l n _~:nu l

PERRY NUCLEAR POWER PLANT Mail Address:

Donald C. Shelton l 10 CENTER ROAD RR , O 10 44081 SENIOR VICE PRESIDENT PERRY, OHIO 44081 NUCLEAR (216) 259-3737 l

l March 15, 1996 PY-CEI/0 EPA-0247L Ohio Environmental Protection Agency P.O. Box 163669 Columbus, Ohio 43216-3669 Gentlement i

Enclosed are the NPDES monthly report forms for the month of  !

l February 1996.

l l

Also enclosed is Attachment 1, " Monitoring Results During Vater System Draining". This provides values for parameters monitored during the draining of the circulating and service water systems. Vater was routed to the east and vest storm drains per your letters dated July 31 and October 11, 1995. j 4

No violations occurred during this time period. If you have questions or require additional information, please contact Donna Tizzano at (216) 280-5514.

Very truly yours, gh r * ^

f Donald . Shelton DGT sc Enclosures cc: NRC Project Manager ,

NRC Resident Inspectors Office NRC Document Control Desk (Docket No. 50-440) 18C Region III n

9603200024 960229 DR ADOCK 0500 j0 Opero+mg Cor" pan.cs CleveiaN Decmc Nmmo+a I0 fed 0f040F

1 ONTHl.Y MEP0ftT,FORRI .

4 Parry Nualmar Power Plant SIB 00018800 FEB 1998 1 1 03/13/98 OH00634i 10 Center Rd.

Psrry 800 INTAKE WATER TO PLANT FROM LAKE ERIE 44081 Lake FORM Perry-E240 D. G. Tizzano 999 - --

WATER l TEMP.

F 00011 01 32 -

02 32 os 32 04 32 05 32 06 32 07 32 os 32 09 32 10 AH 11 AH 12 33 is 33 14 33

,is 33 16 33 17 34 18 34  !

19 34 '

20 34 21 34 22 34 I 23 34  !

! 24 34  !

25 34 i l26 34 l27 35 l28 35 l29 35  ;

30 31 898.00 33.259 35.000 32.000 AH- Computer down, manual measurement not taken REPORTER os . C '1 Qjth hg4g* p(

ONTHLY REPORT FORM h h e ,

. ...< s 1

l Perry Nuclear Power Plant 3IB00016004 FEB 1996 l

1 1 03/13/96 OH00634 l 10 Center Rd.

l Parry 44081 Lake 004 POINT REP OF DISCHARGE PRIOR TO TUNNEL ENTRY FORM Perry-E240 D. G. Tizzano 1 1 3 3 999 999 001 001 WATER CONDUI CHLORI PH TEMP. FLOW FREE A F MGD MG/L S.U.

00011 50050 50064 00400 01 36 84.4 .0 02 38 79.5 .0 8.2 03 41 79.5 .0 04 38 68.5 .0 os 35 61.3 .0- l i

l 06 36 61.2 .0 8.0 07 38 63.7 .0 l l

l os 40 64.0 .0 i

09 40 42.3 .0 8.1 '

10 AH 8.9 .0 11 AH 9.1 .0 '

12 58 5.2 .0 13 51 3.4 .0 8.2 14 52 3.2 .0 15 42 6.8 .0 1

i 16 42 10.6 .0 8.1 I 17 44 9.9 .0 18 44 7.2 .0 19 51 7.4 .0 20 45 10.9 .0 8.1 21 48 6.0 .0 22 '52 3.3 .0 23 46 9.3 .0 8.1 24 51 6.9 .0 25 50 4.1 .0 26 43 10.1 .0 27 43 10.2 .0 8.2 28 42 10.2 .0 29 42 10.5 .0 30 31 1188.0 757.60 0.0000 65.000 44.000 26.124 0.0000 8.1250 58.000 84.400 0.0000 8.2000 35.000 3.2000 0.0000 8.0000 AH- Computer Down. Manual Measurement Not Taken.

Conservative Flow Estimate, Computer Down. Values based on Control Room Logs.

RETORTER stas /, sh ,, h c. rLhs, etae rwvey'c

O 4500 n' owna.Y REPORr, FORM .

Pc;rry Nuclear Power Plant SIB 00016002 FEB 1996 1 1 03/13/96 OH00634f '

10 Center Rd.

Parry <4081 Lake 001 DISCHARGE FROM CHEMICAL CLEANING LAGOON FORM Perry-E240 D. G. Tizzano 1 1 2 2 2 2 3 999 999 '096 096 096 096. 001 CONDUI PH RESIDU PHOS-T COPPER IRON FLOW OIL GR TOT NF P-WET CU, TOT TOTAL TOTAL MGD S.U. MG/L MG/L UG/L UG/L MG/L 50050 00400 00530 00665 01042 01045 00550 01 02' 03 j 04 '

. 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 l 22 )

23 24 l 25 26 '

27 28 29 30 31 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 'O.0000 0.0000 0.0000 0.0000 0.0000 0.0000 No Discharge Occurred During the Month.

REPORTER tifG e .

~t R

a I

O M , 4500 #% 4 Fi}pp Parry Nuclear Power Plant SIB 00018001 FEB 1998 I

1 1 03/13/98 OH00834E i 10 Center Rd. 001 DISCHARGE FROM REGENERATE NEUTRALIZATION PITS Parry 44081 Lake FORM j Perry-E240 D. G. Tizzano 1 1 1 2 3 999 999 999 098 001 l

CONDUI PH PH RESIDU OIL GR FLOW (MAX) (MIN) TOT-NF TOTAL MGD S.U. S.U. MG/L MG/L 1 50050 00401 00402 00530 00550 01 AH AH AH 02 .016 7.6 7.5 03 AH AH AH 04 .023 7.2 7.1 Os AH AH AH 06 .018 7.5 6.7 6 AA i 07 AH AH AH i

08 AH AH AH 09 AH~ AH AH 10 'AH AH AH 11 AH AH AH 12 AH AH AH 13 .018 7.7 7.7 5' AA 14 AH AH AH 1s AH AH AH 16 AH AH AH 97 AH AH AH to .018 7.9 7.9 99 AH AH AH 20 AH AH AH 21 AH AH AH 22 AH AH AH 23 .034 7.2 6.8 7 AA 24 AH AH AH 2s AH AH AH 16 AH AH AH 27 AH AH AH as AH AH AH 19 AH AH AH 30 l 31 0.1270 45.100 43.700 18.000 AA 0.0212 7.5167 7.2833 6.0000 AA 0.0340 7.9000 7.9000 7.0000 AA 0.0160 7.2000 8.7000 5.0000 AA AA- Below detectable limit (5 mg/l for O&G; 2.5 mg/l for Residue)

AH- Sample Not Taken, No Discharge This Date KEPORTER 5- F(-% j . p.//M,C J((/h 8A4C Y\%Mep#t

t Attachment 1 - Monitoring Results During Water System Draining Date Flow (MGD) Temperature pH Chlorine Discharge Pt.

(*F) 02-01-96 .167 32 8.4 0.0 I East 02-14 96 .048 42 8.0 0.0 West 02-15-96 .028 52 7.8 0.0 West 02-17-96 .004 60 7.8 0.0

' West 02 20-96 .042 56 7.9 0.0 West 02-21-96 .001 57 7.8 0.0 West 4