Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106H222 + (07:50:25, 13 December 2024)
- ML20106H216 + (07:50:25, 13 December 2024)
- ML20106H214 + (07:50:26, 13 December 2024)
- ML20106H212 + (07:50:27, 13 December 2024)
- RC-96-0069, Submits Addl Info to Support Contention That Environ Effects of Plant Uprate Inconsequential.Uprate Will Increase Thermal Output of Plant by Approx 4.6 Percent,But Should Not Provide Any Adverse Impact to Surrounding Environ + (07:50:28, 13 December 2024)
- ML20106H197 + (07:50:28, 13 December 2024)
- ML20106H192 + (07:50:29, 13 December 2024)
- ML20106H190 + (07:50:31, 13 December 2024)
- ML20106H188 + (07:50:32, 13 December 2024)
- ML20106H174 + (07:50:33, 13 December 2024)
- ML20106H158 + (07:50:34, 13 December 2024)
- ML20106H169 + (07:50:34, 13 December 2024)
- ML20106H154 + (07:50:35, 13 December 2024)
- RBG-42624, Notifies NRC of Completion of Actions Identified in GL 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance + (07:50:35, 13 December 2024)
- ML20106H143 + (07:50:36, 13 December 2024)
- B11350, Forwards Response to Question Re Qualification of Turbine Bldg Vent Raised at ACRS Subcommittee 840828-29 Meetings. Vent Stack & Support Interface W/Turbine Bldg Has Considerable Inherent Seismic Capability + (07:50:37, 13 December 2024)
- ML20106H126 + (07:50:38, 13 December 2024)
- SNRC-1095, Advises That Addl thermal-hydraulic Analysis Will Be Forwarded for Approval Prior to Second Cycle Operation. Commitment Negates Need for License Condition Referenced in SER Section 4.4.1 + (07:50:39, 13 December 2024)
- ML20106H119 + (07:50:39, 13 December 2024)
- ML20106H104 + (07:50:40, 13 December 2024)
- ML20106H088 + (07:50:41, 13 December 2024)
- ML20106H085 + (07:50:41, 13 December 2024)
- ML20106H084 + (07:50:42, 13 December 2024)
- ML20106H082 + (07:50:43, 13 December 2024)
- PY-CEI-NRR-2036, Monthly Operating Rept for Feb 1996 for Perry Unit 1 + (07:50:43, 13 December 2024)
- ML20106H079 + (07:50:44, 13 December 2024)
- LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 + (07:50:45, 13 December 2024)
- ML20106H074 + (07:50:46, 13 December 2024)
- ML20106H067 + (07:50:46, 13 December 2024)
- ML20106H065 + (07:50:47, 13 December 2024)
- ML20106H059 + (07:50:48, 13 December 2024)
- ML20106H063 + (07:50:48, 13 December 2024)
- ML20106H056 + (07:50:49, 13 December 2024)
- ML20106H055 + (07:50:50, 13 December 2024)
- 05000352/LER-1985-007, :on 850110,half Scram Signal on Reactor Protection Sys Occurred Causing Isolation & Tripping of Reactor Recirculation Pumps.Caused by Faulty Voltage Regulator Card.Card Replaced + (07:50:52, 13 December 2024)
- ML20106H044 + (07:50:53, 13 December 2024)
- ML20106H035 + (07:50:53, 13 December 2024)
- ML20106H031 + (07:50:54, 13 December 2024)
- ML20106H030 + (07:50:55, 13 December 2024)
- 05000352/LER-1985-005, :on 850108,reactor Encl HVAC Isolated Because of Low Differential Pressure.Possibly Caused by High Winds Providing False Input to Outside Sensing Leg.Isolation Reset & Ventilation Normalized + (07:50:56, 13 December 2024)
- ML20106H014 + (07:50:58, 13 December 2024)
- ML20106H012 + (07:50:58, 13 December 2024)
- ML20106H008 + (07:50:59, 13 December 2024)
- 05000317/LER-1985-001, :on 850116,leakage Discovered in Two Safety Injection Tank Check Valves Necessitating Reactor Shutdown. Caused by Degraded O Rings.O Rings to Be Replaced & Tech Specs Changed + (07:51:01, 13 December 2024)
- ML20106H000 + (07:51:02, 13 December 2024)
- ML20106H002 + (07:51:02, 13 December 2024)
- ML20106G983 + (07:51:03, 13 December 2024)
- ML20106G971 + (07:51:04, 13 December 2024)
- ML20106G977 + (07:51:04, 13 December 2024)
- ML20106G968 + (07:51:05, 13 December 2024)
- ML20106G967 + (07:51:06, 13 December 2024)