ML20100G864

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1996 for GGNS Unit 1
ML20100G864
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/31/1996
From: Hutchinson C, Lin S
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-96-00015, GNRO-96-15, NUDOCS 9602260288
Download: ML20100G864 (6)


Text

.

i> ,

f ,.

Ent:r;y CpIrati:ns,Inc.

= ENTERGY r o t o 7so R/t GDwt MS 39160 W UA 437 ?800 C. R. Hutchinson w c Pwe,ru n (X-83;OW f yn Gi@ fAfiPil: Qafch February 15. 1996 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention: Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-96/00015 Gentlemen:

In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for January 1996, if you have any questions or require additional information, please contset this office.

Yours truly,

/$

CRH/TMC attachments: 1. Operating Status

2. Average Daily Power Level
3. Unit Shutdown and Power Reductions cc: (See Next Page) 2G0128 r

9602260288 960131 f,pYl PDR R

ADOCK 05000416- yi PDR l

, < i

' o, e i

~

February 15, 1996 GNRO-96/00015  ;

Page 2 of 3 l

i cc: Mr. D. C. Hintz (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. J. E. Todrow (w/a)  !

Mr. H. L. Thomas (w/o)  !

Mr. Leonard J. Callen (w/a) i Regional Administrator  ;

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 .

Arlington, TX 76011  !

Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation ,

U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555  !

1 I

J

February 15.'1996  ;

GNRO-96/00015 Page 3 of 3 i

bec: Ms. T. M. Carter (w/a) -

Ms. C. W. Gunn (w/a)

Mr. B. C. Holifield (LPP-11D)(w/a)

Mr. L. King (GE) (w/a) ,

Mr. R. J. King (ANO)(w/a) ,

Mr. S. D. Lin (w/a) i File (LCTS)/(RPTS) (w/a) f File (NS&RA) (w/s)

File (Central) (w/a) (9 )  ;

INPO Records Center (w/a) Mr. D. P. Galle 700 Galleria Parkway 162 Ruth Drive  !

Atlanta, Georgia - 30339-5957 Mokona, IL 60448 - -

Mr. Marcus Ware (w/a)

Manager of Production i South Mississippi Electric Power Association . '

P.O. Box 15849 Hattiesburg, MS 39401 Mr. Fred Yost (w/a)

  • Director Research Services Utility Data Institute 1700 K Street, N.W.  ;

Suite 400 Washington, D.C. 20006 ccmail: Mr. P. W. Alberstadt (w/a)  !

Mr. D. G. Bost (w/a)

Mr. C. A. Bottemiller (w/a)

Mr. R. N. Buckley (w/a) ,

Mr. S. A. Burris (w/a)

Mr. L. F.' Dale (w/a)

Mr. J. G. Dewease (w/a)

Mr. M. A. Dietrich (w/a)

Mr. J. L. Ensley (ESl) (w/a)

Mr. J. J. Fisicaro (RB) (w/a) i Mr. C. C. Hayes (w/a)

Mr. C. V. Hicks (w/a) i Mr. M. J. Meisner (w/o) i

~

Mr. R. V. Moomaw (w/a)

Mr. D. L. Pace (w/a)

Mr. R. L. Patterson (w/a) '

Mr. T. E. Reaves (w/a)

Mr. D. W. Vinci (W3) (w/a)

' Mr. R. G. West (w/a) '

Mr. M. J. Wright (ECH/660)(w/a)

  • Att:chmInt 1 to GNRO-96/00015 DOCKET NO 50-416 DATE 02/08/96 COMPLETED BY S. D. Lin TELEPHONE (801) 437-6793 OPERATING STATUS
1. Unit Name: GGNS UNIT 1
2. Reporting Period: Januarv 1995
3. Licensed Thermal Power (MWt): 3833 MWT
4. Nameplate Rating (Gross MWe): 1372.5 MWE
5. Design Electrical Rating (Net MWe): 1250 MWE ,
6. Maximum Dependable Capacity (Gross MWe): 1222 MWE
7. Maximum Dependable Capacity (Net MWe): 1173 MWE
8. If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:
9. Power Level To Which Restricted, if Any (Net MWe): N/A
10. Reasons For Restrictions, if Any: N/A This Month Yr to Date Cumulative
11. Hours in Reporting Period 744 744 __ 98.920
12. Number of Hours Reactor was Critical 744.0 744.0 80.935.0
13. Reactor Reserve Shutdown Hours 0 0 0 '
14. Hours Generator On-Line 744.0 744.0 77.922.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross' Thermal Energy Generated (MWH) 2.824.776 2.824.778 277.058.308
17. Gross Electrical Energy Generated (MWH) 951.293 951.293 88.820.484
18. Net Electrical Energy Generated (MWH) 914.279 914.279 84.913.924
19. Unit Service Factor 100.0 100.0 80.7
20. Unit Availability Factor 100.0 100.0 80.7
21. Unit Capacity Factor (Using MDC Net) 104.8 104.8 78.7
22. Unit Capacity Factor (Using DER Net) 98.3 98.3 71.6
23. Unit Forced Outage Rate .

0.0 0.0 6.4 l

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): i
25. If Shut Down At End of Report Period. Estimated Date of Startup: 1
26. Units in Test Status (Prior to Commercial Operation): l Forecast Achieved i'

INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 l

. AtttchmInt 2 to GNRO-96/00015 DOCKET NO 50-418 DATE 02/08/98 l COMPLETED BY S. D. Lin TELEPHONE (801) 437 8793 MONTH January 1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) ,

1 1231 17 1220 2 1245 18 1230 3 1253 19 1258 4 1247 20 1249 5 1237 21 1245 6 1232 22 1237 7 1257 23 1228 8 1070 24 1247 9 1248 25 1250 10 1243 26 1231 11 1238 27 1242 12 1150 28 1248 13 1183 29 1230 14 1228 30 1223 15 1225 31 1255 16 1223 l

l l

I 1

' a.

Attachment 3 to GNRO-96,90015 #

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-416 UNITNAME GGNS Unit 1 DATE 02/06/96 COMPLETED BY S. D. Lin

  • ELEPHONE (60lM37-6793 REPORT MONT11 I=n w I996 No. Date Type (1) Duration Reason Method Of Licensee System Code Component Cause & Corrective Action To .

Hours (2) Shutting Down Event Report # (4) Code Prevent Recurrence (C&CA) .

Reactor (5)

(3) l None l 1 2 3 4 5 F: Forced Reason: Method- Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training & 5-Reduced load Licensing Exenination 6-Other F-Administrative G-Operational Error (Explain)

H-Oth-r (Explain)

--- ,- - . , .- ~ n - ..-~ . . .- .. . - . .