Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096C683 + (13:05:03, 13 December 2024)
- ML20096C689 + (13:05:03, 13 December 2024)
- ML20096C682 + (13:05:04, 13 December 2024)
- ML20096C679 + (13:05:05, 13 December 2024)
- ML20096C681 + (13:05:05, 13 December 2024)
- ML20096C674 + (13:05:09, 13 December 2024)
- 05000265/LER-1992-012, :on 920409,expansion Anchors for Unit 2 RHR Did Not Meet FSAR Design Allowables.Caused by Nuclear Plant Being in Condition That Was Outside Design Basis of Plant.Mod MO4-2-92-009 Issued + (13:05:11, 13 December 2024)
- 05000265/LER-1992-013-01, :on 920407,determined That Second Level Undervoltage Setpoint Was non-conservative.Caused by Inadequate Design Control.Mods Designed & Installed + (13:05:13, 13 December 2024)
- 05000254/LER-1992-010-03, :on 920407,loss of 125 Volt Dc Turbine Bldg Bus 1A & 1A-2 Occurred.Caused by Personnel Error.Plexiglass Covers Placed Over Disconnects Until Work Completed + (13:05:15, 13 December 2024)
- ML20096C663 + (13:05:16, 13 December 2024)
- 05000423/LER-1992-012, :on 920407,inadvertent Feedwater Isolation Signal Generated Due to Reactor Trip Breaker Testing.Caused by Procedural Inadequacy.Procedure Changed to Require Performing Steps in Sequence + (13:05:18, 13 December 2024)
- 05000265/LER-1992-010-02, :on 920328,discovered Low Temp on RPV Bottom Head During Hydrostatic Test.Caused by Personnel Error. Test Suspended & Vessel Depressurized to Be within Acceptable TS temp-pressure Range + (13:05:20, 13 December 2024)
- ML20096C658 + (13:05:21, 13 December 2024)
- 05000281/LER-1992-005-03, :on 920410,one Train of Intake Canal Level Sensing Channel 1 Discovered Out of Trip Position After Isolation Screenwell.Cause Not Determined.No Corrective Actions Necessary + (13:05:23, 13 December 2024)
- ML20096C652 + (13:05:24, 13 December 2024)
- 05000333/LER-1992-019, :on 920407,required Hourly Fire Watch Patrol Not Posted within 1 H When Defects Found in Fire Barrier Penetration Seals in Rcic.Caused by Personnel Error.Written Info Re Fire Watch Patrol Provided + (13:05:26, 13 December 2024)
- ML20096C647 + (13:05:27, 13 December 2024)
- ML20096C640 + (13:05:28, 13 December 2024)
- ML20096C646 + (13:05:28, 13 December 2024)
- ST-HL-AE-4091, Monthly Operating Repts for Apr 1992 for South Texas Project Units 1 & 2 + (13:05:29, 13 December 2024)
- ML20096C625 + (13:05:30, 13 December 2024)
- ML20096C635 + (13:05:30, 13 December 2024)
- RBG-18-722, Interim Deficiency Rept DR-167 Re HPCS Diesel Generator Control Panel.Interim or Final Status Rept Will Be Provided by 841016 + (13:05:31, 13 December 2024)
- ULNRC-03310, Informs NRC of Implementation of Amend 104 to License NPF-30,approving Relocation of TS Table 3.3-2 & 3.3-5 to Chapter 16 of FSAR + (13:05:32, 13 December 2024)
- ML20096C616 + (13:05:32, 13 December 2024)
- ML20096C609 + (13:05:33, 13 December 2024)
- ML20096C606 + (13:05:34, 13 December 2024)
- ML20096C604 + (13:05:34, 13 December 2024)
- ST-HL-AE-4097, Responds to Violations Noted in Insp Repts 50-498/92-06 & 50-499/92-06 on 920224-28.Corrective Actions:Purchase Orders Issued to Obtain Both Kalsi & Westinghouse MOV Actuator Uprating Program Test Results + (13:05:35, 13 December 2024)
- ML20096C592 + (13:05:39, 13 December 2024)
- ML20096C590 + (13:05:40, 13 December 2024)
- ML20096C589 + (13:05:41, 13 December 2024)
- ML20096C582 + (13:05:41, 13 December 2024)
- ML20096C576 + (13:05:42, 13 December 2024)
- ML20096C565 + (13:05:43, 13 December 2024)
- ML20096C568 + (13:05:43, 13 December 2024)
- ML20096C563 + (13:05:44, 13 December 2024)
- ML20096C553 + (13:05:45, 13 December 2024)
- ML20096C562 + (13:05:45, 13 December 2024)
- ML20096C547 + (13:05:46, 13 December 2024)
- 05000370/LER-1995-004-04, :on 951216,manually Initiated Actuation of Both Unit 2 Motor Driven Auxiliary Feedwater Pumps. Caused by Loss of Auxiliary Steam to Main Feedwater Pump Turbine. Procedures Revised + (13:05:48, 13 December 2024)
- DCL-84-297, Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21) + (13:05:49, 13 December 2024)
- ML20096C540 + (13:05:49, 13 December 2024)
- ML20096C535 + (13:05:50, 13 December 2024)
- GO2-84-476, Responds to NRC Re Observations Noted in Insp Rept 50-397/84-15.Corrective Actions:Nonessential Activity in Control Room Limited,Personnel Counseled Re Adherence to Procedures & log-keeping Procedure Revised + (13:05:51, 13 December 2024)
- ML20096C534 + (13:05:51, 13 December 2024)
- ML20096C532 + (13:05:52, 13 December 2024)
- ML20096C521 + (13:05:53, 13 December 2024)
- ML20096C528 + (13:05:53, 13 December 2024)
- ML20096C515 + (13:05:54, 13 December 2024)
- 05000456/LER-1995-012-02, :on 951005,method of Makeup to VCT Could Not Be Supported Through Existing Documentation.Caused by Mgt Deficiency.Addl Makeups to VCT Via Boric Acid Storage Tank Provided + (13:05:56, 13 December 2024)
- ML20096C471 + (13:05:57, 13 December 2024)