Attachment to TXX 9M1 PageS of 8' COMANCHE PsAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT Revision No.1 -
DOCKETNO:
N UNIT:
CPSES 1 DATE:
. October 14,1992 COMPLETED BY:
Gienn Davis TELEPHONE:
8174974277 s
OPERATING STATUS 1.
Reporting Period: A mt 1992 Gross hours in reporting period:
264 2.
Currently authorlied power level (MWt):
2111 Max. depend.cepacity(MWe Net): 1150
- Design Electrical Rating (MWe-Net):
115Q 3.
Power level to which restricted (if any) (MWe Net):
HQUA 4.
Reasons for restriction (if any):
THISMONTH
' YRTO DATE CUMULATIVE 5.
Number of hours reactor was critical N
N4 14117.6 6.
Reactor reserve shutdown hours O
M8 m
7.
Hours generator on line 8.
Unit reserve shutdown hours
, 11, 4
,188 4,W,182 9.
Gross thermal energy generated (MWH) u 10.
Gross electrical energy generated (MWH) -
5,915,734' 14,252,732 11.
Net electrical energy generated (MWH) 803,345 5,648,263 13,543,827 12.
Reactor Service factor 100 97.4 78.5 13.
Reactor availability factor 100 97.7 89.6 %
14 Unit service factor -
100 95.9 76.8 15.
Unit availability factor 100 95.9 76.8 16.
Unit capacity factor,.P8ng MDC) 93 9 83.9 65.5 l
93 9-83 9 65.5 17.
Unit capacity tactor (Using Design MWe) 18..
Unit forced outage rate 0
4.1 83 19.
Shutdowns schedukd over next 6 months (Type, Date, and Duration of each):
Refueling outage 2 is wheduled to begin October 22,1992, with a duration of 70 days.
20.
If shutdown at end of report period, estimated date of startup:
21.
Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 AUGUST.1992.
Estimated 9210190244 921014 PDR ADOCK 0500 5
R
t Attachment to TXX. 92491 Page 6 008 4
AVERAGE DAILY UNIT POWER LEVEL 4
I DOCKET NO:
N UNIT:
CPSES 1 l
DATE:
October 14,1992 COMPLETED BY:
Glenn Davis i
TELEPHONE:
8174975277 MONTH: Aw;L$t 1992 DAY AVERAGE DAILY POWERLEVEL DAY AVERAGl. DAILY POWER LEVEL 1
(MWe-Net)
(MWe -Net) 1 1"
17-1087 I
5 1085 2
18 1087 3
1087 3g 1087 4
1086 20 1000 l
5 1078 21 1082 l
G 1085 22
~ 968 4
l 7
1M 23 10 3 8
987 24 1CB7 9
1086 25 1008 10 1084 26
-1086 11 1082 27 1089 i-12 1083
-28 1086 1
10 1064-29 1086 14 1086 30 1088 4-15
~1086 31 1080 16 1086
{
AUGUST 1992 j
REVISION 1
' Attachment to TXX. 92e1
, Pags 7of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO:
N l
UNIT: 1
. CPSES 1 i
. DATE:
October 14,1992 COMPLETED BY:
1 Glenn Davis 1-TELEPHONE:
817497427 l
MONTH: AUGUST 19tg 0601 0000 Unit started the month in rnode 1 with the reactor operating at approximately 100 percent of rated thermal power.
l
'0801 2400 Unit ended the month in mode 1 with the reactor operating a' approximately 1t>0 percent of rated thermal power.
l 1
i i.
i I
4 AUGUST 1992-REVISION 1
Attachment to7XX. 92491 Page 8 of.8 UNIT SHUTDOWN 3 AND POWER REDUCTIONS DOCKET NO:
50445 UNIT:
CPSES1 DATE:
October COMPLETEDBY; Glenn Davis TELEPHONE-817497-5277 REPORT MONTH AUGUST 1992 hETHOD OF TW SHUTTNG DOWN FPCRCED DURATION TEREACTOROR NQ, DATE S:SCEDULED (HOURS EASON REDUCNG POWER CORRECTNEACTIONSCOhWENTS t.o staldowns or sigrdicant power reductions occurred during the rnor<h.
4 AUGUST 1992 REVISION 1 1)
NASON
- 2) METHOD A EC'JIPMENTFAILURE(EXPLAN)
E. OPERATOR TRANNG AND UCENSE EXAMINATKN 1: MANUAL B: MAINTORTEST F: ADMNSTRATNE 2: MANUALSCRAM C: N2 G-OPEffATIONALERROR(EXPLAIN) 3: AUTOMATICSCRAM D: FEGLLATORYREST91CTION H: OTHER(EXPLAN) 4: OTHER(EXPLAN) m