Provides Addl Info in Support of 911220 Application for Amend to License DPR-34,proposing Changes to TSs Re Adminstrative Controls,Per Discussions W/Nrc
ML20095B090
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/14/1992
From: Crawford A
PUBLIC SERVICE CO. OF COLORADO
To: Weiss S
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20095B093 List:
References
P-92159, NUDOCS 9204210336
Download: ML20095B090 (9)


Text

-

~

h Public Service-2;iA 16805 WCR 19 1/2, Plattoville, Colorado 80651 April 14, 1992 Fort St. Vrain Unit No. 1 P-92159 l

U.

S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.

C.

2055S ATTN: Dr. Seymour H. Weiss, Director Non-Power Reactor, Dacommissioning and l

Environmental Project Directorate Docket No.60-267

SUBJECT:

Additional Information Regarding Proposed Amendment to Facility Operating License and Administrative Controls Technical Specifications i

REFERENCE:

PSC

Letter, Crawford to
Weiss, dated i

December 20, 1991 (P-91435)

Dear Dr. Weiss:

This letter provides additional information in support of the December 20, 1991, proposed amendment to the Fort St.

Vrain (FSV)

Facility Operating License and Technical Specifications, submitted via the referenced letter.

This submittal is based on discussions between Public Service Company of Colorado (PSC) and the NRC Project Manager, Mr.

Peter Erickson.

l The information provided in the attachments withdraws the proposed changes to plant staffing and qualificccion requirements in Administrative Controls (AC) 7.1.1.4 and L

7.1.1.5.a.

These specifications have been restored tc the requirements in the existing FSV Technical Specifications, so that staf f qualifications will remain in accordance with ANSI N18.1 as long as the existing Technical Specifications are in.effect.

For completeness, the attachments include the ' entire amendment proposal provided in the referenced letter, and no changes other than the changes to AC 7.1.1.4 and 7.1.1.5.a have been made.

j

.dd 9204210336 920414

'"l PDR ADOCK 05000267

/

i 1

P PDR

00

-- ~ ~,,, --,,

,..n

,.,e,

,.,.n

_..n.,..

___.____m s

P-92159 Page 2 April 14, 1992 As in the previous submittal, the attached maendment proposal includes the following organizational changes and program reductions:

Revise management titles to reflect the current organization.

Delete programs that will not be necessary after all nuclear fuel has been removed irom the FSV Protected Area (e.g., Fire Brigade, licensed operators, and the physical security plan).

Delete requirements for mechnical Advisors.

Delete the requirement for the Monthly operating Report.

Add controls for High Radiation Areas.

The submittal of these proposed changes is included in the following attachments:

Summary of Proposed Changes Proposed Changes No Significant Hazards Consideration Analysis PSC requests NRC approval oC the attached proposed Technical Specification amendment as soon as reasonably

possible, to support a

smooth transition to the administrative controls that will be in effect during the decommissioning of Fort St. Vrain.

If you have any questions concerning thia submittal, please contact Mr. M.

H. Holmes at (303) 620-1701.

Very truly yours, W

g A.

Clegg Crawford Vice President Electric Production ACC/SWC/Ing

. ~.

_>__1._

.. _ _ _ _ _. _ -..._._ ___.. _ _ _=.___ _ _.._._ -.-

i i

P-92159 Pagn 3 April 14, 1992 cc:

Regional Administrator, Region IV Mr. J.

B.

Baird Senior Resident Inspector Fort St. Vrain Mr. Robert M. Quillin, Director Radiologjcal Control Division Colorado Departmunt of Health 9

..F i

i i

1 l

I I

i f

1 9

I i

_ _ _ = _ _ _ _ _. _. _. _ _ _ _ _

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter

)

)

Public Service Company of Colorado

)

Docket No. 50-267 Fort St. Vrain Unit No. 1

)

AFFIDAV!T l

A. Clegg Crawford, being first duly sworn, deposes and says: That i

he is Vice President, Electric Production, of Public Service Company of Colorado, the Licensee herein, that he has read the foregoing Application for Am;ndment to the Facility Operating License and Appendix A of the Facility Operating License, and knows the contents

-1 thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

W*

& rl r

A. Clegg rawford Vice President Electric Production STATE OF COLORADO

)

)

COUNTY OF.

DENVER

)

Subscribe and sworn to before me, a Notary Public on this 14_th dr.y of April

, 1992.

l 0L. 3]Aez bruA e Notary Public I

My commission expires January 6,

, 19 93

.--n---......-_.-.--.-__.-....._.,

4 BEFORE THE UNITED STATES NUCLEAR REGULATORY CCHMISSION In the Matter of the Facility Operating License)

)

of

)

)

PUBLIC SERVICE COMPANY OF C0 LORN 00

)

Application for Amendment to Appendix A of Facility Operating License License No, OPR-34 OF THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION I

t This application for Amendment to the Facility l

Operating License and Apper. dix A of the Facility l

Operating License, License No. OPR-34, is t

submitted for NRC review and approval, Respectfully but A,1(ted, l

PUBLIC SERVICE COMPANY OF COLORADO l.

By A. Clegg Crawford Vice President Electric Froduction L

KELLY, STAN; FIELD 4 C#DONNELL James K. Tarpey Mark A Davidson Public Service Company Building Denver, Colorado 30202 Attorneys for Applicant l

4

.-l ga dd s&

-,d.d5#4M+h-.C44 s A re 18 wh--24 4 J4 3-M m J.4 -b.Ah 4-e.n thnhdhh h4 4AE-W JL 5^

44Am J4 - M 64 s6.h.4,4*mdiL.wwmhga_ h 6 mheda+4. M %wn h

I 4

t t

i T

ATTACHMENT 1 I

1 TO P-92159

SUMMARY

OF PROPOSED CHANGES e

r h

t t

i i

i I

l r

i I

r i

1l-g.,

y v,~

m

..m,

. - ~,,..- -.,.... _

,v.

1 W yya 1 EuJnmarv of Pronoggd Chang _.E e

changes Sneciti_ggiqu Revised to allow the physical security plan, and training and qualification, License guardsafeguards contingency plans to be terminated Condition 3 after all nuclear fuel has been removed from the Protected Area.

Section 7, Replaced

" Manager, Nuclear Production and Manager" with "Defueling and Station Station Decommissioning Program Director and All Manager".

Nuclear Operations" Replaced "Vice President, with "Vice President responsible for nuclear Section 7, All activities".

Revised requirements for shift crew After all nuclear fuel has been 7.1.1.2.b.1 composition.

removed from the FSV Protected Area, these p7.1-3 are dele.ted.

Shift crew requirements fuel has requirements remain unchanged until been removed from the FSV Protected Area.

Revised the requirement that a licer. sed room during 7.1.1.2.b.3 operator be present in the contro)

After p7.1-3 shutdown and refueling conditions.

all nuclear fuel has been remosed from the al2 requirement is deleted; this I

Protected Area is unchanged until that time.

the requirement

Also, deleted reference to the Technical Advisor.

Revised the requirement that an operator or technician qualified in radiation proteccion 7.1.1.2.b.6 be on sive whenever fuel is on p7.1-4 proceduresThe applicabi).ity of this requirr. ment site.

was clarified to ensure that an opera *,or or technician qualified in : disti:n potection procedures is on site whenever nuclear fuel is within the Protected Area and during physical activities involving radioactively contaminated systema or equipment.

Revised to state that a Fire Brigade is not required after all nuclear fuel has been 7.1.1.2.b.7 p7.1-4 removed fron the Prctected Area.

~~---%

. -... - ~

.. -.. ~

i l

Pa p 2 1

Summary _of Proposed Chances (pontinued) j Specification Chances 7.1.1.2.b.10 Deleted reference to the Superintendent of p7.1-6 Operations.

Also, added statement that RO and SRO licensing requirements do not apply after all nuclear fuel has been removed from the Proteo'.ed Area.

7.1.1.2.b.12 Deleted reference to the Technical Advisor.

p7.1-7

Also, added statement that control room command requirements do not apply after all nuclear fuel has been removed from the Protected Area.

Table 7.1-1 Added note that licensed operators and a p7.1-8 minimum shift creu composition are not required after all nuclear fuel has been temoved from the Protected Area.

Also, dqleted reference to Technical Advisors.

7.1.1.3 Deleted requirements for Technical Advisors.

p7.1-8a,8b i

7.1.1.5.a,b Replaced " Nuclear Training and Support j

p7.1-8c Manager" with " Facility Support Manager".

l 7.1.1.5.5 Added condition that the training program for p7.1-8c the staff and the Fire Brigade is only required until all nuclear fuel has been removed from the Protected Area.

7.1.1.5.c Deleted Technical Advisor training p7.1-8c requircaents, i-7.1.2.1 Revised Plant Operations Review Committee l

p7.1-9 membership titles to reflect FSV reorganization.

7.1.2.5 3 Revised Radiological Emergency Response Plan p7.1-11 to Defueling Emergency Response Plan.

7.1.3.2 Revised Nuclear' Facility Safety Committee

-p7.1-13 membership.

titles to reflect FSV reorganization.

7.4.a Revised the requirement to have written p7.4-1 procedures for

" Refueling operations" to "Defueling activities".

i i

1 1

Page 3 Summary of.fronosed Changps (Continugd).

Angelfication

.Chim9.cn 7.5.1.c Deleted Monthly. operating Report requirements, p7.5-3,4 7.5.1.e Revised requirements for the Semi-annual p7.5-7 Radioactivo Effluent Release Report to cover pla r.t activities during the previous six months, versus during the previous six months "of operation".

7.8 Added new controls for High Radiation Areas.

p7.8-1,2 l

l i

I l.

i l'

b

+

l l-i