Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-96-0256, Provides Response to Violations Noted in Insp Repts 50-324/96-05 & 325/96-05.Corrective Actions:Guidance Provided to Operations Personnel Re Reporting of Adverse Conditions in Timely Manner + (04:29:27, 13 December 2024)
- NRC-92-0105, Monthly Operating Rept for Sept 1992 for Fermi 2 + (04:29:27, 13 December 2024)
- W3P85-0663, Forwards Preservice Insp Rept for 831115-841217.Visual Insp Program Addresses Exemptions Applied During Selection of Exam Items & Includes Relief Requests & List of All Components & Piping Supports Included in Visual Exam Scope + (04:29:28, 13 December 2024)
- ML20115C321 + (04:29:28, 13 December 2024)
- ML20115C310 + (04:29:29, 13 December 2024)
- ML20115C298 + (04:29:30, 13 December 2024)
- ML20115C306 + (04:29:30, 13 December 2024)
- RBG-37592, Monthly Operating Rept for Sept 1992 for RBS Unit 1 + (04:29:31, 13 December 2024)
- ST-HL-AE-4211, Forwards Proposed Revisions to Updated FSAR to Reallocate Margin to Address Large Break LOCA Analysis for Initial Containment Temp Assumptions + (04:29:32, 13 December 2024)
- ML20115C285 + (04:29:32, 13 December 2024)
- ML20115C282 + (04:29:33, 13 December 2024)
- ML20115C279 + (04:29:34, 13 December 2024)
- ML20115C280 + (04:29:34, 13 December 2024)
- RBG-37573, Responds to NRC Re Violations Noted in Insp Rept 50-458/92-26 on 920705-0815.Corrective Actions:Surveillance Test Procedure STP-202-3603 Revised & Util Will Schedule as Found Testing Prior to Work for Ads/Srv Check Valves + (04:29:35, 13 December 2024)
- ML20115C271 + (04:29:36, 13 December 2024)
- 05000354/LER-1992-009-02, :on 920916,RWCU Isolation Occurred.Caused by Inadequate Planning for Removal of Analog Logic Cabinet. Instruction for Removal of Logic Cabinets Will Be Developed for Use in Future Work Packages + (04:29:38, 13 December 2024)
- ML20115C256 + (04:29:39, 13 December 2024)
- ML20115C251 + (04:29:39, 13 December 2024)
- ML20115C241 + (04:29:40, 13 December 2024)
- ML20115C235 + (04:29:41, 13 December 2024)
- 05000325/LER-1992-025, :on 920915,discovered That Effluent Sampling Equipment Not in Svc When Reactor Bldg Ventilation Sys Started.Caused by Procedure Prerequisites Not Being Verified Adequately.Procedural Enhancements Evaluated + (04:29:42, 13 December 2024)
- ML20115C227 + (04:29:44, 13 December 2024)
- BVY-92-119, Forwards Revised Response to Weaknesses Noted in Insp Rept 50-271/92-80 on 920224-28.Corrective Actions:Plan to Update Procedure Generation Package,Revise OEs & Other Plant Operating Procedures & Incoporate Updates to EOPs + (04:29:45, 13 December 2024)
- ML20115C217 + (04:29:45, 13 December 2024)
- 05000457/LER-1996-006-06, :on 960607,missed TS Required Diesel Oil Sample Due to Inadequate Work Practice.Changed Work Practices & Clarified Mgt Expectations + (04:29:47, 13 December 2024)
- ML20115C185 + (04:29:48, 13 December 2024)
- ULNRC-03397, Informs of Implementation of Amend 111 to License NPF-30. Amend Approved Changes to TS 1.7,4.6.1.1,.3.6.1.3,4.6.1.3, 6.8.4 & Associated Bases Section + (04:29:49, 13 December 2024)
- ML20115C184 + (04:29:49, 13 December 2024)
- ML20115C178 + (04:29:50, 13 December 2024)
- ML20115C163 + (04:29:51, 13 December 2024)
- ML20115C142 + (04:29:51, 13 December 2024)
- ML20115C128 + (04:29:52, 13 December 2024)
- ML20115C118 + (04:29:53, 13 December 2024)
- ML20115C119 + (04:29:53, 13 December 2024)
- ML20115C114 + (04:29:54, 13 December 2024)
- ML20115C111 + (04:29:55, 13 December 2024)
- ML20115C095 + (04:29:56, 13 December 2024)
- ML20115C101 + (04:29:56, 13 December 2024)
- ML20115C086 + (04:30:00, 13 December 2024)
- ML20115C082 + (04:30:01, 13 December 2024)
- ML20115C060 + (04:30:05, 13 December 2024)
- ML20115C044 + (04:30:06, 13 December 2024)
- ML20115C039 + (04:30:06, 13 December 2024)
- ML20115C035 + (04:30:07, 13 December 2024)
- ML20115C029 + (04:30:08, 13 December 2024)
- 05000328/LER-1996-003-05, :on 960605,reactor Trip Breakers Manually Opened Because Shutdown Bank D Dropped Into Reactor Core.On 960607 Manual Reactor Trip Initiated Due to Dropped Rod. Added Caution Statement to Apropriate Operations Prcedure + (04:30:09, 13 December 2024)
- 05000277/LER-1992-016-01, :on 920911,discovered That Containment Venting & Outgoing Activities Had Been Started While SBGTS Awas Removed from Svc & Inoperable.Caused by Personnel Error. Containment de-inerting Terminated + (04:30:12, 13 December 2024)
- BSEP-96-0248, Provides Request for Termination of SRO License Associated W/Bsep,Units 1 & 2 IAW 10CFR55.55(a) + (04:30:13, 13 December 2024)
- ML20115C004 + (04:30:14, 13 December 2024)
- 05000277/LER-1992-018, :on 920915,security Personnel Discovered That TS Required 1 H Firewatch Performed in Excess of 1 H Interval.Caused by Personnel Error.Security Supervisor Counselled + (04:30:15, 13 December 2024)
- 0CAN109202, Forwards Revised ERDS Data Point Library for Arkansas Nuclear One Units 1 & 2 + (04:30:17, 13 December 2024)
- ML20115B989 + (04:30:17, 13 December 2024)