Text
_ _ _ _ _ _ _ _ _ _
}>
~
Pacific Gas and Dectric Ccmpany n M e Sw
,M 5 5 -
csn.aas wm +y g f g;. ' r 3 (: y 4th?? 4%
ti J
April 21, 1992 PG&E Letter No. DCL-92-098 U.S. Nuclear Regulatory Coninission ATTN: Document Control Desk k'ashington, D.C.
20555 Re:
Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-OPR-82 Diablo Canyon Units ) and 2 Emergency Plan Implementing Precedures Update Gentlemen:
In accordance with Section V, " Implementing Procedures," of 10 CFR 50 Appendix E, PG&E is submitting one copy of the update to the Detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan (Enclosure 2). Two copies of the update are being submitted to the NRC, Region V office, and one copy is being submitted to the NRC Resident inspector.
Additionally, PGLE hereby infonts yus of a rescinded Implementing Procedure, Emergency Procedure H-8, " Containment Emergency Personnel Hatch," Revision 0.
Please discard this rescinded procedure.
This update contains some privacy / proprietary information that is bracketed in accordance with NRC Generic letter 81-27 and is identified in Enclosure 1.
Sincerely,
/7 77 N' ,.,W/-
jCr / John H. Gisdon cc:
Ann P. Hodgdon (w/ enc cover only)
John B. Martin (2)
Harry Road (w/ enc cover only)
Philip Morrill Enclosures 57365/85K/ERK/1345 m [ y[
-n b li v - 2d f
V7 9205140232 920421 m
PDR ADOCK 05000275
/ '
F P DR..
j s
3
. = -. - -..
PG&E Letter No. OCL-92-098 l
ENCLOSURE 1 LOCATION OF PRIVACY / PROPRIETARY INFORMATION Diablo_ Canyon Emergency Plan Implementing Procedure:
19hnt_2B EP EF-9
" Activation of Back-Up Emergency Response Facilities," Revision 2, L
March 30, 1992.
',1
'Back-Up Control _ Room Instructions,"
March 02, 1992, page 1 of 1.
W 3
5736S/85K
I 1
4 PG&E Letter No. DC.-92-098 i
ENCLOSURE 2
~ UPDATE TO THE DETAILED IMPLEMENTING PROCEDURES FOR THE DIABLO CANYON POWER PLANT UNITS 1 AND 2 EMERGENCY PLAN Volume 3A
-Updated Table of Contents ED R-7 "Off-Site Transportation Accidents," Revision 8, March 30,1992.
l EP M-3
" Ammonia Release," Revision 10, March 30, 1992.
Volume 3B Updated Table of_ Contents EP EF-9
' Activation of Back-Up Emergency Response facilities," Revision 2, March 30, 1992.
a 5736S/85K
- i
.PG&E Letter No. DCt-92-098 CURRENT EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS Volume 3A TITLE R1y R-1 Personnel Injury or Illness (Radiologically Related) 20 and/or Overexposure R-2 Release of Airborne Radioactive Materials 8
R-3 Release of Radioactive liquids 7
5 R-4 High Radiation (In-Plant) 16 R-6 Radiological _ Fire R-7 Off-Site Transportation Accidents 8
M-1 Nonradiological Employee Injury or Illness 18 M-3 Ammonia Release 10 13 M-4 Earthquake H-5 Tsunami Warning 8
M-6 Nonradiological Fire 18 M-7, Oil Spill Contingency Plan 8
M-8 Containment Emergency Personnel Hatch 0
H-9 Hazardous Waste Management Contingency Plan 7
M-10 Fire Protection of Safe Shutdown Equipment, Unit 1 8
M-10 Fire Protection of Safo Shutdown Equipment, Unit 2 S
G-1 Accident ~ Classification and Emergency Plan Activation.
13 G-2 Establishment of the On-Site Emergency Organization 12
-G-3 Notification of Off-Site Agencies and Emergency Organization Perscnnel 20 G-4 Personnel Accountability and Assembly 12 G-5 Evacuation of Nonessential Site Personnel 5
- Rescinded on March 23, 1992.
l-5736S/85K