ML20116G961

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1992 for Beaver Valley Power Station Units 1 & 2
ML20116G961
Person / Time
Site: Beaver Valley
Issue date: 10/31/1992
From: David Jones, Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9211120203
Download: ML20116G961 (9)


Text

o 4'

'N4@

Telephone (412) 393-6000 Nuclear Group P O Box 4 Shepptrigport. PA 1%)77 00LM Noverter 9,1992 Beaver Valley Pctser Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatinct Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is subnitted for Unit 1 and Unit 2 for the month of October, 1992.

Very truly yours, r,

', W

. D. Sieber Vice President Nuclear Group DTJ/rmg Enclosures cc: NRC Regional Office King of Prussia, PA i

p W1031

_g ADOCK 05000334 / /.

an . PDR IJ

, NARPATIVE

SUMMARY

OF MONIELY OPERATING EXPERID1CE UNIT 1 OCIOBER 1992 October 1 The Unit operated at approximately 90% output in accordance through with the planned fuel cyc'le length extension.

Octotnr 8 October 9 At 1652 hours0.0191 days <br />0.459 hours <br />0.00273 weeks <br />6.28586e-4 months <br /> the Unit experienced a reactor trip due to trip of the "A" Reactor Coolant Punp caused by an electrical ground internal to the motor.

October 10 The Unit entered Mode 4 at 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br /> while cooling down to permit repairs to the "A" Reactor Coolant Pump motor.

October 11 At 0553 hours0.0064 days <br />0.154 hours <br />9.143518e-4 weeks <br />2.104165e-4 months <br /> the Unit entered Mode 5 in preparation for repairs to the "A" Reactor Coolant Pump motor.

October 12 The Unit remained in Mode 5 as repairs to the "A" Reactor ,

through coolant Pump continued.

October 29 October 30 Following conpletion of repairs to the "A" Reactor Coolant Pump, the Unit began to heatup ard entered Mode 4 at >

2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />.

October 31 The Unit entered ..ade 3 at 0705 hours0.00816 days <br />0.196 hours <br />0.00117 weeks <br />2.682525e-4 months <br /> as startup continued, and remained in this mode for the remainder of the report period.

r

AVEPM E DAILY UNIT FGiER IE/EL DOOTT NO. 50-334 UNIT- BVPS Unit 1 DATE Nov. 2. 1992 COMPLEIID BY Deid T. Jones TELElHONE (412) 393-7612 M0! TIE Octooer 199R__

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POhTR LEVEL (MWe-Net) (Mie-Net) 1 738 17 0 2 733 ._ 18 0 3 717 _ 19 0 4 729 20 0 .

5 733 21 0 6 729 22 0 7 733 23 0 8 725 24 0 9 503 25 0 10 0 26 0 11 0 27 0 ,

12 0 28 0 13 0 29 0 1

14 0 30 0-15 0 31 0 j 16 0 l'

INSEUCTIONS On this forraat, list the average daily unit power level MWe-Net for each da/ in the reporting renth. Coqmte to the nearest whole megawatt.

OPERATING DATA REPORT.

DOCKET NO.: 50 334 REPORT DATE: 11/04/92 COMPLETED BY: . DAVID T. JONES TELEPHONE: l(412)-393 7612 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
2. REPORTING PERIOD:.0CTOBER 1992
3. LICENSED THERMAL POWER (MWe): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 835
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 860 ,
7. MAX. DEPENDABLE CAPACITY (Net MWe): 810
8. IF CHANGES OCCUR IN CAPACITI RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe): None 10, REASONS FOR RESTRICTIONS,-IF ANY: N/A THIS MONTH YEAR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 745.0 7320.0 144672,0

, 12. NO. OF HRS. REACTOR WAS CRITICAL: 208.9 6783.9 92107.5

13. REACTOR RESERVE SHUTDOWN HOURS: 0,0 0.0 4482.8 14'. HOURS GENERATOR WAS ON LINE: 208.9 6783.9 90215.1
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.~ 0 0.0-
16. CROSS THERMAL ENERGY GEN. (MWH): 494631.0 17073611.0- 215585787i5-
17. CROSS ELECT. ENERGY GEN. (MWH): 162340.0 5583100.0 69381503.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 143230.0. 5252000.0- 64819550.0
19. UNIT SERVICE FACTOR: (PERCENT) :28.0 92.7 64.4-
20. UNIT AVAILABILITY FACTOR:(PERCENT) 28.0 92.7 64.4i
21. UNIT CAPACITY FACTOR-(MPC): PCT 23.7 88.6 58.0
22. UNIT CAPACITY FACTOR (DER): PCT 23;0- 85.9 56.3
23. UNIT FORCED.0UTAGE RATE: (PERCENT). 72.0 7.3 16.1
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION:0F EACH):

THE UNIT IS SCHEDULED TO SHUTDOWN FOR ITS NINTH REFUELIt4u GUTAGE ON APRIL 2. 1993. THE REFUELING OUTAGE IS SCHEDULED TO LAST FOR 70 DAYS.

25. IF SMUT DOWN AT END OF REPORT ~ PERIOD, ESTIMATED.DATE OF STARTUP:

-26. UNITS IN' TEST STATUS (PRIOR TO COMMERCIAL.0PERATION):

FORECAST ~ ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

UNIT SHUTDOWNS AND POWER REDUCTIO 45 (220%) Doc ke t No. 50-334 Unit Name BVPS Unit #1

  • Date November 4 1992 Completed By David T. Jones ,

REPORT MONTH OCTOBER 1992 Telephone (412) 393-7612 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Type 1 (Hours) Reason 2 Down Reactor 3 Report #- Code 4 Code 5 Prevent Recurrence -

15- 921001 S 0 N 4 N/A ZZ ZZZZ2Z unit continued to operate at a reduced output of approximately 90%

in accordance with the planned fuel cycle tength extension.

16 921009 F 536.1 ,A 3 92-009-00 C8 MOTORX Unit experienced a reactor trip due to a trip of the "A" Reactor Coolant Pump caused by an electrical ground internat to the motor.

1 2 3 4 F-Forced Reason: . Method: Exhibit F-Instructions for S-Schedoted A-Equipment Faiture (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling . 3-Automatic Scram (NUREG0161).

-D-Regulatory Restriction 4-Cont'd. from Previous Month E-Operator Training & License Exam 5 Reduction 5 F - Admini st rat ive 9-Other Exhibit H-Same Source.

G-Operational Error (Explain)

H-Other (Explain) a v ,

-w' - +_

, ., ' NARRATIVE

SUMMARY

OF

^

M0 tin {LY OPERATING D(PERID1CE

?>

UNIT 2-OCTOBER 1992 October 1- 'Ihe Unit operated at a nominal value of 100% output during the entire-report period.

through October 31 t

I

p 4

AVERAGE DAILY UNIT Poh'ER LWEL DOCKET No. 50-412 UNIT BVPS Unit 2 DATE Nov. 2, 1992 COMPLEIID BY David T. Jones TELEPHONE (412) 393-7612-MONIH October 1992 DAY AVERAGE DAILY PCWER LEVEL DAY AVERAGE DAILY PONER LEVEL (M0e-Net) (MWe-Net)'

1 836 17 841 2 835 18 841 3 832 19 841 4 837 20 '842 .

5 841 21 838 6 841 22 841 7 839 23 839 8 836 24 835 9 836 25 839 10 837 26 834 11 838 27 836' 12 _ 838 28 836 13 840 29 835

- 14 836 30 837 15 830 31 836

- 16 834 HISIRJCTIONS On this format, list the average daily unit power level MWe-Net for each day =in the reporting month. Corpute to the nearest whole megawatt.

OPERATING DATA REPORT DOCKET No.: 50 412 REPORT DATE: 11/04/92 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-7612 OPERATING STATUS

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. REPORTING PERIOD: OCTOBER 1992
3. LICENSED THERMAL POWER (MWt): 2652
4. NAMEPLATE RATING (Gross MWe): 923
5. DESIGN ELECTRICAL RATING (Net MWe): 836
6. MAX. DEPENDABLE CAPACITY (Gross MWe): 870
7. MAK. DEPENDABLE CAPACITY (Net MWe): 820
8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (Net MWe): . None
10. REASONS FOR RESTRICTIONS, IF ANY: N/A THIS MONTH YEAR TO 9 ATE CUMULATIVE
11. HOURS IN REPORTING PERIOD: 745.0 7320.0 43455.0
12. NO. OF HRS REACTOR WAS CRITICAL: 745.0 5957.0 37037.2
13. REACTOR RESERVE SHUTD0k. HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR WAS ON LINE: 745.0 5879.3 36761.3-
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GEN. (MWH): 1960015.0 14723406.0 90083153.4
17. CROSS ELECT. ENERGY GEN. (MWH): 656209.0 4817768.0 28992349.0
18. NET ELECTRICAL ENERGY GEN. (MWH): 623846.0 4553534.0 27359019.0
19. UNIT SERVICE FACTOR: (PERCENT) 100.0 80.3 84,6
20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 80.3 84.6
21. UNIT CAPACITY FACTOR (MDC): PCT 102.1 75.9 76.1
22. UNIT CAPACITY FACTOR (DER): PCT 100.2 74.4 75.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.2 3.4
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
25. IF SHUT'DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN. TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST- ACh_dVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A-COMMERCIAL OPERATION N/A- N/A

+ 4 Us31T SNUTDOVNS AWD POWER REDUcitoWS (220%) Docket No. 50-412 Unit Name BVPS Unit #2

  • Date . November 2. 1992 Completed 8y David T. Jones REPORT MONTH OCTOBER 1992 Telephone (412) 393-7612 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No. Date Typel (Nours) Reason 2 Down Reactor 3 Report &' Code 4 Code 5 Prevent Recurrence NONE 1 2 3 4 F-Forced Reason: Method: Exhibit F-Instructions for S-Scheduled 'A-Equipment 7aiture (Explain). 1-Panual Preparation of Data Entry Sheets B-Maintenance or Test 2-renual Scram for Licensee Event Report.(LER) File C-Refueling .3-Automatic Scram (kURECD161).

D-ReJu'atory Restriction 4-Cont'd. from Previous Month E-Operstor Training & License Exam 5-Reduction 5 F-Administrative 9-Other Exhibit n-Same Source.

G-Operational Error (Explain}'

H-Other (Explain) m