Rev 4 to VEGP-14230-1, AC Source Verification
ML20113G345
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/27/1988
From: Kitchens W
GEORGIA POWER CO.
To:
Shared Package
ML20092F288 List: ... further results
References
CON-IIT05-136-90, CON-IIT5-136-90, RTR-NUREG-1410 VEGP-14230-1, NUDOCS 9202200447
Download: ML20113G345 (7)


Text

.. ~ m..

.m

..._,_-.,m.

. _. ~ _.. ~. - _ _. _ _ _

=.

p' Approv3 ProceCurt No.

Vogtle sectric Generating Plant-

-14230 -R 3.l NUCLEAR OPERATIONS -

g,,,,,,n g,,

oate 4-1[A?/FK Unit 1

Georgia Power e.a. ~o.

1 of 7-FOR NFORMAT!0N ONL.Y "*

A.C. SOURCE VERIFICATION

[}EAOi: Nb OES,ROY 1.D PURPOSE 1.1 The purpose of this procedure is to demonstrate the-operability of the offsite transmission network-to the onsite Class IE Distribution System by verifying correct breaker alignment and indicated power availability.

1.2 This surveillance satisfies Technical Saecifications 4.8.1.1.la and the part of 4.8.1.2 whic:1 requires 4.8.1.1.la to be performed.

1.3 The frequency of this surveillance is at least once-every 7 days.

2.0 APPLICABILITY This-surveillance is required for all Modes.

- 3. 0 PRECAUTIONS AND LIMITATIONS 3.1

~ Do not cperate any Circuit Breaker or Disconnect Switch without-permission from the Unit-Shift Supervisor (USS)..

-3.2 Due to a phase-crossover on the low side of-the-500KV Anco Transformers the 500KV swit.chyard shall~ only be-used-to supply one offsite power source.

INITIALS

-4.0 PREREQUISITES OR INITIAL CONDITIONS The USS.shall! ensure'th1s surveillance test-.does not affect'other tests presently in progress ~or jeopardize plant operation prior to granting approval'to. perform this surveillance o

test.

USS APPROVAL LO 9202200447 920116 PDR ADOCK 05000424 S

PDR

- TNQ3 0?A edC$tM

.m

PRoCEDUnE No.

REVISloN PAGE No.

fVEGP 14230-1 4

2 of 7 s,

~

INITIALS

)

5.0 INSTRUCTIONS Test Started DATE TIME MODE 5.1 PLACNanxintheappropriatebox next to the closed power Circuit Breakers on Figures 1, 2 and 3.

5.2 RECORD the voltages on Figures 1, 2 and 3.

CAUTION The 500KV switchyard shall only be used to supply one offsite power source.

NOTE The same offsite power source may be utilized for both units provided independence is maintained O-between source one and i

source two.

5.3 If in Modes 1, 2. 3 or 4, from Figures 1, 2 and 3, VERIFY there are at least two offsite-independent power sources feeding through-the 230kV switchyard via-separate breakers through RATS INXRA and 1NXRB to busses IAA02 and 1BA03.

LIST two energized off-site

_ power sources.

Source 1 Source 2 5,4 If in Modes 5 or 6, from Figures 1, 2 and 3, VERIFY there is at least one offsite power source-feeding through L

1he 230kV switchyard through RAT INXRA to bus 1AA02 and/or.through H

RAT INXRB to bus 1BA03. LIST one energized offsite power source.

[

Source A

man L-

c

~

FRoCEDURE No.

REVISloN PAGE No-VEGP 14230-1 4

? of 7-(}

6.0 ACCEPTANCE CRITERIA 6.1 Two operable, physically independent circuits between the offsite transmission network and the onsite Class IE Distribution System in Modes 1. 2, 3-and 4.

6.2 One operable circuit between the offsite ttansmission nstwork and the onsite Class IE Distribution System in Modes 5 and 6.

6.3 Power available on selected power source (s).

j 7.0 EVALUATION AND REVIEW 7.1 TEST PURPOSE

[ ]

Surveillance

{ ]

Maintenance Retest

[ ]

Other (explain) 7.2 Results obtained through performance of this procedure meet ACCEPTANCE Cd1TERIA of Section 6.0.

[ ] YES

( ) NO 7.2.1 If NO was checked, NOTIFY the, USS.

REFER to Technical i

Specification 3.8.1.1 or 3.8.1.2.

7.2.2 Comments (include any abnormal conditions and corrective actions taken:

6 USS notified of Test Completion and Results l

/

/

Initials Date Time Test Completed By:

/

/

Signature Date Time Supervisory Review

/

-/

Signature Date Time

(

m-,

~

t PAOCEDURE NO.

MVISION PAGE NO-I VEGP 14230-1 4

4 of 7

~

8.0 REFERENCES

8.1 FSAR Sections 8.2 and 8.3 l

8.2 1X3AE01-20 EAB As-Built I

~

r i

8.3 IX3AE01-24 EAB As-Built 8.4 AX3D-AA-L50A One-Line Diagram 8.5 Technical Specifications 3.8.1.1 and 3.8.1.2 END OF PROCEDURE TEXT i

e 4

i E

p t

L e

t l

I l.

. M44b I

... _ -., _ _ _, _ _ _ _ - -. - _.. - _. - _... _.._ _. _.a

i VECP 14230-1 4

5 of 7 i

UNIT 1 230KV SUBSTATION (F o re 7)

(Figure 7) a.t.

a.t.

l Treesforure Treesfe e A*Tuste Geshen Geshee Scgac WiI5**

me. I No. 7 Pewsprint uhtte tie <6 4

JL J6 JL JL 4

)

ll 779 El939 El 139 11 919 ll 949

$ 349 169 i

EY KY KY EV EV ET U

i El s73 ll833 II 833 II S43

$ 963 1

8?ol I

3301

_J sto!

I sool I

sool I

15 871 ht sit 11 sin El s4:

3p 86:

f 4

H E,

q lB973 ll 771 l1933 ll 731 E1933 $711

$1943 !!783

$%)

$ 761 970 770 9 30 730 910 FIG 9e0 740 940 760 1

11 11 Il l

I I O I

ll 1

I I

I I

l1 973 l1773 E1931 ll733 11911 15733 ll141 l[743 IB 961 ll 763 73KY Sus 90. 7 4

7XEY Sers me. I 1

f 977 l[ 716 y

See ud Fig. 3 F"

y J

NOTE : actual switch ese breaker numbers tpilt 1 i

G are.the eissbers sfiouse eheve pref f sed by

.i i.

5 - ot sco== c t switc h 1

1 - se,se,,

FIGURE 1 - A.C.

SOURCE VERIFICATION

,. m

_i

i

.t

!i

!l!LtI iI i!

lt!

}

! j; Iii*

,[!I F, l!t l k

g 7

fo 6

v r*)2 a

s s*=

e*

s*=

ss E ** e ee rr t

T. 5' U ep m

rm a

O y

e tne=

e t=

h a

c o

n a

ss s

N m

m n

t nm t

e e

a2 m3 n

g(

(a,

s

{

g e.

e' a

e N

s" r

sa P

s O

WE s

e s

e a

we r

a s,-

I s

1 em T

n m

1n

  • u A

t s

r meg ma C

a = w.

s a

e s

u s

N c

I i

I

[

O l

I

]

F t

3 i

I I

R T

p E

A W

a V

T i

4 SB E

U C

S RU V

a s

O e

s s

K m

e a

S m

l E

0 ea a

I I

n tz 0

C.

I I

I 5

e E

E E

E I

I I

A 2

E

=

0 s

t 7s I

r l

s T

e e l

e e

5 e

m I

e ns 2

N s

U E

E R

U' n

G 0

I 9,

F y

u e

s R

a g

i e

r t

s I

E Vt c

I 8

I I

T S

k lM I

E I

r s

r W

e a

o l

I B

S a

e w

e 1

S 0

32 4

1 PG

)

E

. V o

N e

ru de r

co w

r P

r l

i i,

ii;!i l:

i!i l$

q

.l i!

s

k fLll lI!i!

![!l i

.le hs l

!I[

~

's i

l 7

O I

e m

h5e fo m

2 R

7 eGS t

I I

i I

1 I t iiiiI

i 1 i J

q t In n

v s,e e

owm r_1 f

s m

o#

aI MtI W

l r

r I

e m

wm o-s i

wl I

o N

eg a

P e

n e

owm m

I sl t

n r

I i

I e

m _

~

e wm o

n s

hi

~

%e i

sa m

oI F

4 m

I s

e a iF 3

t M e.e s

77 s

L E

s 3

t I

' i g iii1 i iiI 8

'1 i

R i

g U

l i g i i i l

8 l i i l

iI i

J_

G O

n I

na F

mwm a

a m

/

I AI 1m i

y i

b F

ro a

u_

M e

w wr m

s

=

z o

st y

e rf ee r

mp sI I

e un rw mm s

e F

ev t s e

oo bw h

F r

i c

d s t

n t

as w

n e

hr c

t te owm a

m c

t u e

t 1

l

/

r e m m

r i

s m

e N

r r

o 4

1 u

sl c

2 i

etI s

a a

o 1

m I

1 e

t eI 9

p i

e e

n 3

L 3

wm a

n n

cr o

i 0

A a*

I y

m ueI r

l 2

T s

4 S

1 F

l 8

I i

1 i i i i i t

I i l I

P G

E O

_ V oN e

u u

rP ts