ML20113G193

From kanterella
Jump to navigation Jump to search
Amends 152 & 144 to Licenses NPF-35 & NPF-52,respectively, Revising TS to Modify Section 3/4.7.5, Standby Nuclear Svc Water Pond, for Plant,Units 1 & 2,raising Minimum Water Level by 1 Foot
ML20113G193
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 09/20/1996
From: Berkow H
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20113G196 List:
References
NUDOCS 9609260237
Download: ML20113G193 (8)


Text

_

4^

\\*i j,

UNITED STATES 4

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20066 0001

%...../

DUKE POWER COMPANY NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE. INC.

l l

DOCKET N0. 50-413 CATAWBA NUCLEAR STATION. UNIT 1 l

AM MpMENT TO FACILITY OPERATING LICENSE 1

Amendment No.

152 License No. NPF-35 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-35 filed by the Duke Power Company, acting for itself, North Carolina Electric Membership Corporation and Saluda River Electric.

Cooperative, Inc. (licensees), dated November 15, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulati6ns and all appilcable requirements have been satisfied.

I i

l OOb13 DO P

PDR

L*'

3 l

l 2.

Accordingly, the license is hereby amended by page changes to the l

Technical Specifications as indicated in the attachment to this license i

amendment, and Paragraph 2.C.(2) of Facility Operating License No.

l NPF-35 is hereby amended to read as follows:

l Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.152, which is attached hereto, is hereby incorporated into this license. Duke Power Company shall operate the facility in accordance with the Technical Specifications.

1 l

3.

This license amendment is effective as of its date of issuance and shall l

be implemented within 30 days from the date of issuance.

]

FOR Tile NUCLEAR REGULATORY COMMISSION

./

lBt w%

/

Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation j

Attachment:

Technical Specification Changes Date of Issuance:

September 20, 1996 l

l i

t

I i

i i

ATTACHMENT TO LICENSE AMENDMENT NO.152 FACILITY OPERATING LICENSE NO. NPF-35 l

DOCKET NO. 50-413 Replace the following page of the Technical Specifications with the enclosed i

page. The revised page is identified by amendment number and contains l

vertical lines indicating the areas of change.

l Remove Paae Insert Paae l

3/4 7-14 3/4 7-14 l

l l

l l

l l

l s

l

!4 d

I l

J I

l l

l n;

1 PLANT SYSTEMS l

3/4.7.5 STANDBY NUCLEAR SERVICE WATER POND LIMITING CONDITION FOR OPERATION 3.7.5 The standby nuclear service water pond (SNSWP) shall be OPERABLE with:

a.

A minimum water level at or above elevation 571 feet Mean Sea Level, USGS datum, and b.

An average water temperature of less than or equal to 91.5*F at elevation 568 feet in the SNSWP.

L APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

With the requirements of" the above specification not satisfied, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE0VIREMENTS 4.7.5 The SNSWP shall be determined OPERABLE:

a.

'At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the water level to be within its limit, b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during the months of July, August, and September by verifying the water temperature to be within its limit, c.

At least once per 12 months by visually inspecting the SNSWP dam and l

verifying no abnormal degradation, erosion, or excessive seepage, l

and j

d.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during the months of July, August and September while the Nuclear Service Water System is aligned to Lake Wylie by recording the water temperature of Lake Wylie, as measured

=

l in the discharge path of an operating Nuclear Service Water pump.

l l

l i

e CATAWBA - UNIT 1 3/4 7-14 Amendment No. 152

l p""%

b 44 UNITED STATES j

NUCLEAR REGULATORY COMMISSION I

2 WASHINGTON, D.C. 20666-0001

(

DUKE POWER COMPANY NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 PIEDMONT MUNICIPAL POWER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAR STATION. UNIT 2 l

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 144 License No. NPF-52 l

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment to the Catawba Nuclear Station, Unit 2 l

(the facility) Facility Operating License No. NPF-52 filed by the l

Duke Power Company, acting for itself, North Carolina Municipal l

Power Agency No. I and Piedmont Municipal Power igency (licensees),

dated November 15, 1995, complies with the standards and l

requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the l

Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and l

safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this amendment will not be inimical to the common defense and secitrity or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 l

of the Commission's regulations and all applicable requirements have been satisfied.

p n;

i

{.

! l 2.

-Accordingly, the license is hereby amended by page changes to the l

Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No.

NPF-52 is hereby amended to read as follows:

l Technical Soecifications l

The Technical Specifications contained in Appendix A, as revised through Amendment No.144which are attached hereto, are hereby incorporated into this license.

Duke Power Company shall operate the facility in accordance with the Technical Specifications.

i 3.

This license amendment is effective as of its date of issuance and shall be inaplemented within 30 days from the data of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION sg kA

+M Herbert N. Berkow, Director l

Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specifications Changes l

Date of Issuance:

September 20, 1996 l

4 4

l g.

ATTACHMENT TO LICENSE AMENDMENT NO.144 FACILITY OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 Replace the following page of the' Technical Specifications with the enclosed l

page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

Remove Paae Insert Paae 3/4 7-15 3/4 7-15 1

i l

l I

I l

l r

l l

l i

PLANT SYSTEMS

- 3/4.7.5-STANDBY NUCLEAR SERVICE WATER POND ------ -- -

-a - --- - -

LIMITING CONDITION FOR OPERATION 3.7.5 The standby nuclear service water pond (SNSWP) shall be OPERABLE with:

a.

A minimum water level at or above elevation 571 feet Mean Sea Level, USGS datum, and b.

An average water temperature of less than or equal to 91.5'F at elevation 568 feet in the SNSWP.

l l

APPLICABILITY: MODES 1, 2, 3, and 4.

l l

ACTION:

With the requirements of the above specification not satisfied, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE0VIREMENTS 1

4.7.5 The SNSWP shall be determined OPERABLE:

a.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the water level to be within its limit, f

b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during the months of July," August, and September by verifying the water temperature to be within its limit,

)

i c.

At least once per 12 months by visually inspecting the SNSWP dam and verifying no abnormal degradation, erosion, or excessive seepage, and d.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> during the months of July, August and September while the Nuclear Service Water System is aligned to Lake l

Wylie by recording the water temperature of Lake Wylie, as measured in the discharge path of an operating Nuclear Service Water pump.

l t

l

}

i 4

I CATAWBA - UNIT 2 3/4 7-15 Amendment No. 144 I

-