ML20115C282
| ML20115C282 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/30/1992 |
| From: | Baron M, Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CCN-92-14118, NUDOCS 9210190266 | |
| Download: ML20115C282 (14) | |
Text
'
NCLl1%-1411B w
PIIILADELPIIIA ELECrlHC COMi'ANY PrACH IKn'lOM KrOMIC POWl:R STATION
~
\\*6 wig gph'/
R. D.1. Ikn 20M Delta. Penm)lutda 17314 rwn sonou-tus rowim or 6 u s u aw a
('17)454701i D. B. Miller, Jr.
Vke Prendent october 15, 1992 Docket Nos. 50-277 50-278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of September 1992 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4 r
Sincerely,g l?j'fic g ynd'
,/
4%cA\\ d g f""
DBM/Ahlt[l*JN/DRN1/MJB: cmc Enclosure cc:
R.A. Burricelli, Public Service Electric & Gas T.M. Gert Ay, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident Inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC ll.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power INPO Records Center CCUNINRC l'
l t
tI 9210190266 920930 PDR ADOCK 03000277 R
NRC Monthly Operations Summary Penh Bottom Atomic Power Station September 1992 i
UNITJ Unit 2 began the month at nominal 98?c power in preparation for the upcoming refuel outage. Power was reduced to 42% on September 5 because of the failure of the "B" recire MG set controller. Power was returned 1o 95% with manual operation of the MG set scoop tube positioner. Power coastdown continued until September 12 when the generitor was removed from the grid and refuel outage activities began.
UNIT 3 Unit 3 began the month at nominal 98% power with power levels restricted due to possible feedwater flow inaccuracies. Followirg completion of feedwater flow recalibration, Unit 3 power was raised to 100% on September 5 and remained at that level until September 30. The "B" recire pump tripped on overcurrent causing a runback to 40% power. Investigation is continuing and the month ended with Unit 3 at 40% power.
i l
I CCtm2 NRC i-l:
l
Docket No. 50-277 Attachment to Monthly Operating Report for September 1992 UNIT 2 REFUEL,1NG INFORA1ATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 9 in progress.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 30,1992, 4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
No, if answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A fi.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, -
unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A COM2.NRC
i' Docket No. 50277 Attachment to Monthly Operating -
Report for September 1992
- Page 2 LNIT 2 REFUEL.ING INFORAl$1103 (Continued.)
i 7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:
(a)
Coce. 764 Fuel Assemblies (b)
Fuel Pool - 1896 Fuel Assemblies,58 Fuel Rods 8.
- The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel poci assuming the.
present capacity:
September '2003 without full core offload capability.
September.1997 with full core offload capability.
C@n2.NRC
Docket No. 50-278 Attachment to Monthly Operating -
R: port for September 1992 ENIT 3 HEFUEl,1NG INFORMATION 1.
Name'of facility:
l'ench 130ttom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 9 scheduled for September 4,1993 3.
Scheduled date te. ~
.rt following refueling Restart following refueling scheduled for October 29,1993 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
No if answer is yes. what, in general, will these be?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refuelics, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A-1' i
I CCTH11NRC
d' Docket No. 50-278
' Attachment to-
-Monthly Operating Report for September 1992 -
- Page 2 :
UNIT 3 REFUEI,1NG INFORMATION (Continued)
' 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 761 Fuel Assemblics (b)
Fuel Pool - 1945 Fuel Assemblies,6 Fuel Rods 8.
- The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fud pool storage capacity has been relicensed for 3819 fuel assemblics.
9.
The projected date of the last refueling that can 14e discharged to the spent fuel pool assuming the -
present capacity:-
September 2004 without full core offload capability.
September 1998 with full core offload capability.
l L
ccw sac l
AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50 277 UNIT PEACH BOTTOM UNIT 2 DATE OCTOBER 15, 1992 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR.
REPORTS CROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 3321-PONTH SEPTEMBER 1992
+
DAY AVERAGE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1001 17 0
'2 1002-18 0
t 3
996 19 0
4 993 20 0
5 749 21 0
6 992 22 0
7 962 23 '
0 8
965-24 0
9 945 25.
0 10 965
~%
0 11 803-27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 -
0-16-0 l'
e, t.7k Aut DAILY UNil POWER LEVEL DDtr[i h0. $0 - 278 UNil fl ACH B"J110M UNil 3 Daft DCt0EER 15, 1992 CCMPANY FMILADELFHIA ILICTRIC COMPANY M. J. BARON SUPERVISOR SIPORis CROUP tt ACH 60110H ATOMIC toutR $TAiION 1(LFFH0kE (717) 456-7014 Lxi. 33?1 MONTH LEPfLMLER 1992 DAY AVERAGE DAILY POWla Livlt LAY AVERACE DAILY POWLR LEVEL (MWE NET)
(PWE ht')
~~
1 1018 17 1034 2
1919 18 1034 3
1022 19 1C39 4
102*
20 1034 5
1033 21 1028 6
1029 22 1037 7
102S 23 1029 8
133S 24 1029 9
1023 25 1037 10 1046 26 1037 11 1023 27 1037 12 1025 28 1040 13 1039 27 1044 14 1029 945 15 10_;
16 1033
00 ERA 11NG DATA REPORT DOCKET k9. 50 + 277-DATE OCT08tR 15,1992 COMPtf FED BY PHILADELPHI A ELECTRIC COMPANT N. J. BARON SUPERVISOR REPORi$ CROUP PEACH 80ff 0M ATENIC POWER STATION TELEPHONE (717) 456 7014 Ext. 3321 1
0FERAtlNG STATUS
- 2. REPURilNG PERIDO: LEPTEMSED, 1992 l
- 3. LICENSED -1HERMAL PDWER(MWT):
3293
- 4. NAMEPLATE RAT!NG (GROS $ MWE):'
11$2
- 5. DEllGN ELECIRlCAL kAtlNG INET MWE):
1065
- 6. MAxlMJM DEPENDABLE CAFACITY (GROS $ MWE) -1{9
- 7. MAxlHUM DEPENDABLE CAPAC11Y (NET MWE):
1055
- 8. IF CHANCES OCCUR IN CAPACITY RAllNGS (11 EMS NUMBER 3 THkDUGH 7) $!NCE LAST REPORT, GIVE REASONS:
- 9. POVtR LEVEL TO WHICH RESTRICfED, if ANY (NET MWE):
- 10. R*ASONS FOR RESTRICTIONS, IF ANY:
i i
L This MONTH TR+10 DATE CUMul. Af lVE
- 11. HOUR $ IN RIPORilNG PERIOD 720 6,5 75 159,911-
- 12. NUMBER Of HOURS AEACTOR WAS Crit! CAL 2*f.0 5,568.1-97,822.1-
- 13. REACTOR RESERVE SHufDOWN Hour $
0.0 0.0 0.0
- 14. HOURS GENERATOR 04 LINE 268.0 5,320.7 94,158.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. CROS$ THERMAL EAERGY GENERATED (MWH) 803,640 16,781,064 279,320,793
- 17. GROSS ELEC181 CAL ENERGY GENERA 1ED (MWH)
'259,100 5,563,000' 91,251,590
- 18. hET ELECTRICAL iNERGY GEkERATED (MWH) 245,762-5,369,826.
E7,987,059 PAGE 1 0F 2 e
,_J-
_.._-.._-____.-_..__m_._
..... ~. _ _.. _. _ _... _.. - _ _ _ _.. _ _._ _ _. _ _, _ _.
CWERAtlNG **.TA REFORT (CONilNU[D)
. DOCKET No. 50 277 I
DATE OCTCatR 15, 1992 THis MONTH YR 10 DATE CUMULAllvt
- 19. UNIT SERVict FACTOR 37.2 80.9 58.9 2J. UNIT AVAILABILITY fat 10R 37.2 80.9 58.9
- 21. UNIT CAPACITY FAC102 (U$iNG MDC NET) 32.4 77.4 52.?
- u. UNIT CAPACITY I ACTOR (USING DER NET) 32.1 76.7 51.7
- 23. UNIT FORCtD OUTACE RATE 0.0 13.1 14.5
- 24. $HUfDOWWF SCHEDUlfD DVER NEXT 6 MONin$ (1YPE, DAlt, AND DURAil0N OF LAC.H):
J
- 25. If $HUIDOWN Ai (ND OF ACPORT FERIOD, EST! MATED DATE Of ifARTUP "wente r 30, 1992 l
1
- 26. units IN Itsi $1ATUS (PRIOR TO CC6dERCIAL OPERAi!ON):
f0 RECAST ACHIEVID i
INit!AL CR111 CAL.lfY 09/16/73 INiilAL (L(CTRlC;1Y 02/18/74 COMMERCIAL OPERATION 07/05/74
- FACE 2 0F 2 i
l.
l i.
t w -
+'ve e 1e. e e n r rww,-= = =
w we w gm-.-
w.-+-.e+.-.e tv,
.ee.e-.-*e
- weve r m--eme---
e-
,+e-
.c----vy m--
.c-wo-2,+w-rwi, rv w
-y e
y, yrv-wr - -we r-
--+-v
4 OPLEAlj4G CATA RtPORT DOCKli NO. 50 278 DATE DCTDBER 15, 1992 CDMPLE1[D BY PHilADELPHI A ELECTRIC CDMPANY M. J. BARON
$UPERVISOR-REP 6RTS GROUP PEACH B0fiOM AfDMIC POWER STA110N TELtPHONE (717) 456 7014 Exi. 3321 OPERATING STATUS 6
- 1. UNIT NAMts PEACH CofiOM UNif 3 N0fts:
- 2. REPOWilNG PERIOD: SEPitMBER, 1992
- 3. LICENSED THIRMAL POWEk(MWT):
3293
- 4. WAMEPLAff RAtlNG (CROSS MWE):
1152
$. DE$1CN ELECTRICAL RAilWG (NET MWE):
1065
- 6. MAXIMUN DEPINDABLE CAPACITY (GROS $ MWE): 1098
- 7. KAXIMJM DEPENDABLE CAPAC11Y (NET MWE): -1035
- 8. If CHANGES OCCUR IN CAPACITY RAi!NCS (litMS NUMBER 3 1HRoucw 7) $1NCE LAST REP 0RT, CIVE REA$0N$8
- 9. POWER LEVEL 10 WHICH RESTRICTED, IF ANY (NET MWE);
I
- 10. RLAt0NS FOR RESTRICil0NS, IF ANY:
l l
THIS MONTH YR 10 DATE CUMULail"E
- 11. HOURS IN REPORTING PERIOD 720 -
6,575 155,807
- 12. r>MBER OF HOURS RfACTOR WAw CRlilCAL 720,0 6,087.3' 94,449.4 1?. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0.
0.0 l-
- 14. HOURS GENtRATOR ON LINE 720.0 5,804.2 93,909.2
- 15. UNti AESERVE SHbfDOWN HOURS 0.0 0.0 0,0
- 16. CROS$ THERMAL ENfRGY GENERATED (MWH) 2,352,336 17,700,B88 -
273.794,818
~
- 17. CROS$ ELECTRICAL ENERGY GENERATEL (MWH) 768,200 5,876,500' 89,879,032
- 18. NET ELECTRICAL LNERGY GENERATED (MWH) 740,719 5,674,816 B6,157,333 PACE 1 0F 2 r
- i 1..-.m.
.m,-_
--,,,s,.-
m..
h
+
(#tR AflNG D AT A REPORT (CONilNUf D) 00CK11 No. 50 278 DAll OCTOBER 15, 1992 INi$ MON 1H YR 10'DATE CUMt't Allv!
- 19. UNIT SERVICE FACTOR 100.0 B8.3 59.8
- 20. UNlt AVAILABILITY FAClok 100.0 88.3 59.8
- 21. UNil CAPACITY FAC10R (U$lkG HDC WLT) 99.4 83.4 53.4
- 22. UN11 CAPAC11Y I AC1DR 4USING Dik WLT)
-96.6 81.0 51.9
- 23. UNIT FOACED OUTAGE RATE 0.0 6.8 12.4
- 24. $HUTDOWN$ WMEDuttb CVER NEX16 MONTH $ (TYPC, DAlt, AND DURAll';N Of (ACH):
- 25. If $HUIDOWN.1 (ND OF REPORI l'!RIOD, t$11MAffD Daft 0F $1ARTUp: N/A
- 26. UN!1$ IN It$1_ $1ATUS (PRICR 10 COMMERCI AL OPERA 110.): _
FORECA$1 ACNitVfD --
IN111AL CRillLAll1T 08/07/76 INITIAL ELECTRIC 11Y 09/01/74 COMMERCIAL OrtRA110N 12/23/74 b
lb PAGE 2 of 2 M4 sua u
i y
-m
.__.-_m..
___..m
~
- 1 i
e
-e UNil $HU1 DOWNS AND POWER REDUC 110N5 DOCKET NO. $0 277 UNIT NAME F'EACH BOT 10H UNIT 2 DATE DC10CE' 15, 1992 EEPORT buNTH CEPTEMBER,1992 COMPLETED BY PHlLADELPHIA ELECitlC COMPANY M. J. BARON
$VFERVI$0K 1
(EPORTS CROUP PEACH B0110N ATONIC PDWER $f Af t0N TELEPHONE (717) 456*7C14 Exi. 3321 METH00 Of LICENSEE
$1$1EM COMPONENT CAUSE AND CORRECTIVE' TYPE DURATION REASON SHUfflNG DOWN EVE N T CDDE CODE ACil0N TO kO.
DATE t*).
(NOURS)
(2)
REACTOR (3)
REPORT #
(4)
(b)
PREVENT RECUkRENCE
- 17 920905 F
0.0 A
4 bA CB IN5iLJ RECIRC PUPD TRIP DUE 10 POS1110NER MALFUNCil0N 10 920912 5
0.0 C
1 NA RC FUELXX
$HUIDOWN FOR RETUEllhG OUTACE
- a l -.
l I
(1)-
(2)
(3)
-t, T - FORCED REASON METHOD EXHIBIT C th5TRUC110NS
$ SCHEDULED A EQUlPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 8 - MAINTENANCE OR TEST 2 RANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C RETUELING 3 - AUTOMATIC SCRAM.
EVENT. REPORT (LER)
D + RECULATORY RE57RIC110N 4 - OTHER (EXPLAIN)
FILE (NUREG.0161) 7 E OPERATOR TRAlkiWG + LICENSE LXAMINATION l -
Lf + ADMINISTRATIVE (5) l G + OPERAT10NAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBlT I SAME SOURCE l-h b
l
_-.m
.-_m
__.-._.m.__-
~.--
.~_.--m_-m.
m 4
o'
- j i
UNIT SHUIDOWNS AND PpWER REDUCil0NS DOCKEi NO. 50 278 UNil hAME PEACH B0iiOM UNii 3 Daft oCf%CR 15,1972 RlPORT MONTH SEPTEMBER, 1992 COMPLETED Sf PHILADELPHIA ELECTRIC COMPANY M. J. BARDW
$UPC2 VISOR REPDRTS GROUP PEACH B0f f 0H ATOMIC POWER STAi!ON TELEPHONE (717) 456 7014 (XT, 3321-l METHOD OF LICENSEE Sf"*EN COMPONENT CAUSE AND CORRECilVE 1Yit DURAll0N REASON SHUTTING DDWW EVE NT L. 2 CODE ACil0N 10 NO.
DATE (1)
(HOURS)
(2)
REAC10R (3)
RtPDRT #
(4)
(5)
PREVENT RECURRENCE i
22 920930 F
0.0 A
4' NA CB thSTRU rec!RC PUMP 1 RIP DUE 10 FLOW CONTRULLER PROBLEM REACTOR NOT SHUT DOWN A
(1)
(?)
(3)
(4)
[ TORCED REASON METHOD EXHlBli G '!NSTRUCTIONS S SCHEDULED A EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARAi!ON OF DATA
- B MAINTENANCE OR 1[ST 2 MANUAL SCR AM.
ENTRY SHEETS FOR LICENSEE' C REFUELING 3 - AUTOMATIC SCR AN.
EVENT REPORT (LER).
D - REGULATORY RESTRICTION
- OTHER (EXPLAIN) f1LE (NUREG 0161)
E O?!RATOR 1 RAINING + LICENSE EXAMINAi!CN
~
F - ADMINISTRATIVE
-(5)-
G OPERAll0NAL ERROR (EXPLAlN)
H - OTHER(EXPLAIN)'
EXH1Bli ! - SAME SOURCE
. i
.a,
,,., =. -....,,.,,, - - - -.., -,
--.,..w.-
-. =,..., - - -.. - - - - - - -. - - - -., - -. -. - - - -, ~ - - - ~ - - - - - -~