_ _ _ - _ _ - _ _ _ _

Attachment to TXX. M1

, Page.1 cf 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERABNG REPORT DOCKET NO: 50445 UNIT: CPSES 1 DATE: October 14,1992 COAPLETED BY: Glenn Davis TELEPHONE: 817 497-5277 OPERATING ST ATUS

1. Reporting Period: SEEIEMBER 1992 Gross hours in reporting period: 220
2. Currently authorized power level (MWt): 3111 Max. depend. capacity (MWe-Net): lifiQ
  • Design Electrical Rating (MWe-Net): 1150
3. Power level to which restricted (if any) (MWe-Net): HQIla h 4. Reasons for restriction (if any):

THIS MONTH YR TO DATE CUMULATIVE

5. Number of hours reactor was critical 720 6422.4 14837.6 0 20,8 2003.3
6. Reactor reserve shutt'own hours
7. Hours generator on line 720 63365 14545.7 0 0 0
8. Unit reserve shutdown hours 2,435 S75 20,184,063 45,516.057

, 9. Gross thermal energy generated (MWH)

10. Gross electrica' energy generated (MWH) 814,2 6, M . M 15,W,M
11. 779,666 6,427S29 14,323,493 Net electrical energy generated (MWH)
12. Reactor Service factor 100 97.7 79.3
13. Reactor availability factor 100 98.0 90.0
14. Unit service factor 100 96.4 77.7
15. Unit availability factor 100 914 77.7
16. Unit capmy factor (Using MDC) 942 85.0 66.6
17. 94 2 85.0 66.6 Unit capacity factor (Usir:0 Design MWe)
18. Unit forced outage rate 0 3.6 7.9
19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each): Refueling outage 2 is scheduled to begin October 22,1992, with a duration of 70 days.

20, if shutdown at end of report period, estimated date of startup:

21. Units in test status (prior to commercial operation): ACHIEVED Commercial Operation 900813.

Estimated l 9210190236 920930 b, PDR ADOCK 0500 R

i Attachment to TXX. 92491 Page2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET to: N UNIT: CPSES 1 DATE: October 14,1992 COMPLETED BY: Glenn Davis TELEPHONE: 817-8976277 MONTH: SEPTEMBER 1992 CAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1085 1085 1 17 2 1091 1064 18 3 1089 1022

__ 19 4 1077 1097 20 5 904 1097

_ 21 6 1076 1097 22 7 1083 1097 23 8 1089 24 1077 9 1080 25 1090 10 1080 26 1096 11 1M 27 1098 12 1082 28 1096 13 1084 29 1099 14 ~1006 30 1E 15 1064 31 16 1085

Attachment to TXX. 92491 Pacs 3of 8 SUMM ARY OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50445 UNIT: CPSES 1 DATE: October 14,1992 COMPLETED BY: Glenn Davis TELEPHONE: 8174976477 MONTH: SEPTEMBER 1902 M01 0000 Unit started the rnonth in mode 1 with the reactor operating at approxirnately 100 percent of rated thermal power.

0WJO 2400 Unit ended the month in mode 1 with the reactor operating at approximately 100 percent of rated thermal power.

4

Attar.hment to TXX. 92491 Page 4 o! .8 ,,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNCt M -

UNIT: CPSES 1 DATE: October COMPLETEDBY: Glenn Davis

~

REPORT MONTH SEPTEMBER 1092 METHODOF TME SHUTTING DOWN Ff0RCED DURATION T}4ERE/CTOROR M1 DATE S:SCHEDlHD & LOURS) MASON REDUCrGPOVER CQRRECTNEACTK)NSCOMMENTS No shutdowns or signincart power reductions oca;rred curing the morth.

f i

1) EASON .
2) METHOD A EQUIPMENTFAILURE(EXPLAIN) E OPERATOR TRANNG AND LICENSE EXAMNATION 1: MANUAL 1 B: MAINTORTEST F: ADMMSTRATNE 2: .MANUALSCRAM C: REFUELNG G- OPERATIONALERROR(ECPLAN) 3: AUTOMATICSCRAM D: EGLtATORYM1HCTiON H: OTHER(EXPLAIN) 4: OTHER(EXPLAIN)

_ __ _