Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113G427 + (05:10:45, 13 December 2024)
- ML20113G422 + (05:10:46, 13 December 2024)
- ML20113G421 + (05:10:47, 13 December 2024)
- RBG-43252, Responds to Violations Noted in Insp Rept 50-458/96-13. Corrective Actions:Completed Quarterly Valve Operability Test & Clarified Procedure Re Gauge Installation at Pressure Regulator + (05:10:48, 13 December 2024)
- ML20113G411 + (05:10:49, 13 December 2024)
- ML20113G414 + (05:10:49, 13 December 2024)
- 05000348/LER-1996-005, :on 960827,valves Misalignment Occurred Due to Personnel Error in Missed Surveillance.Provided Summary of Event & Mgt Expectations to Appropriate Operations Personnel + (05:10:51, 13 December 2024)
- BSEP-96-0348, Responds to RAI Re 960402 Proposed License Amend to Revise Tech Spec to Allow Uprate to 105% of Rated Thermal Power + (05:10:52, 13 December 2024)
- ML20113G397 + (05:10:53, 13 December 2024)
- ML20113G394 + (05:10:54, 13 December 2024)
- ML20113G388 + (05:10:55, 13 December 2024)
- ML20113G387 + (05:10:55, 13 December 2024)
- ML20113G385 + (05:10:57, 13 December 2024)
- ML20113G378 + (05:10:58, 13 December 2024)
- ML20113G377 + (05:10:59, 13 December 2024)
- ML20113G375 + (05:11:03, 13 December 2024)
- ML20113G372 + (05:11:04, 13 December 2024)
- ML20113G365 + (05:11:05, 13 December 2024)
- ML20113G363 + (05:11:06, 13 December 2024)
- ML20113G360 + (05:11:07, 13 December 2024)
- ML20113G358 + (05:11:09, 13 December 2024)
- ML20113G357 + (05:11:10, 13 December 2024)
- ML20113G350 + (05:11:11, 13 December 2024)
- ML20113G345 + (05:11:12, 13 December 2024)
- ML20113G342 + (05:11:13, 13 December 2024)
- AECM-85-0007, Monthly Operating Rept for Dec 1984 + (05:11:14, 13 December 2024)
- ML20113G333 + (05:11:16, 13 December 2024)
- ML20113G332 + (05:11:17, 13 December 2024)
- RBG-43231, Monthly Operating Rept for Aug 1996 for River Bend Station + (05:11:18, 13 December 2024)
- ML20113G309 + (05:11:21, 13 December 2024)
- ML20113G294 + (05:11:22, 13 December 2024)
- ML20113G290 + (05:11:23, 13 December 2024)
- 05000456/LER-1996-010-05, :on 960821,discovered Boraflex Shrinkage & Gaps.Caused by Deterioration as Result of Improper Material Selection.Implemented Controls on Spent Fuel Pool Boron Concentration & Silica Concentration + (05:11:25, 13 December 2024)
- ML20113G269 + (05:11:26, 13 December 2024)
- ML20113G280 + (05:11:26, 13 December 2024)
- 05000269/LER-1996-009, :on 960806,engineering Evaluation Discovered Error Existed in Calibr Procedure for Letdown Storage Tank Level Instrumentation for Units.Root Cause & Corrective Action Will Be Addressed in Supplemental Rept + (05:11:28, 13 December 2024)
- ML20113G253 + (05:11:29, 13 December 2024)
- ML20113G227 + (05:11:30, 13 December 2024)
- ML20113G242 + (05:11:30, 13 December 2024)
- NRC-91-0132, Forwards Implementation Program Plan for Emergency Response Data Sys,Per Guidance Contained in Rev 1 to NUREG-1394. Implementation of Sys Expected to Be Completed by 930213 + (05:11:31, 13 December 2024)
- ML20113G223 + (05:11:32, 13 December 2024)
- ML20113G219 + (05:11:33, 13 December 2024)
- ML20113G217 + (05:11:33, 13 December 2024)
- ML20113G214 + (05:11:34, 13 December 2024)
- ML20113G213 + (05:11:35, 13 December 2024)
- ML20113G201 + (05:11:35, 13 December 2024)
- ML20113G200 + (05:11:37, 13 December 2024)
- ML20113G199 + (05:11:37, 13 December 2024)
- 05000374/LER-1984-090, :on 841216,primary Containment Vacuum Breaker a Cycled Open & Then Closed.Caused by Temp/Pressure Decrease in Primary Containment Due to Operation of Vent & Purge Sys or Startup of Containment Chiller + (05:11:39, 13 December 2024)
- ML20113G194 + (05:11:40, 13 December 2024)
- ML20113G193 + (05:11:41, 13 December 2024)