- 1CAN019602, Monthly Operating Rept for Dec 1995 for ANO-1 + (12:52:27, 13 December 2024)
- ML20096F627 + (12:52:28, 13 December 2024)
- ML20096F619 + (12:52:28, 13 December 2024)
- ML20096F607 + (12:52:29, 13 December 2024)
- 05000423/LER-1992-013-01, :on 920411,determined That Temporary Sampling for Turbine Bldg Stack Monitor Improperly Connected.Caused by Inlet & Discharge Sample Lines Inadvertently Crossed. Sample Pump Procedures to Be Revised + (12:52:31, 13 December 2024)
- ML20096F591 + (12:52:32, 13 December 2024)
- ML20096F592 + (12:52:32, 13 December 2024)
- 05000275/LER-1984-023, :on 840730,diesel Generators 1-1,1-2 & 1-3 Started Automatically in Response to Loss of Startup Bus Voltage.Caused by Personnel Isolating Plant from 230 Kv Offsite Startup Power.Personnel Counseled + (12:52:34, 13 December 2024)
- ML20096F586 + (12:52:35, 13 December 2024)
- ML20096F582 + (12:52:36, 13 December 2024)
- ML20096F576 + (12:52:36, 13 December 2024)
- ML20096F575 + (12:52:37, 13 December 2024)
- ML20096F571 + (12:52:38, 13 December 2024)
- ML20096F568 + (12:52:39, 13 December 2024)
- ML20096F559 + (12:52:41, 13 December 2024)
- ML20096F547 + (12:52:41, 13 December 2024)
- ML20096F539 + (12:52:47, 13 December 2024)
- AECM-84-0409, Special Rept 84-030/0:on 840705,fire-rated Penetration CE-259D Opened to Implement Design Change Package.Fire Watch Established Until Penetration Restored on 840724 + (12:52:50, 13 December 2024)
- ML20096F535 + (12:52:50, 13 December 2024)
- 05000334/LER-1984-006, :on 840618,during Review of 18-month Surveillance Testing Methods for 120-volt Station Batteries, Test Methods Determined Inadequate.Nrc Tentative Approval Given to Permit Delaying Test Requirements + (12:52:52, 13 December 2024)
- AECM-84-0423, Special Rept 84-031/0:on 840612,floor & Equipment Drain Demineralizers Passed Resins & Declared Inoperable.Caused by Damaged Septums.New Septums on Order + (12:52:53, 13 December 2024)
- ML20096F511 + (12:52:54, 13 December 2024)
- ML20096F501 + (12:52:55, 13 December 2024)
- BSEP-84-1781, Special Rept 2-SR-84-12:on 840708,crack Discovered in Inner North Wall of Computer Room at 49-ft Elevation of Control Bldg.Cause Under Investigation.Fire Barrier Limiting Condition Initiated & Wall Repaired & Returned to Svc + (12:52:56, 13 December 2024)
- ML20096F494 + (12:52:57, 13 December 2024)
- ML20096F490 + (12:52:58, 13 December 2024)
- ML20096F486 + (12:52:59, 13 December 2024)
- ML20096F489 + (12:52:59, 13 December 2024)
- ML20096F485 + (12:53:02, 13 December 2024)
- ML20096F483 + (12:53:02, 13 December 2024)
- ML20096F481 + (12:53:03, 13 December 2024)
- 05000395/LER-1984-035, :on 840815,spurious High Radiation Alarms Experienced by Reactor Bldg High Range Atmospheric Purge Monitor RM-A14.Degraded Components Replaced & Monitor Tested Satisfactorily + (12:53:05, 13 December 2024)
- ML20096F479 + (12:53:07, 13 December 2024)
- ML20096F476 + (12:53:10, 13 December 2024)
- ML20096F474 + (12:53:11, 13 December 2024)
- BSEP-84-1862, Ro:On 840806,determined Tech Spec Required Surveillance Procedure Re Radioactive Gaseous Effluent Monitors Inadequate.Ler Will Be Submitted by 841005 + (12:53:12, 13 December 2024)
- ML20096F473 + (12:53:12, 13 December 2024)
- ML20096F471 + (12:53:13, 13 December 2024)
- ML20096F470 + (12:53:15, 13 December 2024)
- RBG-18766, Interim Deficiency Rept DR-157 Re ASME Stock Fittings.Next Rept Will Be Submitted by 840926 + (12:53:15, 13 December 2024)
- ML20096F466 + (12:53:16, 13 December 2024)
- 05000362/LER-1984-030-01, :on 840727,containment Purge Isolation Sys Train a Actuated by Spurious Instrument Fail Signal from Containment Area Radiation Monitor 3RT-7856.Cause Unknown. Engineering Evaluation Underway + (12:53:18, 13 December 2024)
- RBG-18765, Interim Deficiency Rept DR-151 Re Partial Penetration Welds for Square Groove,Butt Welded & HVAC Ductwork.Next Rept Will Be Submitted by 841004 + (12:53:19, 13 December 2024)
- ML20096F462 + (12:53:19, 13 December 2024)
- ML20096F461 + (12:53:20, 13 December 2024)
- ML20096F459 + (12:53:21, 13 December 2024)
- ML20096F457 + (12:53:24, 13 December 2024)
- ML20096F453 + (12:53:26, 13 December 2024)
- ML20096F455 + (12:53:26, 13 December 2024)
- ML20096F452 + (12:53:27, 13 December 2024)
- ML20096F450 + (12:53:29, 13 December 2024)