Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095D001 + (13:46:03, 13 December 2024)
- ML20095C995 + (13:46:05, 13 December 2024)
- ML20095C997 + (13:46:05, 13 December 2024)
- ML20095C993 + (13:46:06, 13 December 2024)
- ML20095C990 + (13:46:07, 13 December 2024)
- GO2-95-265, Application for Amend to License NPF-21,revising TS to Be Consistent w/NUREG-1434, STS GE Plants,Bwr 6, Including Improved TS Submittal,Consisting of Application of Selection Criteria,Ts,Comparison Document & NSHC + (13:46:08, 13 December 2024)
- ML20095C983 + (13:46:08, 13 December 2024)
- W3P84-2152, Forwards Update Re Toxic Chemical Survey of Industries Surrounding Plant.Protective Features Will Provide Adequate Protection for Control Room Operators.Probability of Immediately Dangerous Levels Being Reached Unlikely + (13:46:09, 13 December 2024)
- U-602516, Revises Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs. Core Shroud Insps Will Be Performed During Refueling Outage 7 Scheduled for Mar 1998 + (13:46:10, 13 December 2024)
- ML20095C954 + (13:46:11, 13 December 2024)
- ML20095C950 + (13:46:12, 13 December 2024)
- ML20095C948 + (13:46:13, 13 December 2024)
- BSEP-95-0619, Responds to Requests for Info within 180 Days for GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (13:46:14, 13 December 2024)
- ML20095C926 + (13:46:14, 13 December 2024)
- ML20095C917 + (13:46:15, 13 December 2024)
- ML20095C892 + (13:46:16, 13 December 2024)
- L-84-199, Responds to NRC Re Violations Noted in IE Insp Rept 50-251/84-21.Corrective Actions:Temporary Sys Alteration Documentation Required by Administrative Procedure 103.3 Completed & Personnel Counseled + (13:46:20, 13 December 2024)
- 05000302/LER-1995-014-01, Forwards LER 95-014-01.Suppl Provides Recision of 10CFR50.72 on H non-emergency Rept Associated W/Condition,Conversion of LER to Voluntary Ler,As Well as Rev of Cause & Corrective Actions + (13:46:23, 13 December 2024)
- ML20095C823 + (13:46:26, 13 December 2024)
- ML20095C820 + (13:46:27, 13 December 2024)
- ST-HL-AE-5214, Forwards Info That Describes Actions Taken to Enhance Program & Provides Addl Details to Clarify Program for Managing Rosemount Loss of Fill Oil Issue in Response to Insp Repts 50-498/95-17 & 50-499/95-17 + (13:46:28, 13 December 2024)
- ML20095C784 + (13:46:29, 13 December 2024)
- ML20095C773 + (13:46:30, 13 December 2024)
- LIC-95-0231, Forwards non-proprietary & Proprietary Versions of Revised Epips,Including EPIP Index & Rev 30 to EPIP-OSC-2, Command & Control Position Actions/Notifications. Proprietary Version Withheld + (13:46:31, 13 December 2024)
- ML20095C758 + (13:46:31, 13 December 2024)
- ML20095C750 + (13:46:32, 13 December 2024)
- ML20095C747 + (13:46:33, 13 December 2024)
- ML20095C742 + (13:46:33, 13 December 2024)
- LIC-95-0226, Submits Exemption Request from 10CFR50,App E,Requirements for Completing Biennial Full Participation Excercise + (13:46:34, 13 December 2024)
- 3F1295-11, Forwards Revised Response to GL 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment + (13:46:36, 13 December 2024)
- ML20095C725 + (13:46:36, 13 December 2024)
- ML20095C701 + (13:46:37, 13 December 2024)
- ML20095C699 + (13:46:38, 13 December 2024)
- ML20095C693 + (13:46:42, 13 December 2024)
- ML20095C690 + (13:46:44, 13 December 2024)
- ML20095C683 + (13:46:45, 13 December 2024)
- ML20095C688 + (13:46:45, 13 December 2024)
- 05000278/LER-1995-005-03, :on 951108,three of Eleven MSRVs Did Not Lift within TS +1% Tolerance Due to Small Drift in Setpoint of Valves.Refurbished Valves Have Been Properly Setup at Test Facility & Install for All MSRVs & SVs + (13:46:47, 13 December 2024)
- ML20095C676 + (13:46:51, 13 December 2024)
- ULNRC-03300, Monthly Operating Rept for Nov 1995 for Callaway Plant + (13:46:52, 13 December 2024)
- ML20095C651 + (13:46:53, 13 December 2024)
- ML20095C626 + (13:46:54, 13 December 2024)
- ML20095C634 + (13:46:54, 13 December 2024)
- ML20095C596 + (13:46:56, 13 December 2024)
- ML20095C605 + (13:46:56, 13 December 2024)
- ML20095C581 + (13:46:57, 13 December 2024)
- AECM-86-0118, Comment on Proposed Rules 10CFR2,19,20,30,31,32,34,35,39,40, 50,61 & 70 Re Stds for Protection Against Radiation + (13:46:59, 13 December 2024)
- ML20095C536 + (13:47:00, 13 December 2024)
- GO2-95-261, Provides Info on Recent Changes at Plant Re Security Force Personnel Now Performing Hourly Fire Patrols for Impairments of Fire Protection Features + (13:47:01, 13 December 2024)
- 05000455/LER-1995-002-03, :on 950331,TS LCO Action Requirement Not Entered Prior to Valve Work.Caused by Personnel Error.Shift Supervisor Counselled & Work Request Approval Page Revised + (13:47:03, 13 December 2024)
- ML20095C469 + (13:47:04, 13 December 2024)
- 05000348/LER-1995-011, :on 951114,unplanned Manual Actuation of ESF Occurred Due to Personnel Error.Coached Personnel Re Simulation of Activities Associated W/Emergency Drills.W/ + (13:47:05, 13 December 2024)