Application for Amend to License DPR-66,consisting of Change Request 229,implementing Requirements of GL 95-05 for voltage-based SG Tube Repair Criteria
ML20095B104
Person / Time
Site: Beaver Valley
Issue date: 12/07/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20095B109 List:
References
GL-95-05, GL-95-5, NUDOCS 9512080131
Download: ML20095B104 (4)


Text

"..

'o De er Va ley Power Station ya, ,n,,-

(412) 643-8069 FAX EO.7v*c.'r$..Y[,*t December 7, 1995 tl::3: 1 .

U. S. Nuclear Regulatory Commission Attention: Document Control Desk

~ Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 229 Pursuant to 10 CFR 50.90, Duquesne Light Company requests an amendment to the above license in the form of changes to the technical specifications. The proposed

, changes will implement the requirements of Generic Letter (GL) 95-05 for voltage-based steam generator tube repair criteria.

The proposed technical specification changes are presented in Attachment A. The safety analysis (including the no significant hazards evaluation) is presented in Attachment B. A technical evaluation of the voltage-based repair criteria is presented in Attachment C. The first paragraph of Attachment C page 4 of 8 describes the confirmation rate for rotating pancake coil no detectable degradations (RPC NDD) left in service. For the next inspection, we are requesting NRC approval to apply the larger of 0.51 or the next inspection result as a fraction of RPC NDD indications included in the beginning of cycle distribution. This is consistent with GL 95-05 Section 2.b.1 which provides an option to apply a fraction of unconfirmed RPC NDD indications in the begiiming of cycle voltage distribution.

This change has been reviewed by the Onsite Safety Committee and Offsite Review Committee. The change was determined to be safe and does not involve a significant hazard consideration as defined in 10 CFR 50.92 based on the attached safety analysis.

Approval of this amendment is requested prior to the start of the Beaver Valley Power Station, Unit No. I eleventh refueling outage which is scheduled to start on March 23,1996. An implementation date will be established prior to amendment issuance.

Sincerely,

($60030 d"$r imp Geofge S. Thomas

\D Ygb 9512080131 951207 PDR ADOCK 05000334

. P ., . _ . . .PDR

^a-Beaver Valley Power Station, Unit No.1 Proposed Operating License Change Request No. 229 Page 2 c: Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager Mr. W. P. Dornsife, Director BRP/DEP Mr. M. P. Murphy (BRP/DEP) l l

^

AFFIDAVIT FOR APPLICATION OF AMENDMENT COMMONWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF BEAVER )

Subject:

Beaver Valley Power Station, Unit No.1 BV-1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 229 ,

Befose me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared George S. Thomas, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, infonnation and belief.

uzi i VGeorg S. Tiiomas Subscribed and sworn to before me on this? day of 1// h ,MfE L

Mw kbul 16ftdrv Publir- #

myARNNvyPdAc MyW#rfdE3EEsa7 ma,. mn- ~.

4 I

ATTACHMENT A Beaver Valley Power Station, Unit No. 1 l Proposed Technical Specification Change No. 229 <

4 l 1

)

The following is a list of the affected pages:

} Affected Pages: 3/4 4-9 j 3/4 4-10b  !

j 3/4 4-10c j i 3/4 4-10d