5

OPERATING DATA REPORT DOCKET NO. 50-397 UNIT WNP-2 DATE 12/3/84 COMPLETED BY LB Hutchison i

TELEPHONE (509) 377-2501 ext 2486 OPERATING STATUS

1. REPORTING PERIOD: GROSS HOURS IN REPORTING PERIOO:
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3323 MAX. DEPEND. CAPACITY (MWo. Net): 1100 DESIGN ELECTRICAL RATING (MWo. Net): 'l100 MAX. DEPEND.CAPACITI (MWe-GROSS:) 1Ibb
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWo.NetJ:
4. ..EASONS FOR RESTRICTION (lF ANY):

THl3 MONTH YR TO DATE CUMULATIVE 3 5. NUM8ER OF HOURS REACTOR WAS CRITICAL ...............

6. REACTOR RESERVE SHUTDOWN HOURS . . . . . . . . . . . . . . . . . . . 0 0 0
7. HOURS GENER ATOR ON LINE . . . . . . . . . . . . . . . . . . . . . . . . . .

399.7 1993.9 1993.9

4. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH) ........ .....

1,100.500 3,773.492 3.773.492

10. GROSS ELECTRICAL ENERGY GENER ATED (MWHI . . . . . . . . . . . . . 357,910 1,117,250 1,117,250
11. NET ELECTRICAL ENERGY GENERATED (MWH) ........ ..... 341.016 1.045.118 1.045.118

~ ~ " ' ~ ~ ~ ' ' ~

12. R EACTOR SERVICE FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . .

~ ~~~

13. REACTOR AVAILABILITY FACTOR . . . . . . . . . . . . . . . . ...... ~~~E
14. UNIT SERVICE FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N/A ---- - ---

~ l5. UNIT AVAILA61 UTY FACTOR . . . . . . . . . . . . . . . . . . . . . . . . . . N/A ---- ----

"16. UNIT CAPACITY FACTOR (Uning MOC) ................ .. .

N/A ---- - ---

~~~~ ~~~~

17. UNIT CAPACITY FACTOR lusing Desgn MWel . . . . . . . . . . . . . . .

is. UNIT FORCED OUTAGE RATE .........................

N/A ---- - ---

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND OURATION OF EACH1:

Annual Maintenance outage: 4/15/85 for 60 days

20. IF SHUT COWN AT ENO OF REPORT PERIOD. ESTIMATED OATE OF STARTUP:
21. UNITS IN TEST STATUS IPRIOR TO CCMMERCIAL OPERATION): FORECAST ACHIEVED INmAL CRmCAUTY 1/16/84 1/19/84 INITIAL ELECTRICITY 5/15/84 5/27/84

. CcMMERCIAL CNAATION 12/10/84 Generator Name Plate 1,231,700 KVA 0 0.975.P.F.

DO$fo$ooo$$7 PDR

DOCXET NO. 50-397 LNI'T NAE WNP-2 DATE. 12/3/84 LNIT SHJTOOWNS / REDUCTIONS COMPLETED BY L B Hutchison; REPORT PERIOD NOV 19 84 TELEPHOE 377-2501 ext 2486 month, yHr HT- DATI", TVPE HIE NEANE TETFIGT IEfDDER 3Y5 TEN UNIMNT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE _,

84-30. 11/10/84 S: 249.7 B 3 ---

CC. VALVEX-FD Plant was shutdown by a Reactor SCRAM.. initiated by main steam isolation valve closure. test, as-part of the test and ascension program.- The test was successful and the plant remained down for a scheduled maintenance outage.

84-31 11/21/84 S 0.5 B 1 ---

HE VALVEX-X Tripped turbine generator at 24% power to test by pass valves capacity as part of the power ascension test program. Test was satisfactory and turbine generator was returned to-service.

84-32 11/27/84' F 70.1 A 3 LATER HH HT EXCH X Reactor SCRAM at 40% power level due to low condenser vacuum caused by a FW heater tube leak-and leaking FW heater shell side relief valve.

The tube leak was repaired.and modifications. .

were made to relief valve and plant was. returned to service.

I I - .

I SLM4ARY l WNP-2 continued in the test and ascension program during entire month. -

l l

l l TYPE REASON METHOD SYSTEM & COMP 0ENT l

l F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Haint or' Test G-Oper Error 2-Manual Scram Instructions for

!. C-Refueling .

H-Other 3-Auto Scram Preparation of l D-Regulatory Restriction 4-Continued Data Entry Sheet l ,. E-Operator Training 5-Reduced Load Licensee Event Report

, &. License Examination 9-Other (LER) File (MJREG-0161) s

. o. .

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397

. UNIT WNP-2 DATE 12/3/F,4 4

COMPLETED BY f..B. Ilutchison TELEPHONE 377-2501 est 2486 MONTri NOVEMBER 1984 DAY AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net) - (MWe-Net) 1 590 0 17 2 945 18 0 3 987 0.

19 4 .960 8 20 s 1017 21 261 6 986 22 926 7 999 23 874 ,

s 837 918 24 9 900 914 25 10 482 1,038 26 11 0 27 60 0

12 ' a 0 13 0 0 29-14 0

i 30 485 is 0 --

31 is 0 .

INSTRUCTIONS On this form, list the average daily unit porer level in MWe Met for each day in the repor:ing month.Compu:e :c :he nea:est whole megawatt.

These Ogures wi!! be used to plot a g:sph for each reporting month. Note that when maximum dependable capacztyis l

used for the net efectrical ratmg of the unit, there may be occasions when the daily average power Ievel exceeds the 10GTe line (or the restricted power icve! hae). In such cases. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l l

t'

"( o :

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 December 7, 1984 Docket No. 50-397 Director Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT N0. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for November 1984 as required by our Technical Specifications 6.9.1.6.

Ver truly yours J D. Martin (M/D927M)

NP-2 Plant Manager JDM/pl Enclosure cc: Mr. John B. Martin - NRC, Region V Mr. A.D. Toth - NRC, WNP-2 Site Ms. Dottie Sherman - ANI, Farmington, CT 1svt