ML20095C784
| ML20095C784 | |
| Person / Time | |
|---|---|
| Site: | 05200001 |
| Issue date: | 04/20/1992 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | Pierson R NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19354F280 | List: |
| References | |
| MFN-094-92, MFN-94-92, SLK-9256, NUDOCS 9204240162 | |
| Download: ML20095C784 (1) | |
Text
_
~
GE & clear Ener;;y April 20,1992 MFN No. 094-92 Docket No. STN $2-001 SLK 9256 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Robert C, Pierson, Director Standardization and Non Power Reactor Project Directorate
Subject:
GE Responses to the Resolution of Selected issues Related to AllWR DSER Chapter 19 (SECY 91309)
Reference:
Submittal of Amendment 4 to GE's AllWR FSAR, MFN NO. 05-89, dated January 31,1989 Submittal of Amendment 8 to GE's AllWR SSAR, MFN NO. 052-89, dated July 28,1989 Enclosed are thirty-four (34) copies of the GE response to SECY 91309 Confirmatory item 17 I
and to Outstanding item 18 (partial).
Please note that this material contains information that is designed as General Electric Company proprietary information. This material relates to the Chapter proprietary information that was previously sent to the NRC via the above referenced letter and their corresponding proprietary affidavits.
It is intended that GE will amend the SSAR in these responses in a future amendment.
Sincerely, Y
{l
\\j\\/\\k P.W. Marriott, Manager Regulatbry and Analysis Services M/C 444, (408) 925-6948 cc:
- 1. Catton (ACRS)
F. A. Ross (DOE) p p,7 N. D. Fletcher (DOE)
J. A. Kudrick (NRC) g, fgg [y(/R l0 R. L. Palla, Jr.
(NRC)
C. Poslusny, Jr.
(NRC)
R.C Berglund (GE)
(jJ9
~
J. F. Quirk (GE)
(
[ q 24003G 9204240162 920420 PDR ADOCK 05200001 A
PDR p.
_ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _