.l.
OPERATING DAT,A REPORT DOCKET NO.
50-244 DATE March 14. 1985 COMPLETED BY Andrew E. McNamara TE LE Pil'ONE 1(3151524-4446 OPERATLNG STATUS Ext. 301 Cinna Station
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes The reactor power
- 2. Reporting Period:
February. 1985 level was maintained at
- 3. Licensed Therr,al Power (MWr):
100% until the 12th when 490 coastdown commenced
- 4. Nameplate Ratarg (Gross MWe):
- 5. Design Elecnical Rating (Net MWe):
470 toward the Annual Refuel-
- 6. Maximum Dependable Capacity (Gross MWe): 490 ing shutdown.
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (tiet MWe):
~
- 10. Reasons For Restrictions, If Any:
This Month Yr. to Date Cumulative
- 11. Ilours In Reporting Period 672 1.416 133.776.00
- 12. Numtwr of Ilours Reactor Was Critical 672 1.416 101.864.71
- 13. Reactor Reserve Shutdown llours 0
0 1 687.55*
672 1.416 99.708.38
- 14. Ilours Generator On Line 0
0 8.5 *
- 15. Unit Reserve Shutdown llours
- 16. Gross Thermal Energy Generated (MWil) 964.344 2.091_.960 138.377_721
- 17. Gross Electrical Energy Generated (MWil) 320,431 694.M6 45.179.933
- 18. Net Electrical Energy Generated (MWil) 304,168 660.161 42,843,182
- 19. Unit Service Factor 100%
100%
74.87%
- 20. Unic Availability Factor 100%
100%
74.88%
- 21. Unit Capacity Factor (Using MDC Net) 96.30%
99.19%
69.82%
- 22. Unit Capacity Factor (Using DER Net) 96.30%
99.19%
69.82%
- 23. Unit Forced Outage Rate 0
0 7.64%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Commulative total commencing January 1, 1975.
..... m e v. m.
h(/7{
8504180287 850228 PDR ADOCK 05000244 R
PDR b./
On t
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE March 14, 1985 COMPLETED BY Andrew E.
McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH February, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
478 17.
449 2.
479 18.
445 3.
478 19.
441 4.
478 20.
438 5.
477 21.
434 6.
479 22.
430 7.
478 23.
424 8.
479 24.
419 9.
478 25.
414 475 26.
409 10 11.
474 27.
406 12.
472 28.
400 13.
468 29.
14.
463 30.
15.
455 31.
16.
453 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
IXX:KET NO.
50-244 UNITNAME _,Ginna Station e, -
UNIT SHUTDOWN AND POWEP. REDUCTIONS DATE harch'14. 1905 COMPLETED BY Andrew E. McNamara REPORT MONTH February TELEPilONE 1 ( ll 51 524-4446 Ext. 301 Ginna Station n
- oE n
c E2 Licensee g,
gm Cause & Corrective
}.c u
e
- E Event
- g No.
Date
{
jj 2
!j i
Action to R* Port I Ad U
Prevent Recurrence D-d Z,,
j e
e 2
g u
o The reactor power level was maintained at 100% until February
'.2, 1985 when a unit coastdown commenced towards the Annual Refueling and Maintenance shutdown.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data
. B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
i G-Operatior =1 Error (Explain) in s v. ins II-Other (Explain)
Exhibit 1 - Same Source
9-
,.q,.:
NARRATIVE SUBBEARY'OF OPERATING EXPERIENCE DOCKET NO.
50-244
+
UNIT Ginna Station, Unit #1 DATE March, 14, 1985 COMPLETED BY
' Andrew E. McNamara TELEPHONE 1 (315) 524-4446 EXT. 301.at Ginna 900 NTH Febryary, 1985 The reactor power level was maintained at 100% until February 12 when a-l
- unit coastdown commenced towards the Annual Refueling and Maintenance shutdown.
4 4
p tr 5.~
c, s
,o
~
-GINNA STATION MAINTENANCE. REPORT
SUMMARY
FEBRUARY, 1985 During the month ofLFebruary routine maintenance and inspections were
. comp 1,eted.-
Major safety related work included:
1.
Assemble ~ Control. Room Toxic Monitor Pump 2.
. Rebuild Spare Service Water Pump
- 3.
fR 11/12-Rad Monito'r.P.M. Inspection 4.
1C Charging Pump Uncouple Inspect.-Run, & Lube
'5.
CV-355-B.A.~ Blend Valve'Insp.
?'
A O
h
r=
1
'I:
.4-s[?k J f.
}f.--i] : ""l
' $'?:-flg;3*st r
g.
-2
$bhB1 e~n 1
.;a[;Gj L
ROCHESTER GAS AND ELECTRIC CORPORATION = 89 EAST AVENUE, ROCHESTER, NN.14649 FE L E Ps4 0 N E 4RE A COct na 546 2700 GINNA STATION
^
March 14, 1985 9
e
' Director, Office of Management Information and Program Analyses U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555' J
Subject:
Monchly Report for February, 1985 Operating Status Information R.
E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
Dear Sir:
J Pursuant to our Technical Specification 6.9.1, attached F
4 herewith is the monthly operating status report for Ginna Station for the month of February, 1985.
s
(
l r,
t j
Very truly yours, hid(L Bruce A. Snow Plant Superintendent BAS /eeg Attachments cca Dr. Thomas E.
Murley NRC (1)