Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128G411 + (18:57:02, 12 December 2024)
- B14368, Documents Two Title Changes within Util.Effective 920711, Je Scace Elected vice-president of Millstone & Jp Stetz Elected vice-president of Haddam Neck Station.Revs to Distribution List Contained in Encl + (18:57:03, 12 December 2024)
- ML20128G410 + (18:57:03, 12 December 2024)
- ML20128G407 + (18:57:04, 12 December 2024)
- ML20128G406 + (18:57:04, 12 December 2024)
- ML20128G405 + (18:57:05, 12 December 2024)
- ML20128G403 + (18:57:06, 12 December 2024)
- ML20128G404 + (18:57:06, 12 December 2024)
- NSD-NRC-96-4830, Forwards Markup of AP600 Reliability Assurance Program (Rap),Ssar Section 16.2 + (18:57:07, 12 December 2024)
- ML20128G400 + (18:57:08, 12 December 2024)
- ML20128G401 + (18:57:08, 12 December 2024)
- ML20128G398 + (18:57:09, 12 December 2024)
- ML20128G397 + (18:57:10, 12 December 2024)
- ML20128G396 + (18:57:10, 12 December 2024)
- ML20128G390 + (18:57:11, 12 December 2024)
- ML20128G388 + (18:57:12, 12 December 2024)
- ML20128G386 + (18:57:13, 12 December 2024)
- ML20128G384 + (18:57:13, 12 December 2024)
- 05000374/LER-1985-025-03, :on 850606 & 07,full Reactor Scrams Occurred. Caused by MSIV Being Closed in Run.Corrective Actions Will Include Operator Training,Procedure Revs & New Mode Switch Procedure + (18:57:15, 12 December 2024)
- ML20128G382 + (18:57:16, 12 December 2024)
- ML20128G379 + (18:57:17, 12 December 2024)
- ML20128G376 + (18:57:18, 12 December 2024)
- ULNRC-03455, Responds to NRC Bulletin 96-001, Control Rod Insertion Problems. Core Map & Rod Drop Time Data,Provided + (18:57:19, 12 December 2024)
- ML20128G374 + (18:57:19, 12 December 2024)
- ML20128G372 + (18:57:20, 12 December 2024)
- 05000155/LER-1993-001, :on 930111,discovered That Dose Rates on Vacuum Filter Unit on Reactor Deck Measured Above Limits & Area Not Posted as High Radiation Area.Area Immediately Barricaded Using Rope & Status Sheet Updated + (18:57:23, 12 December 2024)
- ML20128G369 + (18:57:24, 12 December 2024)
- ML20128G370 + (18:57:24, 12 December 2024)
- ML20128G368 + (18:57:25, 12 December 2024)
- RBG-38-111, Responds to Violations Noted in Insp Rept 50-458/92-34 on 921108-1219.Corrective Actions:Training Initiated for All ROs & SROs on Interpretation of TS 3.7.3, Entry Into Operational Condition & Coils in Unit Cooler Cleaned + (18:57:26, 12 December 2024)
- ML20128G366 + (18:57:26, 12 December 2024)
- ML20128G363 + (18:57:27, 12 December 2024)
- ML20128G362 + (18:57:28, 12 December 2024)
- ML20128G361 + (18:57:29, 12 December 2024)
- ML20128G358 + (18:57:29, 12 December 2024)
- ML20128G356 + (18:57:30, 12 December 2024)
- ML20128G355 + (18:57:31, 12 December 2024)
- ML20128G352 + (18:57:33, 12 December 2024)
- 05000361/LER-1985-025, :on 850330 & 31,auxiliary Sample Pump Improperly Installed.Caused by Personnel Error.Technician Attempted to Install Pump from Memory.Event Discussed W/ Technician & Disciplinary Action Administered + (18:57:36, 12 December 2024)
- ML20128G348 + (18:57:37, 12 December 2024)
- ML20128G350 + (18:57:37, 12 December 2024)
- ULNRC-03454, Responds to 960924 Telcon Re Requested Relaxation of Refuel 8 Control Rod Testing Activities.Rod Drop Time Data, Provided + (18:57:38, 12 December 2024)
- ML20128G344 + (18:57:39, 12 December 2024)
- ML20128G345 + (18:57:39, 12 December 2024)
- ML20128G341 + (18:57:41, 12 December 2024)
- ML20128G339 + (18:57:42, 12 December 2024)
- ML20128G338 + (18:57:44, 12 December 2024)
- ML20128G335 + (18:57:45, 12 December 2024)
- B15924, Provides Addl Info Re Relief Request from ASME Code Section 11 Requirements + (18:57:46, 12 December 2024)
- ML20128G330 + (18:57:46, 12 December 2024)
- ML20128G329 + (18:57:47, 12 December 2024)
- ML20128G328 + (18:57:47, 12 December 2024)