ML20096F501

From kanterella
Jump to navigation Jump to search
Forwards Rev 7 to Emergency Plan Implementing Procedure 1004.33, Post-Accident Sample Analysis,Per NRC Re post-accident Sampling Sys Compliance W/NUREG-0737, Item II.B.3
ML20096F501
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/31/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20096F505 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM 5211-84-2224, NUDOCS 8409100081
Download: ML20096F501 (1)


Text

'{93

';i.- :

GFU Nuclear Corporation Nuclear

omear8o s

Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386

)

Writer's Direct Dial Number:

August 31, 1984 5211-84-2224 Office of Nuclear Reactor Regualation j

Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (THI-1)

Operating License No. DPR-50 Docket No. 50-289 Post Accident Sampling (NUREG 0737, Item II.B.3)

This is in response to your letter of March 22, 1984, which included the Safety Evaluation by NRR of the TMI-1 Post Accident Sampling System compliance

)

with NUREG 0737, Item II.B.3.

Enclosed is THINS Unit 1 Emergency Plan Implementing Procedure 1004.33, Rev. 7, which includes the methodology for estimating the extent of core damage following an accident taking into consideration other physical parameters in addition to fission product activities.

Sincerely, g'g/.fh H.D.Hikill Director, THI-l HDH:MRK:vjf Enclosure cc:

J. Van Vliet, NRC Project Manager R. Conte, NRC Resident Inspector Dr. T. E. Murley, NRC Region.I, Regional Administrator kU)O O

q Y';

s\\

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

_