ML20113G201
| ML20113G201 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 10/28/1991 |
| From: | Creel G BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9111040239 | |
| Download: ML20113G201 (2) | |
Text
_
D AL11MORL
+
GAS AND I
ELECTRIC CHARLES CENTER e P O BOX 1475
- DAllifAORE, tA ARYLAND 21?O314/b G E O 4 0 t C L u t. t t.
October 28,1991 v a.. m t~'
o m..,t
..o.
- ...s, U. S. Nuclear Regulatory Comtnission Washington,DC 20555 ATI'liNTION:
Document Control Desk SUlulicr:
Calvert Clifts Nucicar Power Plant Unit Nos.1 & 2; Docket Nos. 50 317 & 50-318 limergnev ilesimnse Data Sptem Gentlem-i:
"itly, the NRC amended 10 Cl~R Part 50, Appendis 11, to include Section VI, timergency i
- ase Data System. As required in paragraph 4.a of Section VI, we have attached our im, ementr. ion schedule.
Should you have any further questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours, A, /
',/
7
/
O-t GCC/REF/dinthjd Attachtnent ee:
D. A. Ilrane, Esquire J. E. Eilberg, Esquire R. A. Capra, NRC D. G. Mcdonald, J r., h RC T. T. Martin, N RC A. G. llowe, NRC R.1. McLean. DNR J. II. Walter, PSC LO b
d emom miom i
F'DR f4 DOC K 05000317
(
1p F
\\
1 61*l3CllMIEltll)
IIAl!!'INIOltt GAS & ELirlillC CON 11'ANY CAINI'l(T Cl.llTS NUCl.EAlt l'OWElt Pl ANT 1:NIEl(Gl:NCY l(ESI'ONSE D AT A SYSTI:N1 lillil31}iN1hllON S1'l!!illllll llG&E TASK CON 11'l.lilION 1)l;SliiM61'lON Jjl:SClyl'_110N j) ATE 1.
Questionnaire Receipt Completed 2.
til Contact ilG&ll Initial Contact Comple.
3.
Conduct Site Survey Complete 4.
NRC Install l' hone Line 3f/2
- 5.
DPL/ pal Submitted Completc 6.
NUS Develops DPL Sof tware 7.
IlG&li Develops:
a.
Send System Software if>2 b.
Send Systern liardware 2?>2
- c.
Plant Computer Software 3?>2 8.
Per form lilectrical Design 5f>2 9.
Perfor m lilectrical Installation 7f>2 10.
Preliminary Transmission Testing 7 83>2
- 11.
Formal System Test at NUS 83>2*
12.
limergency Response Plan / Maintenance 8?>2
- Procedures / Procedures Development 13.
System Acceptance Test at NRC 8?>2
- 14.
On Line 93)2
- Requiics NUS or NRC action to implemer.t on schedule.
1
-