TENNESSEE VALLEY AUTHORITY CH ATTANOOGA,. TENNESSEE 37401 400 Chestnut Street Tower II 85 MPcR725,A 89455 7 BLRD-5043 8/84-50 BLRD-50-439/84-46 U.S. Nuclear Regulatory Camission Region II Attn:
Dr. J. Nelson Grace, Regioml Achinistrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Dear Dr. Grace:
BELLEFWTE NUCLEAR PLANT WITS 1 AND 2 - WAUTHORIZED SUBSTITUTIm 0F UNISTRUr ATTAWENTS FOR SSDs - BLRD-50-438/84-50, BLRD-50-439/84 SUPPLEENTAL FINAL EPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on September 17, 1984 in accordance with 10 TR 50.55(e) as NCR 3436.
Our first interim report was sutaitted on October 12, 1984 and our final report on Febemry 13, 1985.
Below is our suppleent to our final report.
The date of Fetrmry 17, 1985 for completion of corrective actions indicated ir. our final report on this matter was not met. TVA approved the revised anchor substitution criteria on an interim basis via the field change request (FG) p'ocess to expedite implenentation. The FCR's paper work required has delayed issmnoe of the official design drawing. The corrective action cn this matter will be completed by April 15, 1985.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY r
gJ. W. Hufham, Manager Licensing and Regulations cc:
Mr. James Taylor, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8505010636 850325 PDR ADOCK 05000438 S