Forwards Public Version of Revised Epips,Including Rev 2 to EP EF-9,Rev 8 to EP R-7,Rev 10 to EP M-3 & Updated Table of contents.W/920504 Release Memo
ML20096C689
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/21/1992
From: Gisclon J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20096C693 List:
References
NUDOCS 9205140232
Download: ML20096C689 (5)


Text

_ _ _ _ _ _ _ _ _ _

}>

~

Pacific Gas and Dectric Ccmpany n M e Sw

,M 5 5 -

csn.aas wm +y g f g;. ' r 3 (: y 4th?? 4%

ti J

April 21, 1992 PG&E Letter No. DCL-92-098 U.S. Nuclear Regulatory Coninission ATTN: Document Control Desk k'ashington, D.C.

20555 Re:

Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-OPR-82 Diablo Canyon Units ) and 2 Emergency Plan Implementing Precedures Update Gentlemen:

In accordance with Section V, " Implementing Procedures," of 10 CFR 50 Appendix E, PG&E is submitting one copy of the update to the Detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan (Enclosure 2). Two copies of the update are being submitted to the NRC, Region V office, and one copy is being submitted to the NRC Resident inspector.

Additionally, PGLE hereby infonts yus of a rescinded Implementing Procedure, Emergency Procedure H-8, " Containment Emergency Personnel Hatch," Revision 0.

Please discard this rescinded procedure.

This update contains some privacy / proprietary information that is bracketed in accordance with NRC Generic letter 81-27 and is identified in Enclosure 1.

Sincerely,

/7 77 N' ,.,W/-

jCr / John H. Gisdon cc:

Ann P. Hodgdon (w/ enc cover only)

John B. Martin (2)

Harry Road (w/ enc cover only)

Philip Morrill Enclosures 57365/85K/ERK/1345 m [ y[

-n b li v - 2d f

V7 9205140232 920421 m

PDR ADOCK 05000275

/ '

F P DR..

j s

3

. = -. - -..

PG&E Letter No. OCL-92-098 l

ENCLOSURE 1 LOCATION OF PRIVACY / PROPRIETARY INFORMATION Diablo_ Canyon Emergency Plan Implementing Procedure:

19hnt_2B EP EF-9

" Activation of Back-Up Emergency Response Facilities," Revision 2, L

March 30, 1992.

',1

'Back-Up Control _ Room Instructions,"

March 02, 1992, page 1 of 1.

W 3

5736S/85K

I 1

4 PG&E Letter No. DC.-92-098 i

ENCLOSURE 2

~ UPDATE TO THE DETAILED IMPLEMENTING PROCEDURES FOR THE DIABLO CANYON POWER PLANT UNITS 1 AND 2 EMERGENCY PLAN Volume 3A

-Updated Table of Contents ED R-7 "Off-Site Transportation Accidents," Revision 8, March 30,1992.

l EP M-3

" Ammonia Release," Revision 10, March 30, 1992.

Volume 3B Updated Table of_ Contents EP EF-9

' Activation of Back-Up Emergency Response facilities," Revision 2, March 30, 1992.

a 5736S/85K

  • i

.PG&E Letter No. DCt-92-098 CURRENT EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS Volume 3A TITLE R1y R-1 Personnel Injury or Illness (Radiologically Related) 20 and/or Overexposure R-2 Release of Airborne Radioactive Materials 8

R-3 Release of Radioactive liquids 7

5 R-4 High Radiation (In-Plant) 16 R-6 Radiological _ Fire R-7 Off-Site Transportation Accidents 8

M-1 Nonradiological Employee Injury or Illness 18 M-3 Ammonia Release 10 13 M-4 Earthquake H-5 Tsunami Warning 8

M-6 Nonradiological Fire 18 M-7, Oil Spill Contingency Plan 8

M-8 Containment Emergency Personnel Hatch 0

H-9 Hazardous Waste Management Contingency Plan 7

M-10 Fire Protection of Safe Shutdown Equipment, Unit 1 8

M-10 Fire Protection of Safo Shutdown Equipment, Unit 2 S

G-1 Accident ~ Classification and Emergency Plan Activation.

13 G-2 Establishment of the On-Site Emergency Organization 12

-G-3 Notification of Off-Site Agencies and Emergency Organization Perscnnel 20 G-4 Personnel Accountability and Assembly 12 G-5 Evacuation of Nonessential Site Personnel 5

  • Rescinded on March 23, 1992.