Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D2841999-10-0404 October 1999 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program Covering Sept 1999 ML20211Q6361999-09-0303 September 1999 Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program Covering Jul & Aug 1999 ML20211J4181999-08-30030 August 1999 Forwards Insp Rept 50-160/99-203 on 990119-21.No Violations Noted ML20210E9231999-07-22022 July 1999 Provides Responses to 990228 Comments on Georgia Tech Research Reactor Decommissioning Plan ML20210E9251999-07-22022 July 1999 Forwards Amend 14 to License R-97 & Safety Evaluation.Amend Authorizes Decommissioning of Gtrr,Per 10CFR50.82(b),IAW Decommissioning Plan,As Presented in 980701,990208 & 0528 Ltrs ML20210F3021999-07-22022 July 1999 Provides Responses to 990413 Comment on Georgia Tech Research Reactor Decommissioning Plan.Comment on Removal of Cobalt-60 Should Be Referred to State of Georgia ML20196K3381999-07-0202 July 1999 Forwards Copy of EA & Fonsi Related to Application for Amend Dated 980701.Proposed Amend Would Change Facility OL R-97, Authorizing Decommissioning IAW Proposed Decommissioning Plan ML20195C3531999-05-28028 May 1999 Forwards Environ Rept for Decommissioning of Ga Tech Research Reactor,Per NRC Regulation 51.53(d).Environ Rept Submitted in Apr 1994,encl ML20207A9581999-05-21021 May 1999 Ack Receipt of Re Comments on Georgia Tech Research Reactor Decommissioning Plan.Comments Will Be Considered as Part of NRC Ongoing Review of Decommissioning Plan ML20206R3061999-04-13013 April 1999 Submits Georgians Against Nuclear Energy Comments Re Intent of Georgia Tech to Decommission Neely Research Reactor at Georgia Inst of Technology,Atlanta,Ga ML20204G7561999-03-23023 March 1999 Ack Receipt of to Executive Director for Operations That Provided Comment on Georgia Tech Research Reactor Decommissioning Plan ML20204G7701999-02-28028 February 1999 Submits Comment on NRC Approval of Georgia Inst of Technology Decommissioning Plan for Their Neely Nuclear Research Reactor on Campus of Georgia Tech Pursuant to 10CFR20.1405 & 10CFR50.82(b)(5) ML20210P1381999-02-0808 February 1999 Forwards Response to NRC Request for Addl Info,Dtd 981228. Rev 0 to Quality Assurance Program Plan for Site Characterization of Georgia Tech Neely Nuclear Research Ctr Encl ML20202A8031999-01-25025 January 1999 Forwards Notice of Solicitation of Comments,Per 10CFR20.1405 & 10CFR50.82 (b)(5) for Proposed Action Concerning Decommissioning ML20202A8401999-01-25025 January 1999 Forwards Notice & Solicitation of Comments,Per 10CFR20.1405 & 10CFR50.82(b)(5) for Proposed Action Concerning Decommissioning ML20202A8691999-01-25025 January 1999 Forwards Notice of Solicitation of Comments,Per 10CFR20.1405 & 10CFR50.82(b)(5) for Proposed Action Concerning Decommissioning ML20198K8781998-12-28028 December 1998 Forwards Request for Addl Info Re Decommissioning Plan & License Termination Request for Facility License R-97 for Georgia Tech Research Reactor Submitted on 980701 ML20206P2481998-12-21021 December 1998 Expresses Appreciation for Opportunity to Comment Re Considered Issuance of Emergency Planning Exemption at Facility ML20197J3771998-12-10010 December 1998 Forwards Copy of Environ Assessment & Fonsi for Exemption from Emergency Plan Requirement of 10CFR50.54(q) for Georgia Inst of Technology Research Reactor.Exemption Granted ML20197J2801998-12-0404 December 1998 Responds to to NRC Commissioners Re Concerns That 980924 Response to Was Not from Commissioners. Weiss Response to Subj Ltr Reflects Positions & Policies Established by Commission ML20196H0821998-12-0303 December 1998 Forwards Environmental Assessment & Finding of No Significant Impact Re Licensee Application for Exemption from Emergency Planning Requirements of 10CFR50.54(q).Notice Indicates That NRC Considering Issuance of Exemption ML20155G9681998-11-0404 November 1998 Forwards Amend 13 to License R-97 & Safety Evaluation.Amend Removes Requirements for Security Plan to Protect Special Nuclear Matl Because License Does Not Allow Possession of SNM ML20154J8561998-10-0808 October 1998 Responds to Requesting Termination of Requalification Program for RO & Sro.Nrc Finds Request to Eliminate Operator Requalification Program Requirements Acceptable ML20154E3821998-10-0101 October 1998 Forwards bi-monthly Status Rept for Georgia Tech Research Reactor Decommissioning Program for Months of Aug & Sept 1998 ML20197J3061998-10-0101 October 1998 Submits Complain That Addressed to NRC Commissioners Was Answered by Someone Else in Different Section ML20154D7881998-10-0101 October 1998 Forwards Three Entries in Safeguards Event Log Made During Months of Jul,Aug & Sept 1998,per 10CFR73.71(a) Through (C) ML20153H2381998-09-24024 September 1998 Responds to on Concerns Related to Georgia Institute of Technology & Other Matters.Georgia Institute of Technology Submitted Decommissioning Plan by Ltr & Plan Currently Under Review by NRC Staff ML20153H2671998-08-27027 August 1998 Expresses Concern Re Georgia Institute of Technology Neely Nuclear Research Reactor,Contaminated Campus Area, Contaminated Reactor Bldg,Heavy Water & 200,000 Curies of Cobalt-60 Stored in Adjacent Bldg & in Pool ML20237E2461998-08-20020 August 1998 Requests NRC Approval of Exemption to Maintain Nnrc Emergency Preparedness Plan.Georgia Tech Was Defueled in Feb 1996 & All Nuclear Fuel Was Removed ML20237B6731998-08-10010 August 1998 Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of Jul 1998 ML20236U4891998-07-21021 July 1998 Informs of Termination of Tritium Monitoring Activities Due to Requirement Specified in TS Tables 2.1 & 3.1 ML20236U4061998-07-15015 July 1998 Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of June 1998 ML20236J2561998-07-0101 July 1998 Informs That No Entries Were Made in Safeguards Event Log During Months of Apr,May & June 1998,per 10CFR73.71(a) Through (C) ML20236Q0671998-07-0101 July 1998 Requests Decommissioning Order for Ga Tech Research Reactor. Documentation Supporting Request,Listed.Reactor Is Currently in Safe Shutdown Condition & in Full Compliance W/Possession Only License.Page N-579 of Incoming Submittal Not Include ML20236Q0731998-06-30030 June 1998 Issues Statement of Intent in Compliance w/10CFR50.75(e)(IV) Re State of Ga Support of Cost Estimate for Decommissioning of Ga Technology Research Reactor ML20236H5771998-06-18018 June 1998 Forwards Synopsis of NRC OI Completed Rept Re Alleged Discrimination by Georgia Institute of Technology Against Employee Who Filed Complaint W/Dol.Determined There Was Insufficient Evidence to Substantiate Allegation ML20154D6621998-06-0101 June 1998 Requests Termination of Requalification Program for Ros/Sros for License R-97.All Licenses for Ros/Sros Should Also Be Terminated.Fuel Has Been Removed from Facility & Licenses No Longer Needed ML20248J6711998-05-21021 May 1998 Forwards Monthly Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Apr 1998 ML20247K3591998-05-0707 May 1998 Forwards Insp Rept 50-160/98-201 on 980420-21.No Violations Noted.Various Aspects of Safety & Emergency Preparedness Programs Including Selective Exams of Procedures & Representative Records Were Inspected ML20217G2681998-04-20020 April 1998 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Mar 1998 ML20217K6181998-04-0202 April 1998 Forwards Amend 12 to License R-97 & Se.Amend Removes Authority from License to Operate,Authorizes possession-only & Changes TS to Remove Operational Requirements of Reactor ML20202F4471998-02-0404 February 1998 Forwards Addl Info in Support of possession-only-license Amend Application Dtd 970807.Revised TS Re Rev to Facilitate Decommissioning,Encl ML20198H2661998-01-0202 January 1998 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Months of Nov & Dec 1997 ML20197J9891997-12-12012 December 1997 Responds to to Atlanta Ofc of EPA Re Georgia Tech Research Reactor.Nrc Evaluations Will Continue to Ensure Acceptable Application of Regulations to Protect Public Health & Safety,Including Decommissioning Activities ML20197G7441997-12-12012 December 1997 Forwards RAI Re Submittals for Possession Only License for Georgia Tech Research Reactor.Response Requested within 60 Days of Date of Ltr ML20197H3701997-12-12012 December 1997 Forwards Request for Addl Info Re Submittals for Possession Only License for Georgia Tech Research Reactor ML20199K8571997-11-24024 November 1997 Forwards Insp Rept 50-160/97-201 on 971027-31.No Violations Noted.Various Aspects of Operations,Safety & Security Programs Inspected Including Selective Exams of Procedures & Representative Records & Interviews W/Personnel ML20199G9971997-11-17017 November 1997 Forwards Ga Tech Research Reactor 1997 Emergency Preparedness Exercise Scenario.Exercise Scheduled for 971211 ML20202D1131997-11-13013 November 1997 Forwards Status Rept for Georgia Tech Research Reactor Deommissioning Program for Month of Oct 1997 ML20198T4371997-11-0606 November 1997 Submits Addl Info in Support of possession-only-license Amend & in Response to 970916 RAI 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D2841999-10-0404 October 1999 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program Covering Sept 1999 ML20211Q6361999-09-0303 September 1999 Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program Covering Jul & Aug 1999 ML20195C3531999-05-28028 May 1999 Forwards Environ Rept for Decommissioning of Ga Tech Research Reactor,Per NRC Regulation 51.53(d).Environ Rept Submitted in Apr 1994,encl ML20206R3061999-04-13013 April 1999 Submits Georgians Against Nuclear Energy Comments Re Intent of Georgia Tech to Decommission Neely Research Reactor at Georgia Inst of Technology,Atlanta,Ga ML20204G7701999-02-28028 February 1999 Submits Comment on NRC Approval of Georgia Inst of Technology Decommissioning Plan for Their Neely Nuclear Research Reactor on Campus of Georgia Tech Pursuant to 10CFR20.1405 & 10CFR50.82(b)(5) ML20210P1381999-02-0808 February 1999 Forwards Response to NRC Request for Addl Info,Dtd 981228. Rev 0 to Quality Assurance Program Plan for Site Characterization of Georgia Tech Neely Nuclear Research Ctr Encl ML20206P2481998-12-21021 December 1998 Expresses Appreciation for Opportunity to Comment Re Considered Issuance of Emergency Planning Exemption at Facility ML20197J3061998-10-0101 October 1998 Submits Complain That Addressed to NRC Commissioners Was Answered by Someone Else in Different Section ML20154E3821998-10-0101 October 1998 Forwards bi-monthly Status Rept for Georgia Tech Research Reactor Decommissioning Program for Months of Aug & Sept 1998 ML20154D7881998-10-0101 October 1998 Forwards Three Entries in Safeguards Event Log Made During Months of Jul,Aug & Sept 1998,per 10CFR73.71(a) Through (C) ML20153H2671998-08-27027 August 1998 Expresses Concern Re Georgia Institute of Technology Neely Nuclear Research Reactor,Contaminated Campus Area, Contaminated Reactor Bldg,Heavy Water & 200,000 Curies of Cobalt-60 Stored in Adjacent Bldg & in Pool ML20237E2461998-08-20020 August 1998 Requests NRC Approval of Exemption to Maintain Nnrc Emergency Preparedness Plan.Georgia Tech Was Defueled in Feb 1996 & All Nuclear Fuel Was Removed ML20237B6731998-08-10010 August 1998 Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of Jul 1998 ML20236U4891998-07-21021 July 1998 Informs of Termination of Tritium Monitoring Activities Due to Requirement Specified in TS Tables 2.1 & 3.1 ML20236U4061998-07-15015 July 1998 Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of June 1998 ML20236J2561998-07-0101 July 1998 Informs That No Entries Were Made in Safeguards Event Log During Months of Apr,May & June 1998,per 10CFR73.71(a) Through (C) ML20236Q0671998-07-0101 July 1998 Requests Decommissioning Order for Ga Tech Research Reactor. Documentation Supporting Request,Listed.Reactor Is Currently in Safe Shutdown Condition & in Full Compliance W/Possession Only License.Page N-579 of Incoming Submittal Not Include ML20236Q0731998-06-30030 June 1998 Issues Statement of Intent in Compliance w/10CFR50.75(e)(IV) Re State of Ga Support of Cost Estimate for Decommissioning of Ga Technology Research Reactor ML20154D6621998-06-0101 June 1998 Requests Termination of Requalification Program for Ros/Sros for License R-97.All Licenses for Ros/Sros Should Also Be Terminated.Fuel Has Been Removed from Facility & Licenses No Longer Needed ML20248J6711998-05-21021 May 1998 Forwards Monthly Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Apr 1998 ML20217G2681998-04-20020 April 1998 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Mar 1998 ML20202F4471998-02-0404 February 1998 Forwards Addl Info in Support of possession-only-license Amend Application Dtd 970807.Revised TS Re Rev to Facilitate Decommissioning,Encl ML20198H2661998-01-0202 January 1998 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Months of Nov & Dec 1997 ML20199G9971997-11-17017 November 1997 Forwards Ga Tech Research Reactor 1997 Emergency Preparedness Exercise Scenario.Exercise Scheduled for 971211 ML20202D1131997-11-13013 November 1997 Forwards Status Rept for Georgia Tech Research Reactor Deommissioning Program for Month of Oct 1997 ML20198T4371997-11-0606 November 1997 Submits Addl Info in Support of possession-only-license Amend & in Response to 970916 RAI ML20198M7941997-10-14014 October 1997 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Sept 1997 ML20211A7061997-09-12012 September 1997 Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month Aug 1997 ML20217J6211997-07-28028 July 1997 Provides Concerns Re 2.206 Director'S Decision & Ga Institute of Technology Neely Nuclear Research Reactor. Ltr for Docket as Well as 2.206 Docket Part & Svc List,Encl ML20217J8521997-07-28028 July 1997 Submits Info Re 2.206 Petition Under 10CFR20 Against Ga Institute of Technology Nuclear Research Reactor Located on Campus of Ga Tech in Middle of Downtown Atlanta ML20149K9341997-07-17017 July 1997 Forwards Entry in Safeguards Event Log Made During Month of April,May & June 1997,per 10CFR73.71(a)(c) ML20210L8901997-07-0707 July 1997 Forwards Rev 47 of Emergency Phone List.W/O Encl ML20141G2271997-06-30030 June 1997 Notifies NRC That on 970630,RA Karam Will Retire & Relinquish Directorship of Neely Nuclear Research Ctr,Ga Tech Research Reactor.N Hertel Will Be Appointed Director, Effective 970701 ML20137N9171997-04-0101 April 1997 Informs That No Entry in Safeguards Event Log Made During Jan,Feb & March 1997 ML20137B3031997-03-14014 March 1997 Submits Response to NRC Insp Rept 50-160/96-05.Corrective Actions:Licensees Promised to Develop Such Work Sheet & Put Into Practice on or Before 971201 ML20134L3061997-02-13013 February 1997 Responds to Notice of Exercise Weakness in Insp Rept 50-160/96-05.Corrective Actions:Will Conduct Emergency Drills & Will Conduct Addl Table Top Exercises ML20133F6441997-01-0808 January 1997 Informs That Pursuant to 10CFR73.71(a)(c),no Entry in Safeguards Event Log Made During Oct-Dec 1996 ML20134N0771996-11-18018 November 1996 Forwards Corrected Data Re Tritium Concentrations in Liquid Effluents for 1990-1995 ML20138G4271996-10-0808 October 1996 Informs That on 961126,licensee Planning to Hold Annual Emergency Drill.Attached Outline Gives Appropriate Details About Scenario ML20117J7791996-09-0202 September 1996 Requests Operator Licenses of Jn Copeland & Rv Demeglio Be Revoked ML20116B2561996-07-19019 July 1996 Informs NRC That Reactor Operators Kl Norton & Gm Comfort Have Left Ga Tech,Per 10CFR50.74.RO Licenses to Operate Gtrr Should Be Revoked ML20116A9671996-07-18018 July 1996 Responds to Violations Noted in Insp Rept 50-160/96-02. Corrective Actions:Conducted Meeting W/Radiation Safety Staff Re Regulatory Requirements & Replaced Retired Health Physicist Technician w/well-trained Health Physicist ML20137D4691996-06-27027 June 1996 Informs That B Statham Appointed Reactor Supervisor for Ga Tech Research Reactor,Effective Immediately ML20117K7521996-05-27027 May 1996 Requests NRC Assurance That Listed Documents Re 2.206 Petition Entered by Court Recorder Into Record.W/Certificate of Svc ML20117G2301996-05-13013 May 1996 Discusses Activities That Occurred at Neely Nuclear Research Ctr During Winter of 1995 & Lists Unsatisfactory Conditions Witnessed Re Facility Operations.Related Correspondence ML20108E6461996-05-0808 May 1996 Notifies Honorable Judges Bechhoefer,Kline & Lam of ASLB, That P Blockey-O'Brien Will Present Testimony of Min of 30 Minutes on 960522,including But Not Limited to Listed Info. W/Certificate of Svc.Served on 960510 ML20101D6271996-03-14014 March 1996 Discusses 10CFR2.206 Petition & New Info on Earthquake Risk, Possible Unsafe Conditions Developed Due to Site If Ga Tech Neely Reactor & Problems ML20097E6181996-02-0707 February 1996 Submits Notice of Shipment of Nuclear Matl from Atlanta,Ga to DOE in Aiken,Sc ML20097D8181996-01-27027 January 1996 Discusses 10CFR2.206 Petition Against Georgia Tech Reactor on Campus in Atlanta,Possible License Problems & Contamination Problems.W/Certificate of Svc.Served on 960205 ML20096D0151996-01-10010 January 1996 Discusses P Blockey-O'Brien 10CFR2.206 Petition & Ltrs Written to NRC & ASLB Judges Re Petition & Georgia Tech Neely Nuclear Research Reactor,Radioactive Contamination, Violations & ALARA Issue 1999-09-03
[Table view] |
Text
- - -. -
e .
. J . . . . ,'
f i Georgia Institute of Technology NEELY NUCLEAH RESEARCH CENTER k . . . , ,_ ,[ ~ 900 ATLANTIC DRIVE
',,#"'"'"3. 8 ATLANTA, GEORGIA 30332-0425 USA ( 04)8944 600 h ..
October 24, 1995 Mr. Edward J. McAlpine, Chief Fuel Facilities Branch Division of Nuclear Materials Safety U.S. Nuclear Regulatory Commission, Region II 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30323-0199 Dear Mr. McAlpine This is to let you know that on November 2, 1995, we plan to hold our annual emergency drill. The attached outline gives appropriate details about the scenario.
Should you have any questions, please let me know (894-3620).
Sincerely, k A-- -
R. A. Karam, Ph.D.
Director RAK/dmcg Attachment-1 080039
[p 9512080182 951024 /
PDR ADOCK 05000160 F PDR s\
Teler:542507 GTRIOCAATL Fax. 404 853-9325 (Venfy 404-894 3600)
A Unit of the University System of Georgia An Equal Education and Employment Opportunity Instituti 4 'El 3
,- . . - . . . . - _ . . .. .. . . . - - _ -- .. . - - - . - - . ~ . - . - - .
i j '
i 4 EMERGENCY EXERCISE Nov. 2,1995 Objectives: 1. To test the NNRC Emergency Organization's response to an " ALERT" emergency event; i 2. To demonstrate that an alternate Emergency Director can handle an emergency situation; i
- 3. To demonstrate that NNRC personnel are trained properly and can respond
! appropnately to emeryncy situations; 4
- 4. To demonstrate that p 4 s are Wasa and can be followed,
- 5. To demonstrate that caergency commumcanons are appropnate.
j i NOTE: This exercise is limited to the initial phase of emergency respaner i
Remediaten of the emergency is completed with aTable Top drill.
5
! SET-UP Abe Doe (Reactor Operator) is in Reactor Control Room. John Doc and Pete Doc are on Reactor Main Floor in the process of transfemag fuel.
t 8:30 am OPS / Cont. hands card one to Abe Doe.
CARD ONE: Youareintheprocessof i. ' dsgfuel. Twooperanonspeopleare domsthe l
i transfers on the main floor. SurWnly, amitipic ares radantson alarms sound from witlun the nantamment j facility. Four area monitors are pegged (i.e, >100 mr/h).
! 9:=-'d Action:
- l. Abe Doc uses the PA to annou:xz that an emergency has taken place and that by y Jm@d nest evacuate the facility.
- 2. Alternauvely, Abe Doe may call management and managen eat will announce the emergencyon the PA.
- 3. Abe Doe or management calls GaTech poboc to annannee emergency.
' 4. Abe Doe checim with operations people to assess incident before evanntmg .
8:32 OPS / Cont. hands card two to Abe Doe (either as he commumcates to operatiens people or as he exits contmnment 8:35 Staff evacuales to check-in point and is -..yd PM Action
- 1. All personnel report and are individually .-..,4
- 2. Either in response to ED query or by volunteenng the information, Abe commumcates the following information imm card two to the ED.
CARD TWO: We have had an accident in the containment bmidmg while transferring fuel . A fuel element has dropped out of the transfer cask. I have isolated the bmiding ; four area monitors are pegged! John Doe is hurt and needs medical attention. Pete and I have pulled John into the airlock. Pete Doe is with him.
. .,7. _ 7. _ _ _ _ __ . _ _ _ _ _ _ _ _ . _ . . . _ _ . . _
. 1
~
F7ad Action:
- 1. Police in conjunction with HP-1 respond to injury. Adnun. First Aid.
Arenmpanied by OPS / Controller.
- 2. Have police call for immanhete ambulance service from Gmdy.
- 3. ED selects response team of OPS + HP 2 and Pmceeds to C -' Center.
Ar-npamed by MNGMT/ Controller.
8:40 Command CeaserMadeOperational ;
j E=e*M action <
- 1. OPS + HP-2 open emergency cabinet, recover radios and survey equipment.
- 2. OPS + HP-2 at ED's direcuan proceeds to the air lock, with instructions to survey area and report back
- 3. Pamammicatsans emanhhcharl with OPS + HP team at air lock 8:45 OPS + HP-2 reports (Based upon satable aneecament time in airlock area OPS / Controller gives card three to OPS + HP-2 team).
CARD THREE. John Doe has <==pr= art fractme ofleg. John is innde of main air lock.
Paheeman and HP-1 are tendmg to John. The fbel elarnent is visible from tne air lock window and appears to be severely damaged, i.e. the non-fuel assembly header is dented. The *Iement is located between plug storage area and truck door and we anticipate exposures of 120 R/hr at 1 meter from the asser sly. The expomme within the interlock is 10 mr/h . John says the_ fuel element assembly struck him duringthe acculent.
E-eead Arrian
- 1. ED shapatches HP's to assess rarhatian levels at accident site and away fmm accident - especially at cantammans wall on the outade 2, ED instructs all emergency team members not to enter mntninment building.
- 3. Instruct police to keep open ambulance path to bad of balding
- 4. CallGradyE gf requestambulanceifnotalreadydone. AlertGradyof imminent receiptof patientwith posebleradiologicalcontamination.
9:00 OPS /Contmiler provules card four to HP-1 aAer reasonable assessment intenal.
CARD FOUR: John Doe is contaminated on leg and shows low level cross cxmtarnination from first aid activities over other parts of his body. He appears woozy and weakf.
Expected Action
- 1. ED, pohce on staff may innhente " Possible shock. Keep head lower than feet" "If cold, cover John with blanket".
2, A...' 4== arrives
- 3. Instruct Pohoc/HP-1 to tell EMT, known broken leg, possible shock and patient enntammatari Recornmend HP accompany patient to hospital.
- 4. EMT respond
4 m
9:05 Aurament Cinamfication O -;'r-4 l
i l
Expected Action
- 1. Declare Eirer ,wi- ALERT )
- a. Applyall Proc.6030
- b. Apply Proc. 6100, Section 5.10.5 " Severe Fuel Damage" i 2. Initiate Notifications
- a. GDNR/GEMA/A-FEMA
- b. NRC
- c. GaTech Med.Relanons 9:15 - 9:25 . HP building / site survey :---;'^ i OPS /HP-2 report in to ED.
MNGMT/ Controller gives OPS /HP -2 card five:
CARD FIVE: Site survey DATA sheet. No contamination anywhere outside the contamment building. Radiation level in the main airlock is 10 mR/h. 'Ihere is no contamsnatma on the floor of the air lock. Radiation level outside the enntamment truck door is 20 mR/h. Radiation levels everywhere else
'are normal, ie . . background.
EWad Acuon
- 1. Clear all pra r :from truck door area
- 2. Ambulanceleaves
- 3. Call for M=;- --- - ^ Meettng to initiate planning for recovery from the emergency.
9:30 MNGMT/ Controller hands card six to ED CARD SIX: The immediate emergency exercise is over. You are to proceed with recovery )
actiors as a Table Top Drill.
Note: Both controllers will assume roles as managers at this point and be available to answer questions.
I Expected Action
- 1. ED can request technical assistance as neadad
- 2. Plan a step by step pine for entering the containment building to
- a. Determine whether or not fission prodo s have been released inside l the bmidmg. !
- b. Devise a method for retrieving the exposed fuel element and placing it in a cask to be transferred the storage pool.
- 3. Plan should minimne exposure to personnel.
10:00 Emergency Ends Expected Action
- 1. PA announcement. OK to enter building.
- 2. Hold meeting to critique performance