u Carolina Power & Light Company
-MB 8< AJG 27 Pl:qq P. O. Box 101,'New Hill, NC 27562
' August 21, 1984 Mr. James P.-O'Reilly NRC-258 United States Nuclear Regulatory Conunission Region II 101 Marietta Street, Northwest (Suite 2900)
Atlanta, GA 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 3
1986 - 900,000 KW - UNIT 1 PIPE FRAME - MATERIAL OMISSION, ITEM 182
Dear Mr. O'Reilly:
On July 27, 1984, Mr. N. J. Chiangi notified the NRC (Mr. A. Hardin) of a potentially reportable item per the provisions of 10CFR50.55(e). The NRC was informed that contrary to the requirements of AISC Section 5, washers were not placed on both sides of plied ~ connections for pipe frame C-1-364 when oversized or short slotted holes existed.
An investigation is currently underway to-identify other connections which may be suspect. Once our investigation is complete, an engineering evaluation will be performed to determine acceptability.
It is projected that a report on the reportability of this item will be issued by October 23, 1984.
Thank you for your consideration in this matter.
'Yours very truly, W
L; M
. M. Parsons Project General Manager Shearon Harris Nuclear. Power Plant RMP/ jam cc: Messrs. G. Maxwell /R. Prevatte (NRC - SHNPP)