$Nppmgport. PA 15077 6 (412) 393 4255 JOHN D SIEBER Vice Pres.cerit - Nuclear Group April 10, 1992 U.
S.
Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 and No. 2 B'
1 Docket No. 50-334, License No. DPR-66 BV. Docket No. 50-412, License No. NPF-73 Annual Report of All Challenges to the Pressurizer Power Operated Relief Valves or Safety Valves This report 'is submitted in accordance with the Beaver Valley Power Station Units'No. 1 and 2 Technical specification 6.9.1.5.b.
Unit 1:
There were three challenges.to the pressurizer safety and power operated relief valves.(PORV) at Unit 1
during the period of January 1, 1991, to December 31, 1991.
1.
Date:
April 13, 1991 Plant Conditions:
Mode 4, RCS pressure was 300 psig, Overpres-sure Protection System (OPPS) was in service.
A cooldown to Mode 5 was in progress.
Summary:
Pressurizer Power Operated Relief Valve, PCV-RC-445C, opened while OPPS was in service due to RCS pressure slowly reaching 327 psig.
Pressure decreased to 303 psig and PORV reclosed.
2.
Date:
July 4, 1991 Plant Conditions:
Mode 4, RCS pressure was 315 psig, Overpres-sure Protection System (OPPS) was in service.
A cooldown to Mode 5 was in progress.
Summary:
Pressurizer Power Operated Relief Valve, PCV-RC-445C, opened for 37 seconds then reclosed, while reactor operator was controlling RCS pressure in a narrow band to maintain RC-P-1C seal delta-pressure and seal leakoff flow.
\\
l 92042hCWOS
~
- DR PDR O
I
_ _ _. ~
.._.. _ _ _ _ _. _ =_ _ __.. _. _.. _ _ _ _
_ _ _ _.. - - ~
Behver. Valley Power Station, Unit No. 1 and No. 2 e:
BV-1 Docket No. 50-334', License No..DPR-66 AV-2" Docket No. 50-412, License No. NPF-73 Annual Report of All Challenges to the Pressurizer Power Operated Relief Valves or Safety Valves AprilL7, 1992 Page-2 3.
Date:
September 21, 1991 Plant Conditions:
Mode 5,
RCS pressure was 360 psig, Overpres-sure Protection System (OPPS) was in service.
. Summary:
Pressurizer Power Operated Relief Valve, PCV-RC-455C, opened for 10 seconds then reclosed.
The cause for actuation wac unknown.
No over-pressure condition existed.
-Unit 12:
There-were no challenges to the pressurizer safety and power operated relief valves (PORV) at Unit 2 during the period of January 1,
1991, to Deceiaber 31,-1991.
Sincerely, D..S eber
/
cc:
'Mr.
L.. W.
Rossbach, Sr.
ResulenL Inspector Mr. T.
T. Martin, NRC Region 1 Administrator Mr. A. W.
DeAgazio, Project Manager Mr. M. L.. Bowling (VEPCO)
~
T 1
..