Ken n -

Detroit an Ecison n=,m,__,

~ ~ "

o8o' 's Reg Guide 1.16 October 15, 1992 NRC-92-0105 U. S. Nuclear Regulatory Commission Attention Document Control Desk Washington, D.C.

20555 i

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating Liccise W. NPF-43 P

Subject:

Honthly Ope"'u g Status Report for September, 1992 4

Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for September, 1992. This report g

includes the Operating Data Report, Average Daily Unit Power level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technica)

Specification 6.9.1.6.

(

1 If you havt any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, Enclosure cc:

T. G. Colburn A. B. Davis D. R. Hahn H. P. Phillips S.

Stasek P. L. Torpey 921019 %

$o b 41

-r~ g M j

PDR A

PDR

/[/

R

4 o

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE October 15, 1992 TELEP110NE (313) 586-5148 OPERATING STATljS 1.

UNIT NAME:

Fermi 2 l Notes:

(1) Calculated using l

2.

REPORTING PERIOD: September, 1992 l weighted averages to reflect l

3 LICENSED 11(ERHAL POWER (HWt):. 3293 i variations in HDC.

I 4.

NAMEPLfTE RATlWG (CROSS HWe):

1154 l

l 5.

DESIGN ELECT RATING (km, HWe): 1093 l

l 6.

HAX DEPENDABLE CAP (GROSS HWe):1110 l

l 7

HAX DEPENDABLE CAP (Net HWe):1060 l

l 8.

IF Cl!ANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 "4ROUGil 7) SINCE LAST REPORT, GIVE REASONS: N/A 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net):

N/A

10. REASONS FOR RESTRICTION, IF ANY:_ N/A TilIS HONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 720 6,575 41,101
12. HRS REACTOR WAS CRITICAL 266.1 6,015 3 31,279
13. REACTOR RESERVE SilUTDOWN llRS 0

0 0

14. HOURS GENERATOR ON-LINE 266.2 5,982.8 30,009.6
15. UNIT RESERVE SifUTDOWN 110URS 0

0 0

16. GROSS THERHAL ENERGY GEN (Mill) 841,152 19,481,040 90,962,231.4
17. CROSS ELECT ENERGY GEN (HWH) 282,620 6,623,970 30,272,007
18. NET ELECT ENERGY GEN (HWH) 268,866 6,344,765 22.937,001
19. UNIT SERVICE FAUTCR 37 91 73 l-
20. UNIT AVAILABILITY FACTOR 37 91

___ 73

21. UNIT CAP FACTOR (USING HDC NET) 35.2 91 65.8 (1)
22. UNIT CAP FACTOR (USING DER NET) 34.2 C8.3 64.4
23. UNIT FORCED OUTAGE RATE O

23 7.9

24. SHUTDOWNS SCilEDULED OVER NEXT 6 HONTI!S (TYPE, DATE, DURATION OF EACH):

Refueling: Started September 12, 1992: Duration 57 days.

25. IF SHUT DOWN AT END OF REPORT PERIOD, FSTIMATED DATE OF STARTUP: N/A
26. C'ITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

AVEllAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2-DATE October 15, 1992 COHOLETED BY.

E. Dawson TELEPii0NE L13)586-5027 Honth September, 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(HWe-Net) 1 1066 17 0

2 1054 18 0

3 1041 19 0

4

052 20 0

5 1041 21 0

6 1028 22 0

7 1026 23 0

8 1024 24 0

9 1024 25 0

10 1023 26 0

11 848 27 0

12 11 28 0

13 0

29 0

14 0

30 0 -

15 0

31 N/A 16 0

UNIT SHUTDOWNS AND POWER REDUCTlCNT DOCKET NO.

50-3<1-DATE October 15

'1992-j

- UNIT NAME Ferm+ -

COMPLETED By B. J. Stone' 2

11 TELEPHONE (313) *Jf-5148 REPORT WONTH September. 1992 i

I l

i

~l

' SHUTTING DOWN NO.

CODE CODE ACTION YO PREVENT METHOD O*

LER SYS COMA CAUSE & LORRECTIVE i

I.

NO.

DATE TYPE DUR REASON

' (')

(HRS)

(2)

.THE REACTOR (4)

(5)

RECURRENCE (6)-

(3)

. 92-02

. 09/12/92 S

453.8 C

1 N/A 1 --

Removed main turbine generator from l

j system grid f or-the scheduled re-j fueling outage, 6

I I

(1) F: FORCED (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS ~

5: SCHEDULED A - EQUIPMENT FAILURE'(EXPLAIN) 1 - MANUAL FOR PREPARATION 05 DATA I

B - MAINTENANCE OR. TEST 2 - MANUAL SCRAM ENTRY SHEETS F04 LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT'(LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED

.(NUREG-0161) f E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER.

-.G - OPERATIONAL ERROR (EXPLAIN) i H:- OTHER ( EXPLAI N)

(5) ExHISIT 1 - SAME SOURCE

~

(6) R - PREFIX INDICATES POWER REDUCTION.

S - PREFIX IN91 CATES PLANT

[

i SHUTDOWN.

t j.

6 l

Ji 4

6 e

4 -

9 w

f 4

d s --

M