Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100G917 + (10:49:55, 13 December 2024)
- ML20100G907 + (10:49:56, 13 December 2024)
- ML20100G887 + (10:49:59, 13 December 2024)
- ML20100G888 + (10:49:59, 13 December 2024)
- ML20100G880 + (10:50:01, 13 December 2024)
- ML20100G885 + (10:50:01, 13 December 2024)
- 05000277/LER-1996-001-01, :on 960118,licensed Thermal Power Slightly Exceeded Due to Unaccounted for CRD Water Flow.Caused by Failure to Consider Impact of Addl Flow on Core Thermal Power.Mod Design Process Will Be Enhanced.W/Undated Ltr + (10:50:03, 13 December 2024)
- ST-HL-AE-5291, Forwards Semiannual FFD Program Performance Rept for STP Units 1 & 2,covering Period Jul-Dec 1995,per 10CFR26.71(d) + (10:50:04, 13 December 2024)
- BECO-LTR-96-011, Provides FFD Program Performance Data for Pilgrim Nuclear Power Station,For Period Jul-Dec 1995 + (10:50:05, 13 December 2024)
- ML20100G861 + (10:50:06, 13 December 2024)
- ML20100G864 + (10:50:06, 13 December 2024)
- BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 + (10:50:07, 13 December 2024)
- 05000331/LER-1985-006, :on 850303,while Resetting Isolations & Alarms Resulting from Instrument Panel a Being Deenergized,Standby Diesel Generator a Which Had Not Been Locked Began to auto-start.Generator Secured + (10:50:09, 13 December 2024)
- ML20100G853 + (10:50:11, 13 December 2024)
- 05000369/LER-1985-009-01, :on 850219,estmated 1 Cubic Ft of Contaminated Spent Resin Released from Vent.Resin Discovered on 850220 on Roof of Auxiliary Bldg & Other Bldgs.Caused by Personnel Error + (10:50:13, 13 December 2024)
- ML20100G836 + (10:50:17, 13 December 2024)
- ML20100G835 + (10:50:18, 13 December 2024)
- ML20100G833 + (10:50:19, 13 December 2024)
- L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information + (10:50:20, 13 December 2024)
- ML20100G831 + (10:50:21, 13 December 2024)
- ML20100G826 + (10:50:23, 13 December 2024)
- ML20100G819 + (10:50:23, 13 December 2024)
- ML20100G815 + (10:50:25, 13 December 2024)
- ML20100G800 + (10:50:27, 13 December 2024)
- NRC-96-0008, Forwards Response to Questions on Proposed EDG TS Change + (10:50:28, 13 December 2024)
- B11503, Application for Amend to License DPR-65,revising Tech Specs Re Chlorine Setpoints,Control Room Emergency Ventilation Sys Flow Rate,Insertion of Control Room Monitoring & Elimination of Date Associated W/Reg Guide 1.95.Fee Paid + (10:50:29, 13 December 2024)
- ML20100G770 + (10:50:30, 13 December 2024)
- RBG-20-500, Forwards Proposed Changes to NRC Second Draft of Tech Specs. Brief Description of Proposed Change,Justification for Change & marked-up Pages from Second Draft Also Encl + (10:50:30, 13 December 2024)
- ML20100G764 + (10:50:31, 13 December 2024)
- ML20100G759 + (10:50:32, 13 December 2024)
- ML20100G740 + (10:50:33, 13 December 2024)
- 0CAN029603, Forwards ANO FFD Program Performance Data for Period of Jul-Dec 1995,per 10CFR26.71(d) + (10:50:34, 13 December 2024)
- ML20100G730 + (10:50:35, 13 December 2024)
- ML20100G725 + (10:50:38, 13 December 2024)
- RC-96-0040, Forwards VC Summer Nuclear Station FFD Rept for Period of Jul-Dec 1995.Rept Includes Required Tests Results,Data Analyses & Summary of Mgt Actions Taken as Result of Testing + (10:50:38, 13 December 2024)
- ML20100G722 + (10:50:39, 13 December 2024)
- ML20100G721 + (10:50:40, 13 December 2024)
- ML20100G720 + (10:50:41, 13 December 2024)
- ML20100G719 + (10:50:42, 13 December 2024)
- ML20100G718 + (10:50:43, 13 December 2024)
- ML20100G716 + (10:50:44, 13 December 2024)
- ML20100G714 + (10:50:45, 13 December 2024)
- ML20100G709 + (10:50:46, 13 December 2024)
- ML20100G710 + (10:50:46, 13 December 2024)
- ML20100G708 + (10:50:47, 13 December 2024)
- B11493, Application for Amend to License DPR-65,revising Tech Specs to Clarify That Containment Gaseous & Particulate Radiation Monitors Not Required to Be Operable During Type a Integrated Leak Rate Testing.Fee Paid + (10:50:48, 13 December 2024)
- ML20100G704 + (10:50:48, 13 December 2024)
- ML20100G699 + (10:50:49, 13 December 2024)
- ML20100G696 + (10:50:50, 13 December 2024)
- ML20100G695 + (10:50:51, 13 December 2024)
- ML20100G692 + (10:50:52, 13 December 2024)
- LIC-96-0027, Forwards Response to Weakness from NRC Insp Rept 50-285/95-15.Corrective Actions:Training Will Be Developed to Ensure That All Command & Control Positions Understand Actions to Be Taken During Emergency Escalation + (10:50:53, 13 December 2024)