Cultural Resource Survey & Assessment... & Cultural Resource Mgt Plan for Residual .... Repts Lacks Sufficient Discussion Re Research Values of Identified Archeological Sites ML20129H6661985-07-0909 July 1985 Notifies of Conditional Approval of State of Mo & Local Emergency Plans & Preparedness for Facility.Fema Must Verify That Public Alert & Notification Sys Meets Criteria of NUREG-0654/FEMA-REP-1 ML20129H6851985-07-0909 July 1985 Ack Receipt of State of Mo & Associated Local Radiological Emergency Plans,Including Evaluation of 840321 Full Participation Exercise & 840429 Remedial Exercise.Plans Adequate ML20093B9951984-09-14014 September 1984 Submits Supplemental Interim Finding Clarifying Adequacy of Offsite Planning.Plans & Preparedness Adequate to Protect Public Health & Safety ML20092M7111984-06-26026 June 1984 Forwards Evaluation of 840321 Exercise of Radiological Emergency Preparedness Plans & 840419 Remedial Exercise of Alert & Notification Sys ML20087N3251984-03-27027 March 1984 Forwards Interim Findings of Adequacy of Radiological Emergency Response Planning by State & Local Govts at Callaway Nuclear Power Plant, & State of Mo . State of Mo Will Complete Corrective Actions by 840519 ML20083M0311984-03-26026 March 1984 Confirms Understanding That FEMA Will Be Notified on or Before 840421,when Facility Remedial Alert & Notification Exercise Can Be Conducted ML20079J9991982-12-15015 December 1982 Forwards 821027 Rept in Response to NRC Request for Finding & Determination on Adequacy of Offsite Plans & Preparedness for Plant.Insufficient Factual Basis Available to Render Finding & Determination ML20064M9871982-08-27027 August 1982 Requests Attendance of NRC Contact at 821209 Public Hearing in St Louis,Mo to Answer Inquiries on NRC Procedures & Controls Re Radwaste Discharges from Plant ML20063G7661982-08-17017 August 1982 Notifies That FEMA Will Provide Updated Interim Finding on Evaluation of Revised State & Local Plans by 821101 ML20042B7171982-03-22022 March 1982 Comments on Fes,Correcting Info Re Radwaste Treatment Sys & Timing of Supporting Documentation for Draft EIS ML20042B7191982-03-19019 March 1982 Forwards FEMA Interim Findings Re Offsite Emergency Preparedness ML20069C2791982-03-0202 March 1982 Ack Receipt of Fes.Statement Being Reviewed at St Louis Area Ofc ML20041C5621982-02-26026 February 1982 Concurs W/General Measures Identified in Fes Page 5-17 Re Development of Mgt Plan for Eligible Sites on Plant Property as Part of Ol.Plan Should Be Developed in Consultation W/State of Mo Historic Preservation Officer ML20041C3161982-02-23023 February 1982 Requests Review of Encl List of Avoidance Locations,Per Review of Fes.Also Requests Update to Include Coordinates for Plant ML20041A9771982-02-17017 February 1982 Verifies Official Filing of Final EIS,NUREG-0813, Callaway Plant Unit 1,License,Callaway County,Mo. Notice of Availability Will Be Issued on 820219.Public Review Will Terminate on 820322 ML19303A2951981-11-23023 November 1981 Submits Review of Des,Citing Environ Reservation Re Lack of Detailed Descriptions of Gaseous & Liquid Waste Treatment Sys.Radiological Aspects,Radwaste Treatment Sys,Reactor Accidents & EIS Supporting Documentation Timing Discussed ML19303A2931981-11-12012 November 1981 Comments on Facility DES,NUREG-0813.Environ Pathways Identified in Sections 5.9.3.1,5.9.4.1 & Figure 5.2 Cover All Possible Emission Pathways That Could Impact on Population ML20009F3781981-07-0101 July 1981 Comments on Research Proposal for Cultural Resources Survey & Assessment of Plant Site.Proposal Is Under Ref & Demonstrates Lack of Familiarity W/Pertinent Research Questions ML20003B2711981-02-0505 February 1981 Comments on 790802 Presidential Directive on Interagency Consultation to Avoid or Mitigate Adverse Effects on Rivers in Nationwide Inventory.Gasconade River Included in Inventory Listing ML19252A2941979-11-0707 November 1979 Forwards Form S-7,util Registration Statement.Requests Comment ML20102B6831979-05-11011 May 1979 Forwards Complaint Re Concrete Placement at Facility,Per 790511 Telcon.Nrc Action Requested.Related Info Encl.Info Deleted 1990-01-22 |
Text
.
s
~
q Federal Emergency Management Agency 4 Washington, D.C. 20472 M 261964 O O MEMORANDUM FOR: Edward L. Jordan Division of Emergency Preparedness and Engineering Response Office of Inspe'ction and Enforcement u e j ission FROM:
Echard'W. bmm j Assisdant Associate rector ffice of Natural and Technological Hazards Programs
SUBJECT:
Exercise Report of the March 21, 1984, Joint Exercise of the Offsite Radiological Emergency Preparedness Plans for the Callaway Nuclear Power Plant Attached are two copies of the Exercise Report of the March 21, 1984, full participation joint exercise of the offsite radiological emergency preparedness plans for the Callaway Nuclear Power Plant. Also, in accordance with 44 CFR 350.9(c)(5), the report contains an evaluation of the April 19, 1984, remedial exercise to correct deficiencies observed in the March 21, 1984, exercise of the alert and notification system. The State of Missouri and'the Counties of Callaway, Gasconade, Montgomery, and Osage participated in the exercise. The May 8, 1984, report was prepared by Region VII of the Federal Emergency Management Agency (FEMA) and reflects the comments resulting from the Regional Assistance Committee review.
FEMA Region VII staff has furnished a copy of this report to the State of Missouri and will request a schedule of actions for correction of deficiencies.
As soon as we receive and analyze the State's response, we will send you our determination.
If you have any questions, please' contact Mr. Robert W. Wilkerson, Chief, t Technological Hazards Divisfoq, at 287-0200.
Attachments As Stated' 8407020366 840626 PDR ADOCK 05000s
Wkw . ZAw 3 Federal Emergency Management Agency 4 -W' Region VII 911 Walnut Street Kansas City, Missouri 64106 D MAY I 41984 i MEMORANDUM FOR: Samuel Spec , Associate Director State & Local Programs & Support FROM: Pat- 4 ny, Regional Director - FEMA Region VII
SUBJECT:
Sub ssion of the Exercise Report for the Evaluation of the Implementation of State and Local Radiological Emer-gency Response Plans for the Callaway Nuclear Power Plant. In compliance with 44 CFR Part 350 and your memo of August 5,1983, I hereby t submit three copies of the Exercise Report, dated May 8, 1984, for the eval-uation of the implementation of State and Local Radiological Emergency Response Plans for the Callaway Nuclear Power Plant exercise, March 21, 1984, and the April 19, 1984 Remedial Exercise of the Alert and Notification System for your review and approval. A Table of Contents is provided to assist in your review. Further documen-tation and related materials are retained and may be requested from FEMA Region VII, which is the office of record for this exercise evaluation. In my opinion, there is reasonable assurance that, in the event of an actual emergency, appropriate measures can and will be taken to protect the health and safety of the public. l
- . ..}}