!. y 7.r-TENNESSEE VALLEY AUTHORITY-CHATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II b AUCI6 -P2: / 3-August 13, 1984 BLRD-50-438/83-34 ^
BLRD-50-439/83-30 U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James.P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - FAILURE TO SPECIFY IEEE CLASS ON
~
PROCUREMENT SPECIFICATIONS - BLRD-50-438/83-34, BLRD-50-439/83 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector Linda Watson on May 9,1983 in accordance with 10 CFR 50.55(e) as NCR BLN EEB 8307. Related NCR BLN BLP 8324 was then reported and is being handled jointly with NCR BLN EEB 8307. This was followed by our interim reports dated June 9 and November 4,1983 Enclosed is our third interim report.
We expect to submit our next report by August 21, 1985.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY 6 4. d.c 6
h L. M. Mills, Manager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center (Enclosure)
Institute of Nucicar Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8409100040 840013 PDR ADOCK 0500043G S
PDR OFFICIACC@@
An Equat Opportunity Employer y
g M
L e:
ENCLOSURE i
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FAILURE TO SPECIFY IEEE CLASS ON PROCUREMENT SPECIFICATIONS I
BLRD-50-438/83-34, BLRD-50-439/83-30 10 CFR 50.55(e) i NCRs BLN EEB 8307 AND BLN BLP 8324
{
THIRD INTERIM REPORT Describtion of Deficiency Limit switches, control valves,-and solenoid valves for safety-related-systems which are required to be class 1E components, were procured from Crane Company (Chempump Division), Yarway Corporation, Copes-Vulcan Corporation, and Masonellan Valve Corporation without specifying the proper IEEE class. Because of this inadvertent error, documentation necessary to verify the class of these components was not provided.
Interim Progress With the exception of 12 devices, all other devices identified in the two subject nonconformances will be either replaced with qualified components or have been determined by the manufacturer or supplier to be acceptable for the IEEE 1E application. TVA is still in the process of determining,-
the acceptability of the remaining 12 devices.
/