Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095B394 + (13:49:54, 13 December 2024)
- ML20095B388 + (13:49:55, 13 December 2024)
- 0CAN049207, Forwards Revised Summary Data Point Library & Completed Detailed Database Required by NUREG-1394,per + (13:49:56, 13 December 2024)
- 05000423/LER-1992-008-01, :on 920317,plant Personnel Verified That Eight Valves Not Included in Svc Water Sys TS Valve Lineup.Caused by Procedure Deficiency.Change to Valve Lineup Procedure Written & Valves Verified in Correct Position + (13:49:58, 13 December 2024)
- 05000374/LER-1992-005-04, :on 920322, 2A DG Auto Started & RHR 2B Low Pressure Cooling Injection, 2C Low Pressure Cooling Injection & RCIC Sys Received Initiation Signals.Caused by Spike in Instrument Line.Procedure Revised + (13:50:01, 13 December 2024)
- ML20095B357 + (13:50:03, 13 December 2024)
- SNRC-1936, Advises That Util Endorses Request by Lilco to Amend Indemnity Agreement,Dtd 910429.Util Requests That NRC Amend Indemnity Agreement 87 to Replace Lilco W/Long Island Power Authority + (13:50:04, 13 December 2024)
- ML20095B315 + (13:50:07, 13 December 2024)
- ML20095B321 + (13:50:07, 13 December 2024)
- IR 05000329/1982014 + (13:50:23, 13 December 2024)
- ML20095B293 + (13:50:24, 13 December 2024)
- ML20095B288 + (13:50:25, 13 December 2024)
- ML20095B263 + (13:50:29, 13 December 2024)
- ML20095B250 + (13:50:30, 13 December 2024)
- ML20095B247 + (13:50:32, 13 December 2024)
- ML20095B245 + (13:50:32, 13 December 2024)
- ML20095B241 + (13:50:33, 13 December 2024)
- ML20095B237 + (13:50:34, 13 December 2024)
- B51956, 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations + (13:50:35, 13 December 2024)
- ML20095B210 + (13:50:35, 13 December 2024)
- 3F1295-03, Forwards Responses to NRC 951024 RAI Re TS Change Request 203 Concerning Small Vol Eddy Current Indication Disposition.Rept B51956-R1, Crystal River 3 8R/9R Bobbin Voltage (S/N) Growth Rate Calculations Also Encl + (13:50:38, 13 December 2024)
- 1CAN049202, Forwards Scoping Evaluation for Arkansas Nuclear One,Unit 1 Reactor Coolant Pumps Per Requirments of ASME Code Case N-481, Consisting of 1986 & 88 Insp Results & 1986 & 88 Fracture Mechanics Evaluations.W/One Oversize Drawing + (13:50:40, 13 December 2024)
- ML20095B157 + (13:50:43, 13 December 2024)
- ML20095B128 + (13:50:44, 13 December 2024)
- 05000498/LER-1992-003-01, :on 920314,reactor Trip Occurred from Momentary False Reactor Coolant Low Flow Trip Signal.Caused by Failure to Follow Procedures.Shift & Unit Supervisors Briefed. Reactor Trip Prevention Policy Established + (13:50:46, 13 December 2024)
- NRC-92-0028, Revises 911029 Response to Concerns Noted in Exam Rept 50-341/OL-91-01.Informs That Measures Taken to Strengthen Exam Security & Prevent Inadvertent Compromise.List of Outstanding Commitments & Required Changes Encl + (13:50:51, 13 December 2024)
- HL-2142, Documents Verbal Agreement Between Util & NRR Re Technical Questions on Physical Installation of Containment Hardened Vent,Per Generic Ltr 89-16.Schematic of Proposed Torus Hardened Vent Mod Encl + (13:50:52, 13 December 2024)
- ML20095B112 + (13:50:53, 13 December 2024)
- ML20095B107 + (13:50:54, 13 December 2024)
- ML20095B108 + (13:50:54, 13 December 2024)
- 05000265/LER-1992-008-03, :on 920316,false Initiation Signal Sent to Core Spray & 1/2 DG Sys Due to Design Deficiency from Human Factors Viewpoint W/Way Lead Wire Landed on Relay 1430-106A. Work Request Initiated to Correct Problem + (13:50:56, 13 December 2024)
- ML20095B104 + (13:50:57, 13 December 2024)
- ML20095B102 + (13:50:58, 13 December 2024)
- 0CAN049208, Requests Change to QA Program as Contained in QA Manual Operations. Change Establishes Alternative Method of Maintaining Procedures Current in Accordance w/10CFR50,App B in Lieu of ANSI N18.7,Section 5.2.15 + (13:50:59, 13 December 2024)
- ML20095B100 + (13:50:59, 13 December 2024)
- ML20095B098 + (13:51:00, 13 December 2024)
- ML20095B095 + (13:51:01, 13 December 2024)
- ML20095B090 + (13:51:02, 13 December 2024)
- 05000370/LER-1992-003-04, :on 920305,Train B of RHR Sys Declared Inoperable Due to Degraded Flow Path Caused by Equipment Failure.Emergency Work Request Generated to Repair Valve 2KC-82B + (13:51:04, 13 December 2024)
- HL-2153, Responds to NRC 920313 Request for Confirmation That All Piping Sys,Containing motor-operated Valves,Identified by Generic Ltr 89-10 Have Temp Monitoring Capability of Detecting Leak or Visually Inspected by Walkdown + (13:51:05, 13 December 2024)
- 1CAN049207, Monthly Operating Rept for Mar 1992 for Arkanses Nuclear One Unit 1 + (13:51:06, 13 December 2024)
- ML20095B062 + (13:51:06, 13 December 2024)
- ML20095B049 + (13:51:07, 13 December 2024)
- 05000277/LER-1992-004-02, :on 920317,HPCI Was Determined Inoperable Due to Isolation of HPCI Turbine Exhaust Drain Line.On 920316, Outboard Isolation Valve Closed Due to Inoperability of Inboard Isolation Valve.Valves Repaired + (13:51:09, 13 December 2024)
- ML20095B047 + (13:51:10, 13 December 2024)
- ML20095B046 + (13:51:11, 13 December 2024)
- 2CAN049201, Provides Info Requested Re Explosive Nature of Kinetic Weld Devices to Be Used in SG Tube Sleeving Process.Info Withheld (Ref 10CFR2.790) + (13:51:12, 13 December 2024)
- ML20095B044 + (13:51:12, 13 December 2024)
- RBG-36728, Forwards Informational Rept Re Electrical Device Failures in Standby Cooling Tower Fan Circuits During 901005-06.On 911002-03 & 901005-06,Gould J10 Relays Failed.Caused by Exposure of Relays to Low Temp.Components Replaced + (13:51:13, 13 December 2024)
- ML20095B032 + (13:51:19, 13 December 2024)
- L-92-107, Notifies That Access Authorization Program,Per 10CFR73.56 Established & Implemented.Subj Program Has Been Incorporated Into Plants Physical Security Plans,Per 920310 & 0403 Ltrs + (13:51:20, 13 December 2024)