Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F1192-07, Requests NRC Approval of Temporary non-code Repair to Moderate Energy Portions of Nuclear closed-cycle Cooling Sys.Util Separately Filed Response to GL 90-05 Which Addresses Handling of Repairs.Response Awaited + (03:28:59, 13 December 2024)
- ML20116G961 + (03:29:00, 13 December 2024)
- TXX-9252, Forwards Advance Draft FSAR to Facilitate NRC Review of Cooling Pond Hydrothermal Analysis in Support of Licensing Unit 2.Encl Matl Will Be Incorporated in FSAR Amend 87 Currently Scheduled for Dec 1992 + (03:29:00, 13 December 2024)
- ML20116G960 + (03:29:01, 13 December 2024)
- ML20116G948 + (03:29:02, 13 December 2024)
- ML20116G943 + (03:29:02, 13 December 2024)
- ML20116G938 + (03:29:03, 13 December 2024)
- ML20116G930 + (03:29:04, 13 December 2024)
- ML20116G928 + (03:29:04, 13 December 2024)
- ML20116G927 + (03:29:05, 13 December 2024)
- ML20116G915 + (03:29:06, 13 December 2024)
- ML20116G918 + (03:29:06, 13 December 2024)
- RC-96-0186, Clarifies Info Provided to NRC in Util Ltr Re Response to Question 1.d of NRC RAI .Response to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Encl + (03:29:07, 13 December 2024)
- ML20116G910 + (03:29:07, 13 December 2024)
- ML20116G900 + (03:29:08, 13 December 2024)
- ML20116G895 + (03:29:10, 13 December 2024)
- ML20116G891 + (03:29:11, 13 December 2024)
- BVY-92-126, Monthly Operating Rept for Oct 1992 for Vermont Yankee Nuclear Power Station + (03:29:12, 13 December 2024)
- ML20116G887 + (03:29:12, 13 December 2024)
- ML20116G881 + (03:29:13, 13 December 2024)
- 05000339/LER-1984-011, :on 841019,20,22,1102,1203,07,11 & 850113, Emergency Diesel Generator 2H Tripped.Cause Under Investigation.Tech Spec Change Requested to Test Generators in Manner More Consistent W/Mfg Recommendation + (03:29:15, 13 December 2024)
- ML20116G877 + (03:29:19, 13 December 2024)
- ELV-04052, Application for Amends to Licenses NPF-68 & NPF-81,revising Tech Spec 5.3.1 to Permit Limited Substitution of Zirconium Alloy or Stainless Steel Filler Rods for Fuel Rods Per NRC Approved Applications + (03:29:20, 13 December 2024)
- ML20116G875 + (03:29:20, 13 December 2024)
- ML20116G865 + (03:29:21, 13 December 2024)
- 05000498/LER-1992-015, :on 921003,discovered That Unplanned ESF Actuation of Component Cooling Water Pump Due to Operator Inattention.Involved Operations Personnel Have Been Counseled by Management + (03:29:23, 13 December 2024)
- ML20116G855 + (03:29:24, 13 December 2024)
- NG-92-4520, Forwards Changes to Rev 13 to QA Program Description, Incorporating Changes Submitted by Util & Listed Changes for NRC Review + (03:29:24, 13 December 2024)
- ML20116G852 + (03:29:25, 13 December 2024)
- ML20116G841 + (03:29:26, 13 December 2024)
- 05000267/LER-1985-006, :on 850319,discrepancies Discovered Between Submittal Date & Event Date Re Maint Work That Disturbed Fire Retardant Matl in Barrier Penetration Seals.Caused by Inadequate Procedures.Procedures Modified + (03:29:28, 13 December 2024)
- ML20116G835 + (03:29:29, 13 December 2024)
- ML20116G834 + (03:29:30, 13 December 2024)
- ML20116G811 + (03:29:33, 13 December 2024)
- U-602617, Responds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Gate Valves + (03:29:33, 13 December 2024)
- ML20116G793 + (03:29:34, 13 December 2024)
- RBG-20698, Revised Final Deficiency Rept DR-182 Re Limitorque Corp Motor Operator Failure on Feedwater Isolation Valve. Operator Returned to Vendor & All Damaged Parts Replaced. Vendor Tested Operator to Insure Proper Operation + (03:29:34, 13 December 2024)
- TXX-4460, Final Significant Deficiency Rept SDAR-176 Re Equipment Hatch Cover in Reactor Containment Bldg W/Attachments Bearing Against I Beams When Positioning Cover.Item Not Reportable Per 10CFR50.55(e) + (03:29:35, 13 December 2024)
- ML20116G777 + (03:29:36, 13 December 2024)
- ML20116G779 + (03:29:36, 13 December 2024)
- RBG-20695, Final Deficiency Rept DR-289 Re Misconnected Voltage Regulator Wires on HPCS Diesel Generator Supplied by Ge. Initially Reported on 850306.Voltage Regulator Wires Reterminated & HPCS Diesel Generator Revised + (03:29:37, 13 December 2024)
- RBG-20711, Interim Deficiency Rept DR-242 Re Fracture of Pinion Gear in Limitorque Motor Operator of RHR Sys safety-related Valve.Interim or Final Rept Will Be Provided by 850515 + (03:29:38, 13 December 2024)
- ML20116G745 + (03:29:38, 13 December 2024)
- 05000282/LER-1992-014-02, :on 921007,CR Responded to Fire Alarm in Area of MSSV Header for Number 12 Sg.Caused by Personnel Error. All Valves Adjusted to Nominal Setpoint + (03:29:40, 13 December 2024)
- 05000373/LER-1996-008-05, :on 960628,foreign Matl Injected Into SW Tunnel Caused Dual Unit Shutdown Due to Inadequate Work Control. Floor & Wall Repair Work in Lake Screen House Was Stopped + (03:29:42, 13 December 2024)
- 0CAN079605, Submits Proposed Change to ANO QA Manual Operations.Change Will Change Audit Frequencies.Nrc Approval Requested Prior to Implementation + (03:29:43, 13 December 2024)
- ML20116G710 + (03:29:44, 13 December 2024)
- ML20116G706 + (03:29:45, 13 December 2024)
- 05000440/LER-1992-019, :on 921009,valve Positioning Error Resulted in Inoperability of Both SLCS Trains.Caused by Personnel Error. Operator Responsible for Valve Positioning Error Counseled Re Event + (03:29:46, 13 December 2024)
- ML20116G691 + (03:29:47, 13 December 2024)
- ML20116G688 + (03:29:49, 13 December 2024)
- ML20116G683 + (03:29:50, 13 December 2024)