Text
-. _ - - _ _ _ - _ _.
.g l' W ENTERGY
@* f *""~""'
-1: 7.-
October 15, 1992
- w. T. cotu.
T ll.r. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
20555 Attention:
Document Contro; Desk
Subject:
Grand Gulf Nuclear Station Unit 1 Occket No. 50-416 1.icense No. NPC-29 Monthly Operating Report GNRO-92/00127 Gentlemen:
In accordance with the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing tne Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for September 1992, if you have any questions or require additior'l information, please y
contact this office.
Yours truly, e w r '~'e s-e m WTC/IMC/cg attachments: 1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdowns and Power Reductions cc:
(See next page)
~
MOOPSEP - 1 9210190209 920930 gDR ADOCK0500g6
///
- - _ = _ -
P s.-
'Ortober 15, 1992 GNRO-92/00127J Page 2 of 3 cc:-
Mr. D. C. Hiacz (w/a)
Mr. J. L.' Mathis (w/h)
Mr. R. B. McGehee (w/a)
Mr. N. S.-Reynolds (>"a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator:
U.S. Nuclear Regulatory Commission Region II 101 Marietta St.,-N.W., Suite 290u
. Atlanta,-Georgia 30323 Mr. P. W.' 0'Connor, Project Manager (w/9).
Office of Nuclear Reactor Regulat...
U.S. Nuclear Regulatory Commission e
Mail Stop 13H3 Washington, D.C.
20555 1
s l
M00PSEP - 2
- ' to GNRO-92/00127 DOCKET NO.-
50-416 DATE 10/02/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)437-2334-
- j OPERATING STATUS l',
Unit Name: GGNS UNIT 1 Notes:
1 2.
Reporting Period: September 1992 3.
Licensed Thermal Power (MWT): 3833 MWT i
l 4
Nameplate Rating (Gross MWE): T372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
ikyM9m Dependable Capacity (Net MWe): 1143 MWE 8.
If Changn t ur in Capacity Ratings (Items Num5er 3 Through 7) Since Last Report.
.Give Reasons:
N/A Power Level To Which Restricted, in Any /A(Net MWe):
N/A 9.
- 10. Reasons for Restrictions, If Any:
N Thir Month Yr to Date Cumulative-
- 11. Hours In Reporting Period 720 6,575 69,687
- 12. Number of Hours Reactor Was Critical 720.0 5,140.0
- 55,33TT f
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generat u On-line 720.0 4,954.3 53,004.7
- 15. Unit Reserve Shutdown Hours 0
0 0-
- 16. Gross Thermal Energy Generated (MWH) 2,744,431
_18,124.756 183,847 950-
- 17. Gross Electrical Energy Generated-(MWH) 878,031 5,779,467 58,34,5 7-
- 18. Net Electrical. Energy Generated (MWH)
-843,347 5,544,095 55,804,810
- 19. Unit Service Factor 100.0 75.4 78.6
- 20. Unit Availability Factor 100.0 75.4 78.6
~21. Unit Capacity Factor (Using MDC Net) 102.5 73.8 74.9
- 22. Unit' Capacity Factor (Using DER Net) 93.7 67.5 67.9
- 23. Unit Forced Outage Rate 0.0 6.7 6.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
~25. If Shut Down At-End of Report Period.
Estimated Date of Startup:-
- 26. Units In Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY-08/18/82
~
INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 MOOPSEP/SCMPFLA J
.i.
.~
. to GNRO-92/00127 DOCKET NO.
50-416 UNIT-1 DATE 10/02/92 COMPLETED BY
- c. F. Daughtery TELEPHONE 601-437-2334 MONTH September 1992 DAY AVERAGE-DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1132
.! 7 1170 2
1167 18 1168 3
1119 19 1154 4
1173 20 1170 5
1158 21 1170 6
1169 22 1176 7
1171 23 1188 8
1166 24 1188 9
1167 25 1186 10 1168 26 1173-11 1177 27 1181 12 1179 28 1187 13
-1175 29 1191 14 1171 30 1196 15 1175 31 N/\\
16 1173 N/A i
M00PSEP/SCMPFLR
. t'o-GNRO-92/00127-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
. 50-416 UNIT NAME 1
DATE 10/02/92 -
COMPLETED BY L. F. Daughtery:
TELEPHONE 601-437-2334 REPORT MONTH September 1992
{
t
-l l-l l
l l
Method of l Licensee l
l l
Cause & Corrective l
luNo. [ 'Date l
Type Duration l Reason [ Shutting Downl Event-Syster l Component i Action To 1.
~
.l l
(1)
Hours
]
(2) l Reactor' l Report #-
Code Code l
Prevent Recurrence l
I I
I I
(3)
I (4)
I (5)
I (C&CA) l l
l 1-
.l' i
1 i
i None l l
l l
l l.
'l I
i i
l l
l-I I
I i
1 I-i I
i i
i I
I 1
I I
I I
i i
i l
i I
I i
- I i
1 1
I I
I I
I I
i UNIT SHUTDOWNS AND POWER REDUCTIONS 4
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions-S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee i
B-Maintenance or Test 3-Automatic Scram Event Report (LER)
C-Refueling Continued File (NUREG-0161).
D-Regulatory Fiestriction S-Reduced load l
l E-Operator Training &
6-Other L
Licensing Examination l
F-Administrative 5
i G-Operational Error Exhibit 1-Same Source (Explain) l H-Other (Explain)~
L M00PSEP/SCMPFLR-1 n,
e n
u
..g.,,.
b' e
NRC SUBMITTAL CERTIFICATION FORM (Miscellaneous)
I.
Letter Number (List GNR0, GNRI, LER, Violation, etc.) September Operating Report L. F. Dae]htery 10/02/92 Document Originator Date II. Certification: Responsible Section/ Organization Engineering Support Page/
Sentence Paragraph Number Number / Numbers
- BASIS.
' COMMENTS Attachments. 1, 2, Data and calculations based on GGNS Unit'1
&3 All
{ switchboard Log, Rx Eng. Fuel Accounting
'l Program and STA Log entries.
1
- 8 asis:
1)
Indicate when an action was or will be done (date)'and bow.
y/N(',M M k /p/N)9 n Responsible Supv/ Supt Date/
~
2)
If statement of fact list supporting document (s) i.e., UF5AR, P&ID, Procedures, etc.
_ JPd r 3/ry/6 C
3)
May be a statement or conclusion which is only supported by s,.
engineering judgement which must be described under basis.
Responsible Manager Date
- Signature indicated certification of the accuracy of indicated portions of the document. Document may be certified with comments.