Text
.
[$7f[
oracoq#c, '
.-[,r.
UNITED STATES NUCLEAR REGULATORY COMMISSION
[ %.- i' j wassincros. o. c.20sss
..y
\\[,
]
February 18, 1983 MEMORANDUM TO:
Norman Haller/
Roxanne Goldsmith Jim Milhoan Steve Chestnut John Austin FROM:
T. A. Rehm, OEDO BRIEFING BOOK - HEARING ISSUES
SUBJECT:
Attached are two sets of Q&A's which you may find relevant to Udall hearing issues:
Region III responses to points raised in the GAP letter of 1.
January 31, 1983, which addressed Zimmer issues.
Responses from Region III and NRR in regard to issues raised 2.
in the letter from Congressman Udall of February 14, 1983.
.They related to Shoreham arid Zimmer.
An. issue regarding pipe hangers at Zimmer which Henry Myers.
3.
has~been involved with (not attached
.will fax later today onreceipt).
S'
,/,r-c:.
g T. A. Rehm) 0ED0 ' '
Enclosures As above CC: OCA fjj2p 7s 840523 BELAIR84-250 PDR
/D*
..,..,, _. =., -.... -. -
_.._.,.,...~.,.m
hat is being done to i.ssure public confidence in the results OUESTIO!!
<.of reviews and assessments required by the Comission's November 12, 1982 Order regarding the W. H. Zimmer Plant?
AUSWER The HRC is going to considerable length to assure that the public is kept well informed.
Public meetings are frequently held.
' Documents placed in the Public Document Room.
DISCUSSION:
A Plan of Action has been prepared and is being followed by the HRC staff for reviewing Cincinnati Gas and Electric Company's (CG&E) implementation of the Comission Order.
Copies of this Plan of Action were made available to interested members of the public.
In this Plan, emphasis has been given to providing meaningful opp,ortunity for public comment prior to the NRC staff taking action on the' various requirements of the Order.
This includes soliciting written comments from interested members of the public on submitted proposals from the licensee, holding meetings with the licensee in full view i
of the public, and responding to questions from the public at the conclusion of these. meetings.
For example, in evaluating CG&E's recommendation to have Bechtel conduct the management review of the Zimmer Project, Region III provided copies of CG&E's submittals and other background documents to interested parties for their comments. Based on the-staff's review of the comments received, Mr. James G. Keppler, Region III Administrator, held.a:
public meeting.in Cincinnati on January 5,1983 to obtain clarifying infor-mation on some of the comments and to provide. opportunity for other members of the public who did not submit written comments to express their views.
The 11RC staff will also require protocols governing communications between and among CG&E and the independent parties which may be involved in the Zimmer project.
Ur. der these protocols all recommendations, findings, evaluations and ex-changes of correspondence, including drafts, between the independent parties and CGLE shall be submitted to the Administrator #f NRC Region III at the same time they are submitted to CG&E.
All other communications and transmittals of information between CG&E and the independent parties shall be maintained in a location accessible for URC examination.
By these steps, the HRC staff will be able to monitor the independent reviews.
2 The protocols will also require tha't any discussions of substantive matters cr among CGLE and the independent parties or any discussion regard-bet. wee:
ir.g an interim report, findings, or conclusions of the independent parties Transcripts to CG&E 5e conducted in meetings open to public observation.
or written minutes of such meetings will also be kept.
The NRC staff also intends to conduct most me'etings it has with CG&E or the independent parties in public; however, there may be countervailing reasons which make it appropriate to conduct certain meetings just with CG&E and/or the independent parties.
All documents to or from the NRC staff regarding the independent reviews
. on Zimmer will be placed in the NRC Public Document Rooms in Batavia, Ohio and Washington, D.C..
The staff believes that its Plan of Action and the protocol will assure that the public's input is considered in decisions to be made under the Order and that the public has opportunities to follow the independt't It is our hope that these steps will cause the public to have reviews.
confidence in the independent reviews to be conducted on the Zimmer project.
m O
e 90 0
g
In this regard I would like a description of actions taken by NE staff to determine'the scope and findings of audits,
~
OUESTION assessments, and/or reviews undertaken by consultants retained I
since April-1982 by the Cincinnati Gas and Electric Company for the purpose of assessing the status of the Zimmer project and recommending actions to resolve outstanding questions.
ANSUER Consultants were retained by CG&E to:
ExamineCG&Emanagementstructure(completed)
Develop a design terification program (completed)
~
Resolve ASME code problems (continuing)
Bechtel has been retained to perform the management assessment required by Commission Order, if the Commission approves.
DISCUSS 10t{
In approximately July of 19'82 CG&E retained the servies of O'Donnell and O'Donnell in turn hired (1) Reedy, Herbert, Associates, Incorporated.
Gibbons,andAssociates,(2)ScientificManagement, Incorporated,and (3) Stiefel Associates, Incorporated.
Stiefel As$ociates, Incorporated was hired to examine the CG&
ASME code-problems identified by the National Board of Boiler Pressure Vessel structure.
Scientific Management, Incorporated was hired to help develop t
a design verification program, and O'Donnell and Associates, Incorporated Inspectors.
O'Donr. ell's contract term-also worked on the design verification program. Scientific Management, Incorporated, a insted on November 5, 1982.
Stiefel Associates, Incorporated were also terminated on November 5, 1982.
Reedy, Herbert, Gibbons, and Associates was retained to continue helping i
on ASME code problems.
While the staff discussed the role of these consultants with CG&E manage-ment, no NRC inspections were conducted of the work performed by the con-According to CGLE no written reports have been issued by the l
sultants.
a
. consultants.
27, 1982 between CG&E management and A meeting was held on September Region III to discuss organizational changes proposed by CG&E as a result, Comments con-at least in part, of recommendations from the consultants.
cerning the proposed organizational changes were given to CGLE by NRC repretrntatives.
~.
l
2 Regicr. III receives and reviews reports subnitted by CG2.E every tveo weeks tc.: e 5:ste of Chic, Departr:ert cf Industrial Relations, Division of Boiler Inspections, in response to ASME code concerns raised by the National These reports receive input Board of Boiler and Pressure Vessel Inspectors.Our inspectors have also from Reedy, Herbert, Gibbons, and Associates.
att' ended licensee and National Board meetings at which members of Reedy, Herbert, Gibbons, and Associates were in attendance.
fn November 1982, CG&E obtained the services of Bechtel Power Corporation.
As of February 16, 1983, the HRC review of Bechtel has been limited to evaluating the acceptability of Bechtel to perform the management assessment required by the Commission's Order of November 12, 1982.
0 S
e i
es l
l e
f
~
i What has happened at.Zimmer since the Commission's QUESTION November 12, 1982 Order a'nd what witL be done to determine whether the plant can eventually be operated.
ANSWER b
. Following Order all safety related construction halted
. Status since Order
- Quality Confirmation Program has continued
- Documentation Verification Program has continued
- National Board team.has cont'inued audits
. NRC. Action since Order
- limmer Plan of Action Developed
- Review of CGBE's Proposal to have Bechtel conduct Independent Management Audit
- NRC Evaluation Team has conducted baseline evaluation of plant (focus on hardware) --- Bolting problem only new important issue identified
. Future Actions to Determine Plant Quality (ALL subfect to NRC approval)
I
- Independent Management Review
- Verification of Plant Quality, including reassessment of QCP.
i
- Complete Construction, including rework
e Other Significant Points
- NRC Evaluation team will assess ongoing activities
- IDVP and ICVP of one or more systems will be conducted at conclusion of Order w
e e
4 e
o m
h e
e l
e e
e e
es g
0 e
e o
e I
please ie.dicate five exanples of systen interactions of a kind that 7.'E ST *.0M.
the staff and/or P,r. Conran believe might occur at Shoreham.
i ANSWER.
i Five examples of systems interactions that could occur at a nuclear power station are:
A failure in a power supply causing spurious signals to the control system which in turn can result in opening of relief valves and subsequent loss 1.
of primary coolant.
A failure in power supply which could result in failure of control 2.
instrumentation leading to a transient resulting in reactor scram.
Failure of both vent and drain systems, due to a common discharge, could 3.
lead to a partial failure to scram in BWRs.
Failure of a turbine could generate a missile which in turn could damage 4.
safety related equipment.
A fire in some compartments could result in some loss of decay heat 5.
removal capability.
Current licensing requirements and safety review procedures used by the NRC staff are designed to address many different types of potential system inter-actions, including those listed above.
Adherence to the defense-in-depth principle and our related licensing requirements, such as the single failure criterien, result in redundant, independent and physically separated safety systems, and protection of each of the redundant safety systems against events such as high energy line breaks, missiles, high winds, flooding, seismic events Me believe that these licensing requirements, supplemented by the and fires.
review procedures of the Standard Review Plan.(which prov. ides for interdisciplinary reviews of safety systems and takes into account known potential system inter-actions significant to safety) provides reasonable assurance that operation of licensed nuclear power plants will not result in undue risk to the health and safety of the public.
The purpose of Unresolved Safety Issue A-17 " Systems Interactions in Nuclear Power Plants" is to provide confirmation that present licensing requirements and procedures are adequate (or in the alternative, to identify needed improvements) by detailed and systematic analyses of potential systems On one interactions and their safety significance on various plants.
plant we plan on applying various recognized methods and tec
.The results and evaluation of these analysrs are scheduledeto be completed by October 1984.
. o p.S r..
QUESTION.
Please indicate three examples of structures, systems, ar,d components with regard to which there is disagreement between the NRC staff (and/or Conran) and the Long Island Lighting Company.
A':S'.:EF..
Three examples of structures, systems and components with regard to which there is an apparent disagreement between Mr. Conran and the Long Island Lighting Company are the effluent treatment, standby liquid control and rod block monitoring systems.
Based on these examples (which he does not believe are significant of and by themselves) Mr. Conran has raised the question of whether the applicant's understanding of which features of the plant are or should be termed "important to safety", as used in NRC regulations, particularly General Design Criterion 1, is sufficient to provide reasonable assurance the public health and safety during plant operation will not be endangered.
A meeting with Long Island Lighting Company and the NRC staff to discuss this issue will be held on February 18, 1983.
~,
=
O s
4 h
e t
l l