Forwards Application to Amend License NPF-3,revising Tech Specs to Reflect Changes in Reactor Vessel Matls Irradiation Surveillance Schedule & Flow Verification of Auxiliary Feedwater Sys
ML20096C640
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/27/1984
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20096C643 List:
References
1074, TAC-55652, TAC-55782, NUDOCS 8409050368
Download: ML20096C640 (2)


Text

l l

Mb ;. TOLEDO

%s EDISON RcMano P. Caouse v.c. %sant Docket No. 50-346  %.,9w, License No. NPF-3 Serial No. 1074 August 27, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copics of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed changes include:

1. Section 4.4.9.1.2, Table 4.4-5 and Bases
2. Section 4.7.1.2 The two attachments identify the proposed changes and its safety evaluation and significant hazard consideration. Item 1 concerns revision to the Reactor Vessel Materials Irradiation Surveillance Schedule to reflect the change in operating cycle length. The change is from 12 to 18 month refueling, cycle with anticipated reduction in accumulated neutron fluence of the reactor vessel material. Also, the revised schedule will reduce unnecessary handling of dummy capsules which will reduce personnel exposure. Item 2 concerns the flow verification of the Auxiliary l Feedwater System after an extended outage (>30 days in Mode 5), refueling outages (every 18 months) or modification to the system that could affect the system. It also requires verification of locked valve position and when testing is being performed which requires valve realignment, a dedicated individual will be stationed at the valves with communication to l

the control room who will restore the system to the required line up if l necessary.

60 8409050368 840827 I(p I y g y8ut PDR ADOCK 05000346 ,

I i P PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652

,,-.c y

, -This amendment request involves two requests. Enclosed is a check for

$300 as requested by 10CFR170.12.

.Very truly yours, Attachment ec: DB-1 NRC Resident Inspector State of Ohio e