. - _ _

Attachment to TXX 9M1 PageS of 8' COMANCHE PsAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT Revision No.1 -

DOCKETNO:

N UNIT:

CPSES 1 DATE:

. October 14,1992 COMPLETED BY:

Gienn Davis TELEPHONE:

8174974277 s

OPERATING STATUS 1.

Reporting Period: A mt 1992 Gross hours in reporting period:

264 2.

Currently authorlied power level (MWt):

2111 Max. depend.cepacity(MWe Net): 1150

  • Design Electrical Rating (MWe-Net):

115Q 3.

Power level to which restricted (if any) (MWe Net):

HQUA 4.

Reasons for restriction (if any):

THISMONTH

' YRTO DATE CUMULATIVE 5.

Number of hours reactor was critical N

N4 14117.6 6.

Reactor reserve shutdown hours O

M8 m

7.

Hours generator on line 8.

Unit reserve shutdown hours

, 11, 4

,188 4,W,182 9.

Gross thermal energy generated (MWH) u 10.

Gross electrical energy generated (MWH) -

5,915,734' 14,252,732 11.

Net electrical energy generated (MWH) 803,345 5,648,263 13,543,827 12.

Reactor Service factor 100 97.4 78.5 13.

Reactor availability factor 100 97.7 89.6 %

14 Unit service factor -

100 95.9 76.8 15.

Unit availability factor 100 95.9 76.8 16.

Unit capacity factor,.P8ng MDC) 93 9 83.9 65.5 l

93 9-83 9 65.5 17.

Unit capacity tactor (Using Design MWe) 18..

Unit forced outage rate 0

4.1 83 19.

Shutdowns schedukd over next 6 months (Type, Date, and Duration of each):

Refueling outage 2 is wheduled to begin October 22,1992, with a duration of 70 days.

20.

If shutdown at end of report period, estimated date of startup:

21.

Units in test status (prior to commercial operation):

ACHIEVED Commercial Operation 900813 AUGUST.1992.

Estimated 9210190244 921014 PDR ADOCK 0500 5

R

t Attachment to TXX. 92491 Page 6 008 4

AVERAGE DAILY UNIT POWER LEVEL 4

I DOCKET NO:

N UNIT:

CPSES 1 l

DATE:

October 14,1992 COMPLETED BY:

Glenn Davis i

TELEPHONE:

8174975277 MONTH: Aw;L$t 1992 DAY AVERAGE DAILY POWERLEVEL DAY AVERAGl. DAILY POWER LEVEL 1

(MWe-Net)

(MWe -Net) 1 1"

17-1087 I

5 1085 2

18 1087 3

1087 3g 1087 4

1086 20 1000 l

5 1078 21 1082 l

G 1085 22

~ 968 4

l 7

1M 23 10 3 8

987 24 1CB7 9

1086 25 1008 10 1084 26

-1086 11 1082 27 1089 i-12 1083

-28 1086 1

10 1064-29 1086 14 1086 30 1088 4-15

~1086 31 1080 16 1086

{

AUGUST 1992 j

REVISION 1

' Attachment to TXX. 92e1

, Pags 7of 8

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:

N l

UNIT: 1

. CPSES 1 i

. DATE:

October 14,1992 COMPLETED BY:

1 Glenn Davis 1-TELEPHONE:

817497427 l

MONTH: AUGUST 19tg 0601 0000 Unit started the month in rnode 1 with the reactor operating at approximately 100 percent of rated thermal power.

l

'0801 2400 Unit ended the month in mode 1 with the reactor operating a' approximately 1t>0 percent of rated thermal power.

l 1

i i.

i I

4 AUGUST 1992-REVISION 1

Attachment to7XX. 92491 Page 8 of.8 UNIT SHUTDOWN 3 AND POWER REDUCTIONS DOCKET NO:

50445 UNIT:

CPSES1 DATE:

October COMPLETEDBY; Glenn Davis TELEPHONE-817497-5277 REPORT MONTH AUGUST 1992 hETHOD OF TW SHUTTNG DOWN FPCRCED DURATION TEREACTOROR NQ, DATE S:SCEDULED (HOURS EASON REDUCNG POWER CORRECTNEACTIONSCOhWENTS t.o staldowns or sigrdicant power reductions occurred during the rnor<h.

4 AUGUST 1992 REVISION 1 1)

NASON

2) METHOD A EC'JIPMENTFAILURE(EXPLAN)

E. OPERATOR TRANNG AND UCENSE EXAMINATKN 1: MANUAL B: MAINTORTEST F: ADMNSTRATNE 2: MANUALSCRAM C: N2 G-OPEffATIONALERROR(EXPLAIN) 3: AUTOMATICSCRAM D: FEGLLATORYREST91CTION H: OTHER(EXPLAN) 4: OTHER(EXPLAN) m